PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/31/18 EST. NO. 004 TIME 10:45 AM R.E. NAME: CATANIA, DAVID 03-2H0904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/31/18 EST. NO. 004 TIME 10:45 AM R.E. NAME: CATANIA, DAVID 03-2H0904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/31/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2H0904 TIME 10:45 AM ESTIMATE NO. 004 BID OPENING 05/08/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/24/18 R.E. NAME: CATANIA, DAVID DATE OF THIS ESTIMATE 10/31/18 LOCATION FINAL ESTIMATE 03-NEV-49-6.3/6.7 -------------- KNIFE RIVER CONSTRUCTION IN NEVADA COUNTY NEAR GRASS VALLEY 1764 SKYWAY AT MOTHER LODE ROAD CHICO CA 95928 FED. AID NO. HSNH-P049(175)E SUPERELEVATION CORRECTION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,500.0000 3,500.00 1.000 3,500 002 DEVELOP WATER SUPPLY LS 1,500.0000 1,500.00 1.000 1,500 003 CONSTRUCTION AREA SIGNS LS 2,200.0000 2,200.00 1.000 2,200 004 TRAFFIC CONTROL SYSTEM LS 35,000.0000 35,000.00 1.000 35,000 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 2,100.0000 2,100.00 1.000 2,100 006 JOB SITE MANAGEMENT LS 2,000.0000 2,000.00 1.000 2,000 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 850.0000 850.00 1.000 850 008 TEMPORARY CHECK DAM LF 20.0000 800.00 6.000 120 009 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 500.00 0.000 0 010 TEMPORARY FIBER ROLL LF 2.5000 2,075.00 100.000 250 011 STREET SWEEPING LS 8,800.0000 8,800.00 1.000 8,800 012 TEMPORARY CONCRETE WASHOUT LS 500.0000 500.00 0.000 0 013 TREATED WOOD WASTE LB 0.7500 303.75 300.000 225 014 CLEARING AND GRUBBING (LS) LS 10,000.0000 10,000.00 1.000 10,000 015 IMPORTED BORROW (CY) CY 100.0000 11,000.00 272.000 27,200 016 ROLLED EROSION CONTROL PRODUCT (BLANKET) SQFT 1.0000 2,660.00 0.000 0 017 COMPOST (CY) CY 207.0000 3,519.00 40.000 8,280 018 CLASS 2 AGGREGATE BASE (CY) CY 400.0000 8,800.00 39.000 15,600 019 HOT MIX ASPHALT (TYPE A) TON 165.0000 151,800.00 916.070 151,151 020 HOT MIX ASPHALT-OPEN GRADED TON 200.0000 36,000.00 209.750 41,950 (OPEN GRADED FRICTION COURSE) 021 TACK COAT TON 2,000.0000 6,000.00 3.000 6,000 022 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 20.0000 56,000.00 2,800.000 56,000 PROGRAM CAS145 PAGE 2 DATE 10/31/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2H0904 TIME 10:45 AM ESTIMATE NO. 004 BID OPENING 05/08/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/24/18 R.E. NAME: CATANIA, DAVID DATE OF THIS ESTIMATE 10/31/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PAVEMENT MARKER EA 70.0000 4,900.00 81.000 5,670 (RETROREFLECTIVE-RECESSED) 024 MILEPOST MARKER EA 45.0000 45.00 1.000 45 025 REMOVE ROADSIDE SIGN EA 50.0000 250.00 5.000 250 026 RELOCATE ROADSIDE SIGN EA 225.0000 225.00 1.000 225 027 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.2000 305.00 25.000 305 (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 028 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 14.7500 826.00 56.000 826 (0.080"-UNFRAMED) 029 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.0000 100.00 25.000 100 030 ROADSIDE SIGN - ONE POST EA 235.0000 1,175.00 5.000 1,175 031 THERMOPLASTIC PAVEMENT MARKING SQFT 30.0000 4,050.00 135.000 4,050 (ENHANCED WET NIGHT VISIBILITY) 032 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.1000 336.00 160.000 336 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 033 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.1000 6,634.00 2,200.000 6,820 (ENHANCED WET NIGHT VISIBILITY) 034 8" THERMOPLASTIC TRAFFIC STRIPE LF 4.0000 340.00 115.000 460 (ENHANCED WET NIGHT VISIBILITY) 035 12" RUMBLE STRIP STA 160.0000 2,240.00 14.000 2,240 (ASPHALT CONCRETE PAVEMENT) PROGRAM CAS145 PAGE 3 DATE 10/31/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2H0904 TIME 10:45 AM ESTIMATE NO. 004 BID OPENING 05/08/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/24/18 R.E. NAME: CATANIA, DAVID DATE OF THIS ESTIMATE 10/31/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 395,228.55 ADJUSTMENT OF COMPENSATION 0.00 -587.50 EXTRA WORK 0.00 7,875.20 SUBTOTAL AMOUNT EARNED 0.00 402,516.25 ORIGINAL CONTRACT AMOUNT 367,333.75 TOTAL WORK COMPLETED 0.00 402,516.25 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 0.00 402,516.25 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/25/18 25 07/10/18 07/10/18 08/24/18 25 9 0 0 100% 100% CATANIA, DAVID RESIDENT ENGINEER PROGRAM CAS145 DATE 10/31/18