PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/30/09 EST. NO.05 TIME 02:46 PM R.E. NAME: NOVOTA, RYAN 03-2M9304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 341.35 E.W. @ F.A.(+) 051109 N 1 0 0003 615.33 052609 N 3 0 0004 289.28 052709 N 4 0 0006 239.84 062909 N 6 0 0007 582.22 063009 N 7 0 0008 258.89 070109 N 8 0 0009 689.65 070609 N 9 0 0010 258.89 070709 N 10 0 0011 301.85 070809 N 11 0 0012 258.89 070909 N 12 0 0013 517.77 071209 N 13 0 0014 689.65 071309 N 14 0 0015 689.65 071409 N 15 0 0016 689.65 071509 N 16 0 0017 560.74 071609 N 17 0 0018 689.65 071909 N 18 0 0019 689.65 072009 N 19 0 0020 97.09 072109 N 20 0 003 0001 3,637.51 E.W. @ L.S.(+) 102909 Y 01 0 0002 978.51 A.C. @ L.S.(+) 102909 Y 02 0 13,076.06 TOTAL THIS ESTIMATE 17,749.54 TOTAL PREVIOUS ESTIMATE 30,825.60 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/30/09 EST. NO.05 TIME 02:46 PM R.E. NAME: NOVOTA, RYAN 03-2M9304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION PER LTR DATED 7/09 -5,000.00 03 0.00 -5,000.00 TOTAL DEDUCTIONS 0.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 11/30/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2M9304 TIME 02:46 PM ESTIMATE NO. 05 BID OPENING 09/23/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/10/09 R.E. NAME: NOVOTA, RYAN DATE OF THIS ESTIMATE 11/30/09 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 03-NEV-80-R2.5/20.2 ---------------------------------- DEBRUIN CONSTRUCTION INC IN EL DORADO, NEVADA, AND PLACER P O BOX 1355 COUNTIES AT VARIOUS LOCATIONS FRENCH CAMP CA 95231 FED. AID NO. N O N E TREAT BRIDGE DECKS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 0.250 500.00 1.000 2,000.00 02 PREPARE WATER POLLUTION CONTROL LS 1,200.0000 1,200.00 0.250 300.00 1.000 1,200.00 S) PROGRAM 03 CONSTRUCTION AREA SIGNS LS 4,000.0000 4,000.00 0.250 1,000.00 1.000 4,000.00 S) 04 TRAFFIC CONTROL SYSTEM LS 40,000.0000 40,000.00 0.250 10,000.00 1.000 40,000.00 S) 05 PORTABLE CHANGEABLE MESSAGE SIGN LS 4,500.0000 4,500.00 0.250 1,125.00 1.000 4,500.00 S) 06 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 2.2500 5,962.50 2,584.000 5,814.00 S) 07 REMOVE TRAFFIC STRIPE LF 1.1000 4,741.00 4,232.000 4,655.20 S) 08 REMOVE UNSOUND CONCRETE CF 110.0000 22,220.00 291.870 32,105.70 09 CLEAN BRIDGE DECK SQFT 0.1500 12,232.50 81,550.000 12,232.50 10 BRIDGE REMOVAL (PORTION), LOCATION A LS 18,000.0000 18,000.00 0.000 0.00 11 LEAD COMPLIANCE PLAN (STRIPE REMOVAL) LS 2,800.0000 2,800.00 1.000 2,800.00 S) 12 STRUCTURAL CONCRETE, BRIDGE CY 3,000.0000 6,600.00 0.000 0.00 F) 13 DRILL AND BOND DOWEL LF 45.0000 2,835.00 0.000 0.00 14 CLEAN EXPANSION JOINT LF 15.0000 2,655.00 177.000 2,655.00 15 RAPID SETTING CONCRETE (PATCH) CF 125.0000 25,250.00 291.870 36,483.75 16 CORE TREATED BRIDGE DECK EA 130.0000 2,600.00 12.000 1,560.00 S) 17 EXPANSION DAM CF 500.0000 5,500.00 0.000 0.00 18 JOINT SEAL (MR 1/2") LF 30.0000 2,370.00 79.000 2,370.00 S) 19 JOINT SEAL (MR 1") LF 30.0000 2,940.00 98.000 2,940.00 S) 20 JOINT SEAL (MR 1 1/2") LF 50.0000 5,200.00 94.750 4,737.50 94.750 4,737.50 S) 21 BAR REINFORCING STEEL (EPOXY COATED) LB 8.0000 2,504.00 0.000 0.00 SF)(BRIDGE) 22 TREAT BRIDGE DECK SQFT 0.2200 17,941.00 81,550.000 17,941.00 F) PROGRAM CAS145 PAGE 2 DATE 11/30/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2M9304 TIME 02:46 PM ESTIMATE NO. 05 BID OPENING 09/23/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/10/09 R.E. NAME: NOVOTA, RYAN DATE OF THIS ESTIMATE 11/30/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 78.5000 85,329.50 1,138.500 89,372.25 24 CONCRETE BARRIER (TYPE 25 MODIFIED) LF 5,000.0000 7,500.00 0.000 0.00 25 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 2,865.00 1,866.000 2,799.00 S) 26 4" THERMOPLASTIC TRAFFIC STRIPE LF 12.0000 18,960.00 1,512.000 18,144.00 S) (RECESSED, BROKEN 36-12) 27 4" TWO-COMPONENT PAINT TRAFFIC STRIPE LF 4.0000 12,600.00 3,168.000 12,672.00 3,168.000 12,672.00 S) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 12.0000 96.00 8.000 96.00 S) 29 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.250 250.00 1.000 1,000.00 S) SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 11/30/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2M9304 TIME 02:46 PM ESTIMATE NO. 05 BID OPENING 09/23/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/10/09 R.E. NAME: NOVOTA, RYAN DATE OF THIS ESTIMATE 11/30/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 30,584.50 302,077.90 ADJUSTMENT OF COMPENSATION 978.51 18,474.51 EXTRA WORK 12,097.55 12,351.09 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 43,660.56 332,903.50 30 MOBILIZATION LS 30,000.0000 30,000.00 1.000 30,000.00 ORIGINAL CONTRACT AMOUNT 352,401.50 TOTAL WORK COMPLETED 43,660.56 362,903.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -5,000.00 TOTAL 43,660.56 357,903.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/18/08 70 05/04/09 12/03/08 09/10/09 63 131 0 0 100% 100% NOVOTA, RYAN RESIDENT ENGINEER PROGRAM CAS145 DATE 11/30/09