PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/19/24 EST. NO. 005 TIME 02:42 PM R.E. NAME: GRANDY, DWAYNE 03-2J8104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/19/24 EST. NO. 005 TIME 02:42 PM R.E. NAME: GRANDY, DWAYNE 03-2J8104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION DEDUCT LTTR 4/24 -3,000.00 004 DEDUCT LTTR 5/24 -1,000.00 004 0.00 -4,000.00 TOTAL DEDUCTIONS 0.00 -4,000.00 PROGRAM CAS145 PAGE 1 DATE 07/19/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2J8104 TIME 02:42 PM ESTIMATE NO. 005 BID OPENING 05/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/24 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 07/19/24 LOCATION RERUN PROGRESS ESTIMATE 03-BUT-99-R30.6 ----------------------- 03-BUT-99-R31.5 VIKING CONSTRUCTION COMPANY, BUTTE COUNTY IN CHICO AT SKYWAY INC. OVERCROSSING AND AT EAST 20TH STREET 11315 SUNRISE GOLD CIRCLE SUI OVERCROSSING RANCHO CORDOVA CA 95742 FED. AID NO. N O N E CONSTRUCT SLOPE PAVING AND INSTALL AESTHET ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 2,200.0000 176,000.00 63.000 138,600 003 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.857 8,570 004 TRAFFIC CONTROL SYSTEM LS 225,000.0000 225,000.00 0.558 125,550 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 30,000.0000 30,000.00 0.663 19,890 006 JOB SITE MANAGEMENT LS 21,000.0000 21,000.00 0.789 16,569 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,500.0000 2,500.00 0.500 1,250 008 TEMPORARY COVER SQYD 9.0000 2,700.00 1,899.500 17,095 009 TEMPORARY CHECK DAM LF 15.5000 1,705.00 16.000 248 010 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 2,000.00 7.000 1,750 011 TEMPORARY FIBER ROLL LF 6.5000 6,500.00 75.000 487 012 TEMPORARY CONSTRUCTION ENTRANCE EA 9,000.0000 18,000.00 4.000 36,000 013 STREET SWEEPING LS 1,000.0000 1,000.00 0.000 0 014 TEMPORARY CONCRETE WASHOUT LS 10,000.0000 10,000.00 0.788 7,880 015 TEMPORARY HIGH-VISIBILITY FENCE LF 8.0000 2,720.00 216.000 1,728 016 ROADWAY EXCAVATION CY 260.0000 44,200.00 0.000 0 017 ROADSIDE CLEARING LS 5,500.0000 5,500.00 0.100 550 018 AESTHETIC FEATURE FOOTING CY 1,100.0000 88,000.00 76.000 83,600.00 76.000 83,600 019 AESTHETIC FEATURE LS 475,000.0000 475,000.00 0.400 190,000.00 0.400 190,000 020 CHECK AND TEST EXISTING IRRIGATION LS 10,000.0000 10,000.00 1.000 10,000 FACILITIES 021 REMOVE IRRIGATION FACILITY LS 10,000.0000 10,000.00 0.000 0 022 CONTROL AND NEUTRAL CONDUCTORS LS 15,000.0000 15,000.00 0.700 10,500 PROGRAM CAS145 PAGE 2 DATE 07/19/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2J8104 TIME 02:42 PM ESTIMATE NO. 005 BID OPENING 05/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/24 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 07/19/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 20.0000 5,600.00 250.000 5,000 (F) LINE) 024 8" CORRUGATED HIGH DENSITY POLYETHYLENE LF 70.0000 19,600.00 240.000 16,800 PIPE CONDUIT 025 BONDED FIBER MATRIX (SQFT) SQFT 0.2500 9,750.00 0.000 0 026 FIBER ROLLS LF 5.0000 4,000.00 0.000 0 027 CLASS 2 AGGREGATE BASE (CY) CY 425.0000 12,750.00 0.000 0 028 SHOTCRETE CY 750.0000 7,500.00 10.000 7,500 029 ADJUST PULLBOX TO GRADE EA 5,500.0000 5,500.00 0.000 0 030 SLOPE PAVING (PRECAST CONCRETE PANEL) SQFT 86.0000 1,049,200.00 12,200.000 1,049,200 031 MINOR CONCRETE (COLORED ACID STAIN), CY 3,100.0000 55,800.00 0.000 0 TYPE 1 032 MINOR CONCRETE (COLORED ACID STAIN), CY 4,000.0000 12,000.00 0.000 0 TYPE 2 033 MINOR CONCRETE (SEEDED) CY 3,500.0000 52,500.00 0.000 0 034 ANTI-GRAFFITI COATING SQFT 1.5000 18,300.00 0.000 0 (F) PROGRAM CAS145 PAGE 3 DATE 07/19/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2J8104 TIME 02:42 PM ESTIMATE NO. 005 BID OPENING 05/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/24 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 07/19/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 273,600.00 1,750,768.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 3,165.59 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 273,600.00 1,753,933.59 035 MOBILIZATION LS 267,000.0000 267,000.00 1.000 267,000 ORIGINAL CONTRACT AMOUNT 2,678,325.00 TOTAL WORK COMPLETED 273,600.00 2,020,933.59 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 -4,000.00 TOTAL 273,600.00 2,016,933.59 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/02/23 80 01/08/24 11/09/23 06/12/24 105 65 0 0 74% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU RE REQUEST GRANDY, DWAYNE RESIDENT ENGINEER