PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/21/05 EST. NO.01 TIME 04:40 PM R.E. NAME: BEHVAND, MORTEZA 03-2M0904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/21/05 EST. NO.01 TIME 04:40 PM R.E. NAME: BEHVAND, MORTEZA 03-2M0904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/21/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2M0904 TIME 04:40 PM ESTIMATE NO. 01 BID OPENING 04/19/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/05 R.E. NAME: BEHVAND, MORTEZA DATE OF THIS ESTIMATE 06/21/05 LOCATION PROGRESS ESTIMATE 03-SAC-99-R32.1/36.8 ----------------- TEICHERT CONSTRUCTION IN SACRAMENTO COUNTY IN AND NEAR P O BOX 15144 SACRAMENTO FROM ROUTE 5 AND 99 SACRAMENTO CA 95851 SEPARATION TO THE SUTTER COUNTY LINE FED. AID NO. N O N E RESURFACE ASPHALT CONCRETE OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 WARRANTY LS 12,500.0000 12,500.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.000 0.00 PROGRAM 03 WATER POLLUTION CONTROL LS 12,500.0000 12,500.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 6,200.0000 6,200.00 0.230 1,426.00 0.230 1,426.00 S) 05 TRAFFIC CONTROL SYSTEM LS 65,000.0000 65,000.00 0.000 0.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 12,500.0000 12,500.00 0.000 0.00 S) 07 REMOVE METAL BEAM GUARD RAILING M 31.0000 3,100.00 0.000 0.00 S) 08 REMOVE THERMOPLASTIC TRAFFIC STRIPE M2 31.0000 16,120.00 0.000 0.00 09 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 31.0000 9,300.00 0.000 0.00 10 REMOVE ASPHALT CONCRETE DIKE M 30.0000 1,260.00 0.000 0.00 11 RECONSTRUCT METAL BEAM GUARD RAILING M 42.0000 23,940.00 0.000 0.00 S) 12 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 6.5000 45,695.00 0.000 0.00 S) 13 IMPORTED MATERIAL (SHOULDER BACKING) TONN 58.0000 33,060.00 0.000 0.00 14 SEAL RANDOM CRACKS LNKM 1,800.0000 72,000.00 0.000 0.00 15 ASPHALT CONCRETE (TYPE A) TONN 85.5000 102,600.00 0.000 0.00 16 RUBBERIZED ASPHALT CONCRETE (TYPE O) TONN 92.2500 1,365,300.00 0.000 0.00 17 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 42.0000 23,520.00 0.000 0.00 AREA) 18 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 72.0000 3,024.00 0.000 0.00 19 TRANSITION RAILING (TYPE WB) EA 2,800.0000 5,600.00 0.000 0.00 S) 20 TERMINAL SYSTEM (TYPE ET) EA 3,300.0000 6,600.00 0.000 0.00 S) 21 END ANCHOR ASSEMBLY (TYPE SFT) EA 620.0000 1,240.00 0.000 0.00 S) 22 THERMOPLASTIC PAVEMENT MARKING M2 48.0000 14,880.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 06/21/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2M0904 TIME 04:40 PM ESTIMATE NO. 01 BID OPENING 04/19/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/05 R.E. NAME: BEHVAND, MORTEZA DATE OF THIS ESTIMATE 06/21/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 THERMOPLASTIC TRAFFIC STRIPE M 0.7000 28,070.00 0.000 0.00 S) (SPRAYABLE) 24 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 192.00 0.000 0.00 S) 25 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.7500 7,672.50 0.000 0.00 S) 26 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.7500 11,925.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 27 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.7500 660.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.4700 14,527.50 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 06/21/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2M0904 TIME 04:40 PM ESTIMATE NO. 01 BID OPENING 04/19/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/05 R.E. NAME: BEHVAND, MORTEZA DATE OF THIS ESTIMATE 06/21/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,426.00 1,426.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,426.00 1,426.00 29 MOBILIZATION LS 100,000.0000 100,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 1,999,986.00 TOTAL WORK COMPLETED 1,426.00 1,426.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,426.00 1,426.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/23/05 60 00/00/00 06/07/05 09/01/05 8 2 0 0 0% 13% PROGRESS UNSATISFACTORY BEHVAND, MORTEZA RESIDENT ENGINEER PROGRAM CAS145 DATE 06/21/05