PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/24/21 EST. NO. 002 TIME 03:02 PM R.E. NAME: RANDY STELLHORN 03-2H0004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/24/21 EST. NO. 002 TIME 03:02 PM R.E. NAME: RANDY STELLHORN 03-2H0004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/24/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2H0004 TIME 03:02 PM ESTIMATE NO. 002 BID OPENING 01/21/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/21 R.E. NAME: RANDY STELLHORN DATE OF THIS ESTIMATE 05/24/21 LOCATION RERUN PROGRESS ESTIMATE 03-NEV-80-29.5/29.7 ----------------------- NEIL'S CONTROLLED BLASTING, LP NEAR TRUCKEE AND FLORISTON, FROM 490 MAIN ST FARAD ROAD TO 2.17 MILES WEST OF NEWCASTLE CA 95658 SIERRA COUNTY LINE FED. AID NO. ACIM-080 -4(208)E MITIGATE ROCKFALL AND STABILIZE CUT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,200.0000 5,200.00 1.000 5,200 002 TIME-RELATED OVERHEAD (LS) LS 49,600.0000 49,600.00 0.325 16,120.00 0.550 27,280 003 DEVELOP WATER SUPPLY LS 5,000.0000 5,000.00 0.325 1,625.00 0.550 2,750 004 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.500 2,500 005 TRAFFIC CONTROL SYSTEM LS 65,000.0000 65,000.00 0.325 21,125.00 0.550 35,750 006 PLASTIC TRAFFIC DRUMS EA 50.0000 300.00 6.000 300 007 PORTABLE RADAR SPEED FEEDBACK LS 1,500.0000 1,500.00 0.325 487.50 0.550 825 SIGN SYSTEM 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 1,800.0000 1,800.00 0.325 585.00 0.550 990 009 TEMPORARY RAILING (TYPE K) LF 78.2300 48,502.60 120.000 9,387.60 720.000 56,325 010 ALTERNATIVE TEMPORARY CRASH EA 1,800.0000 1,800.00 1.000 1,800 CUSHION 011 JOB SITE MANAGEMENT LS 28,000.0000 28,000.00 0.325 9,100.00 0.550 15,400 012 PREPARE WATER POLLUTION CONTROL PROGRAM LS 7,000.0000 7,000.00 0.250 1,750.00 1.000 7,000 013 MOVE-IN/MOVE-OUT EA 1,000.0000 2,000.00 1.000 1,000.00 1.000 1,000 (TEMPORARY EROSION CONTROL) 014 TEMPORARY HYDRAULIC MULCH SQYD 2.6000 2,522.00 0.000 0 (BONDED FIBER MATRIX) 015 TEMPORARY COVER SQYD 8.0000 7,760.00 0.000 0 016 TEMPORARY CHECK DAM LF 25.0000 8,500.00 340.000 8,500.00 340.000 8,500 017 TEMPORARY DRAINAGE INLET PROTECTION EA 1,500.0000 1,500.00 1.000 1,500 018 TEMPORARY CONSTRUCTION ENTRANCE EA 3,000.0000 6,000.00 0.000 0 019 STREET SWEEPING LS 6,400.0000 6,400.00 1.000 6,400.00 1.000 6,400 020 CLEARING AND GRUBBING (LS) LS 12,000.0000 12,000.00 0.500 6,000.00 1.000 12,000 021 DUST PALLIATIVE LS 2,500.0000 2,500.00 0.000 0 022 DITCH EXCAVATION CY 300.0000 5,100.00 90.000 27,000 PROGRAM CAS145 PAGE 2 DATE 05/24/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2H0004 TIME 03:02 PM ESTIMATE NO. 002 BID OPENING 01/21/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/21 R.E. NAME: RANDY STELLHORN DATE OF THIS ESTIMATE 05/24/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 HYDROMULCH (FRM) SQFT 0.2800 16,296.00 61,200.000 17,136.00 61,200.000 17,136 024 HYDROSEED (HBGM) SQFT 0.3600 20,952.00 61,200.000 22,032.00 61,200.000 22,032 025 DOUBLE TWISTED WIRE MESH SQFT 5.0000 262,500.00 47,250.000 236,250.00 52,500.000 262,500 DRAPERY 026 REMOVE DELINEATOR EA 100.0000 300.00 3.000 300 027 DELINEATOR (CLASS 2) EA 200.0000 800.00 4.000 800.00 4.000 800 PROGRAM CAS145 PAGE 3 DATE 05/24/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2H0004 TIME 03:02 PM ESTIMATE NO. 002 BID OPENING 01/21/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/21 R.E. NAME: RANDY STELLHORN DATE OF THIS ESTIMATE 05/24/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 358,298.10 515,288.60 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 358,298.10 515,288.60 028 MOBILIZATION LS 37,000.0000 37,000.00 0.050 1,850.00 1.000 37,000 ORIGINAL CONTRACT AMOUNT 610,832.60 TOTAL WORK COMPLETED 360,148.10 552,288.60 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 360,148.10 552,288.60 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/01/21 40 04/06/21 04/06/21 06/17/21 21 12 0 0 85% 53% PROGRESS IS SATISFACTORY RANDY STELLHORN RESIDENT ENGINEER PROGRAM CAS145 DATE 05/24/21