PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/25/07 EST. NO.16 TIME 02:12 PM R.E. NAME: RESTAINO, MIC 03-3555U4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/25/07 EST. NO.16 TIME 02:12 PM R.E. NAME: RESTAINO, MIC 03-3555U4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE RETEST BACK CHARGE -1,500.00 04 COZEEP BACKCHARGE -3,554.00 05 TRACKING VIOLATION -3,000.00 07 COZEEP CANCELLATIONS -3,617.00 08 SWPPP -154,639.65 14 SWPPP 154,639.65 15 0.00 -11,671.00 LABOR COMPLIANCE VIOLATION PER LTR DATED 7/06 -8,000.00 03 PER LTR DATED 8/06 -8,000.00 04 PER LTR DATED 9/06 -9,000.00 05 PER LTR DATED 10/06 -10,000.00 06 PER LTR DATED 11/06 -5,000.00 07 RTN 7/06 DEDUCTION 8,000.00 07 PER LTR DATED 12/06 -5,000.00 08 RELEASE EST #5 9,000.00 08 PER LTR DATED 1/07 -10,000.00 09 RELEASE ESTIMATE #8 5,000.00 09 PER LTR DATED 2/07 -8,000.00 10 RET #6, #7 DEDUCTION 15,000.00 10 PER LTR DATED 3/07 -5,000.00 11 RETURN EST#4 DEDUCT 8,000.00 11 PER LTR DATED 4/07 -5,000.00 12 PER LTR DATED 5/07 -5,000.00 13 PER LTR DATED 6/07 -9,000.00 14 PER LTR DATED 7/07 -10,000.00 16 RETURN 3/07 DEDUCT 5,000.00 16 RETURN 4/07 DEDUCT 5,000.00 16 0.00 -42,000.00 OVERBID ITEMS OVERBID ITEM NO. 304 -722.03 04 OVERBID ITEM NO. 304 -361.01 06 OVERBID ITEM NO. 304 -288.81 12 0.00 -1,371.85 TOTAL DEDUCTIONS 0.00 -55,042.85 PROGRAM CAS145 PAGE 1 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 LOCATION RERUN PROGRESS ESTIMATE 03-ED-50-16.7/18.1 ----------------------- MITCHELL ENGINEERING IN EL DORADO COUNTY IN PLACERVILLE P O BOX 34367 FROM 0.2 KM WEST OF WEST SAN FRANCISCO CA 94134 PLACERVILLE UNDERCROSSING TO CLAY STREET UNDERCROSSING AND AT HANGTOWN CREEK BRIDGE FED. AID NO. ACST-P050(110)E ,PE-P050(110)E ,BRLS-6203(14) WIDEN HIGHWAY AND BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 9,000.0000 9,000.00 0.038 342.00 0.483 4,347.00 02 TIME-RELATED OVERHEAD WDAY 5,400.0000 2,916,000.00 21.000 113,400.00 262.000 1,414,800.00 03 TEMPORARY FENCE (TYPE CL-1.8) M 47.0000 846.00 0.000 0.00 S) 04 TEMPORARY FENCE (PEDESTRIAN BARRICADE) M 26.0000 5,200.00 205.500 5,343.00 S) 05 TEMPORARY FENCE (TYPE ESA) M 53.0000 53,530.00 0.000 0.00 06 TEMPORARY SUPPORT LS 219,000.0000 219,000.00 0.050 10,950.00 0.920 201,480.00 07 TEMPORARY CONDUIT SUPPORT/PROTECTION LS 10,000.0000 10,000.00 0.000 0.00 SYSTEM 08 TEMPORARY CAP INLET EA 1,200.0000 1,200.00 0.000 0.00 09 PREPARE RISK RESPONSE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 10 PREPARE STORM WATER POLLUTION LS 5,100.0000 5,100.00 1.000 5,100.00 PREVENTION PLAN 11 WATER POLLUTION CONTROL LS 52,000.0000 52,000.00 0.038 1,976.00 0.471 24,492.00 12 DEWATERING LS 228,000.0000 228,000.00 0.500 114,000.00 13 TEMPORARY CREEK DIVERSION SYSTEM LS 200,000.0000 200,000.00 0.200 40,000.00 14 TEMPORARY SILT FENCE M 19.0000 35,150.00 22.000 418.00 2,526.000 47,994.00 15 TEMPORARY GRAVEL BAG BERM M 63.0000 6,300.00 0.000 0.00 16 TEMPORARY CONSTRUCTION ENTRANCE EA 3,800.0000 15,200.00 2.000 7,600.00 17 CONSTRUCTION AREA SIGNS LS 9,000.0000 9,000.00 0.410 3,690.00 S) 18 TRAFFIC CONTROL SYSTEM LS 270,000.0000 270,000.00 0.038 10,260.00 0.476 128,520.00 S) 19 TYPE III BARRICADE EA 91.0000 2,548.00 18.000 1,638.00 S) 20 TEMPORARY PAVEMENT MARKING (PAINT) M2 38.0000 19,000.00 22.920 870.96 S) 21 TEMPORARY TRAFFIC STRIPE (TAPE) M 6.0000 6,000.00 0.000 0.00 S) 22 TEMPORARY PAVEMENT MARKING (TAPE) M2 104.0000 13,520.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 TEMPORARY TRAFFIC STRIPE (PAINT) M 3.2000 91,840.00 1,885.000 6,032.00 12,964.500 41,486.40 S) 24 CHANNELIZER (SURFACE MOUNTED) EA 58.0000 6,960.00 34.000 1,972.00 S) 25 TRAFFIC PLASTIC DRUM EA 157.0000 28,260.00 155.000 24,335.00 S) 26 TEMPORARY PAVEMENT MARKER EA 11.0000 13,970.00 92.000 1,012.00 564.000 6,204.00 S) 27 PORTABLE CHANGEABLE MESSAGE SIGN LS 61,000.0000 61,000.00 0.038 2,318.00 0.481 29,341.00 S) 28 TEMPORARY RAILING (TYPE K) M 65.0000 399,750.00 999.000 64,935.00 3,786.700 246,135.50 S) 29 TEMPORARY CRASH CUSHION MODULE EA 261.0000 60,030.00 14.000 3,654.00 108.000 28,188.00 S) 30 ABANDON CULVERT EA 447.0000 2,235.00 1.000 447.00 31 ABANDON SEWER MANHOLE EA 448.0000 1,792.00 0.000 0.00 S) 32 ABANDON PIPELINE EA 578.0000 1,156.00 0.000 0.00 S) 33 ABANDON SEWER (300 MM OR GREATER) M 237.0000 13,509.00 0.000 0.00 S) 34 ABANDON SEWER (LESS THAN 300 MM) EA 448.0000 10,752.00 0.000 0.00 S) 35 OBLITERATE SURFACING M2 3.6000 7,560.00 0.000 0.00 36 REMOVE FENCE M 15.0000 18,300.00 923.400 13,851.00 S) 37 REMOVE PIPE HANDRAILING M 71.0000 4,118.00 7.400 525.40 S) 38 REMOVE ENTRANCE TAPER EA 98.0000 490.00 2.000 196.00 39 REMOVE METAL BEAM GUARD RAILING M 42.0000 12,180.00 177.500 7,455.00 S) 40 REMOVE METAL BEAM BARRIER M 40.0000 3,000.00 0.000 0.00 S) 41 REMOVE FLARED END SECTION EA 210.0000 840.00 3.000 630.00 S) 42 ABANDON IRRIGATION BOX EA 547.0000 547.00 0.000 0.00 S) 43 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 5.0000 24,950.00 901.000 4,505.00 S) STRIPE 44 REMOVE TRAFFIC STRIPE M 5.0000 59,000.00 4,942.250 24,711.25 S) 45 REMOVE PAVEMENT MARKING M2 52.0000 16,640.00 0.000 0.00 S) 46 REMOVE ROADSIDE SIGN EA 78.0000 5,694.00 15.000 1,170.00 47 REMOVE SIGN STRUCTURE LS 5,200.0000 5,200.00 0.000 0.00 48 REMOVE UNDERDRAIN PIPE M 18.0000 4,140.00 0.000 0.00 49 REMOVE SLOTTED PIPE M 126.0000 10,206.00 10.000 1,260.00 PROGRAM CAS145 PAGE 3 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 REMOVE CULVERT M 112.0000 22,400.00 54.400 6,092.80 51 REMOVE PIPE M 119.0000 3,332.00 7.000 833.00 52 REMOVE INLET EA 524.0000 10,480.00 2.000 1,048.00 6.000 3,144.00 53 REMOVE HEADWALL EA 715.0000 1,430.00 1.000 715.00 54 REMOVE DOWNDRAIN EA 472.0000 1,888.00 3.000 1,416.00 55 REMOVE SEWER MANHOLE EA 1,400.0000 63,000.00 2.000 2,800.00 S) 56 REMOVE RETAINING WALL M2 54.0000 19,440.00 9.240 498.96 20.110 1,085.94 57 REMOVE SEWER PIPE M 91.0000 273,000.00 77.900 7,088.90 S) 58 REMOVE ASPHALT CONCRETE SURFACING M2 18.0000 3,060.00 0.000 0.00 59 REMOVE ASPHALT CONCRETE OVERSIDE DRAIN EA 3,300.0000 3,300.00 1.000 3,300.00 60 RECONSTRUCT CHAIN LINK FENCE M 157.0000 6,123.00 0.000 0.00 S) 61 RECONSTRUCT METAL BEAM GUARD RAILING M 313.0000 90,770.00 0.000 0.00 S) (WOOD POST) 62 REMOVE CONCRETE (PEDESTRIAN RAMP) M3 1,000.0000 16,000.00 2.770 2,770.00 63 RESET PROPANE TANK EA 6,300.0000 37,800.00 0.000 0.00 S) 64 RELOCATE MAILBOX EA 730.0000 5,110.00 0.000 0.00 65 RELOCATE CRASH CUSHION (ADIEM) EA 1,300.0000 7,800.00 0.000 0.00 S) 66 RELOCATE ROADSIDE SIGN EA 183.0000 9,516.00 5.000 915.00 67 RELOCATE HISTORICAL MONUMENTS LS 16,000.0000 16,000.00 0.000 0.00 68 ADJUST INLET EA 1,700.0000 6,800.00 0.000 0.00 69 ADJUST MANHOLE TO GRADE EA 664.0000 1,328.00 0.000 0.00 70 ADJUST SEWER MANHOLE TO GRADE EA 2,000.0000 8,000.00 0.000 0.00 S) 71 MODIFY INLET EA 900.0000 3,600.00 1.000 900.00 72 CEMENTITIOUS PIPE LINING M 1,600.0000 115,200.00 0.000 0.00 73 REMODEL MANHOLE EA 2,400.0000 2,400.00 0.000 0.00 S) 74 REMODEL SEWER MANHOLE EA 11,000.0000 66,000.00 1.000 11,000.00 S) 75 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.4600 28,782.00 9,176.500 22,574.19 S) 76 REMOVE CONCRETE PEDESTAL M3 5,100.0000 11,730.00 0.000 0.00 PROGRAM CAS145 PAGE 4 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 REMOVE CONCRETE (STRUCTURE) M3 128.0000 34,560.00 0.000 0.00 78 REMOVE CONCRETE CURB M 65.0000 313,950.00 809.500 52,617.50 1,941.200 126,178.00 79 REMOVE CONCRETE CURB AND SIDEWALK M 96.0000 21,120.00 10.400 998.40 80 REMOVE CONCRETE BARRIER M 67.0000 85,760.00 919.700 61,619.90 81 PREPARE CONCRETE BRIDGE DECK SURFACE M2 11.0000 37,400.00 0.000 0.00 82 ACCESS OPENING, DECK EA 1,300.0000 7,800.00 0.000 0.00 83 CAP INLET EA 1,000.0000 8,000.00 1.000 1,000.00 84 REMOVE CRASH CUSHION EA 1,100.0000 2,200.00 1.000 1,100.00 85 BRIDGE REMOVAL, LOCATION A LS 160,000.0000 160,000.00 0.330 52,800.00 0.670 107,200.00 86 BRIDGE REMOVAL, LOCATION B LS 30,000.0000 30,000.00 0.900 27,000.00 87 BRIDGE REMOVAL, LOCATION C LS 11,000.0000 11,000.00 0.000 0.00 88 BRIDGE REMOVAL (PORTION), LOCATION A LS 16,000.0000 16,000.00 0.000 0.00 89 BRIDGE REMOVAL (PORTION), LOCATION B LS 15,000.0000 15,000.00 0.000 0.00 90 CLEARING AND GRUBBING LS 90,000.0000 90,000.00 0.750 67,500.00 91 ROADWAY EXCAVATION M3 21.0000 1,001,700.00 1,080.000 22,680.00 20,007.000 420,147.00 92 LEAD COMPLIANCE PLAN LS 4,500.0000 4,500.00 1.000 4,500.00 93 STRUCTURE EXCAVATION (BRIDGE) M3 21.0000 38,850.00 234.000 4,914.00 1,250.000 26,250.00 F) 94 STRUCTURE EXCAVATION (TYPE D) M3 167.0000 218,770.00 420.000 70,140.00 F) 95 STRUCTURE EXCAVATION (RETAINING WALL) M3 79.0000 316,711.00 1,673.000 132,167.00 F) 96 STRUCTURE BACKFILL (BRIDGE) M3 65.0000 117,000.00 523.000 33,995.00 F) 97 STRUCTURE BACKFILL (SLURRY CEMENT) M3 95.0000 2,185.00 0.000 0.00 98 STRUCTURE BACKFILL (RETAINING WALL) M3 60.0000 231,480.00 1,705.000 102,300.00 F) 99 PERVIOUS BACKFILL MATERIAL (RETAINING M3 104.0000 19,760.00 120.000 12,480.00 F) WALL) 00 SAND BACKFILL M3 96.0000 2,016.00 0.000 0.00 01 DITCH EXCAVATION M3 29.0000 3,770.00 130.000 3,770.00 02 IMPORTED BORROW M3 11.0000 113,300.00 12,063.000 132,693.00 03 IMPORTED MATERIAL (SHOULDER BACKING) M3 107.0000 20,330.00 0.000 0.00 PROGRAM CAS145 PAGE 5 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 HIGHWAY PLANTING LS 50,000.0000 50,000.00 0.000 0.00 S) 05 DUFF M2 3.1300 43,820.00 0.000 0.00 06 EROSION CONTROL (BLANKET) M2 6.0000 9,720.00 47.100 282.60 07 STRAW (EROSION CONTROL) TONN 1,500.0000 48,000.00 1.800 2,700.00 S) 08 FIBER (EROSION CONTROL) KG 1.2600 8,064.00 480.000 604.80 S) 09 FIBER ROLLS M 14.0000 50,680.00 593.000 8,302.00 10 ROOT WAD REVETMENT LS 21,000.0000 21,000.00 0.000 0.00 11 BOULDER PLACEMENT LS 17,000.0000 17,000.00 0.000 0.00 12 COMPOST (EROSION CONTROL) M3 420.0000 10,080.00 1.500 630.00 S) 13 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,100.0000 6,600.00 1.000 1,100.00 S) 14 PURE LIVE SEED (EROSION CONTROL) KG 126.0000 55,440.00 28.800 3,628.80 S) 15 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 3.1300 30,048.00 600.000 1,878.00 S) 16 STABILIZING EMULSION (EROSION CONTROL) KG 2.8800 4,608.00 100.000 288.00 S) 17 PLANT (GROUP W) EA 11.0000 23,870.00 0.000 0.00 S) 18 WILLOW BUNDLE EA 157.0000 4,239.00 0.000 0.00 19 IRRIGATION SYSTEM LS 50,000.0000 50,000.00 0.000 0.00 S) 20 WATER METER EA 5,000.0000 10,000.00 0.000 0.00 S) 21 200 MM CORRUGATED HIGH DENSITY M 132.0000 22,440.00 20.000 2,640.00 POLYETHYLENE PIPE CONDUIT 22 150 MM GALVANIZED STEEL PIPE M 297.0000 1,188.00 0.000 0.00 23 CLASS 2 AGGREGATE BASE M3 68.0000 686,800.00 452.000 30,736.00 2,739.000 186,252.00 24 REPLACE ASPHALT CONCRETE SURFACING M3 261.0000 13,572.00 0.000 0.00 25 ASPHALT CONCRETE (TYPE A) TONN 97.0000 2,182,500.00 1,886.500 182,990.50 3,427.290 332,447.13 26 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 689.0000 454,740.00 0.000 0.00 AREA) 27 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 6.0000 156.00 0.000 0.00 28 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 6.0000 366.00 0.000 0.00 29 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 6.0000 7,980.00 0.000 0.00 30 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 6.0000 3,300.00 0.000 0.00 PROGRAM CAS145 PAGE 6 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 31 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 32 FURNISH STEEL PILING (HP 310 X 125) M 90.0000 101,520.00 642.800 57,852.00 33 DRIVE STEEL PILE (HP 310 X 125) EA 1,420.0000 230,040.00 122.000 173,240.00 S) 34 600 MM CAST-IN-DRILLED-HOLE CONCRETE M 1,891.0000 94,550.00 67.990 128,569.09 S) PILING 35 1.2 M CAST-IN-DRILLED-HOLE CONCRETE M 4,500.0000 54,000.00 19.760 88,920.00 S) PILING 36 600 MM CAST-IN-DRILLED-HOLE CONCRETE M 3,400.0000 204,000.00 41.210 140,114.00 S) PILING (ROCK SOCKET) 37 1.2 M CAST-IN-DRILLED-HOLE CONCRETE M 4,300.0000 374,100.00 28.970 124,571.00 S) PILING (ROCK SOCKET) 38 PRESTRESSING CAST-IN-PLACE CONCRETE LS 294,000.0000 294,000.00 0.230 67,620.00 S) 39 PRESTRESSING (TRANSVERSE) LS 50,000.0000 50,000.00 0.230 11,500.00 0.230 11,500.00 S) 40 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 500.0000 255,000.00 267.000 133,500.00 F) 41 STRUCTURAL CONCRETE, BRIDGE M3 1,200.0000 4,356,000.00 295.000 354,000.00 1,015.600 1,218,720.00 F) 42 STRUCTURAL CONCRETE, RETAINING WALL M3 687.0000 939,129.00 668.176 459,036.91 F) 43 STRUCTURAL CONCRETE, BARRIER SLAB M3 2,700.0000 32,400.00 0.000 0.00 F) 44 STRUCTURAL CONCRETE, APPROACH SLAB M3 2,300.0000 184,000.00 12.500 28,750.00 F) (TYPE EQ) 45 CLASS 4 CONCRETE (BACKFILL) M3 132.0000 19,800.00 0.000 0.00 46 MINOR CONCRETE (MINOR STRUCTURE) M3 2,300.0000 213,900.00 22.390 51,497.00 F) 47 ANTI-GRAFFITI COATING M2 55.0000 162,800.00 0.000 0.00 48 DRYSTACK ROCK TEXTURE M2 203.0000 131,950.00 102.000 20,706.00 F) 49 HANDCUT ROCK FACE TEXTURE M2 550.0000 63,250.00 18.760 10,318.00 F) 50 LEDGESTONE TEXTURE M2 377.0000 60,320.00 0.000 0.00 F) 51 DRILL AND BOND DOWEL M 310.0000 12,400.00 0.000 0.00 52 FURNISH PRECAST PRESTRESSED CONCRETE EA 4,500.0000 72,000.00 0.000 0.00 S) DECK UNIT (SLAB-TYPE) 53 ERECT PRECAST PRESTRESSED CONCRETE DECK EA 4,800.0000 76,800.00 0.000 0.00 S) UNIT 54 FURNISH POLYESTER CONCRETE OVERLAY M3 2,700.0000 189,000.00 0.000 0.00 55 PLACE POLYESTER CONCRETE OVERLAY M2 52.0000 183,040.00 0.000 0.00 F) 56 CONCRETE ANCHOR EA 471.0000 942.00 0.000 0.00 57 JOINT SEAL (MR 30 MM) M 314.0000 3,140.00 0.000 0.00 S) PROGRAM CAS145 PAGE 7 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 58 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 59 JOINT SEAL (MR 40 MM) M 209.0000 17,974.00 0.000 0.00 S) 60 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 61 JOINT SEAL (SILICONE ONLY) (MR 50MM) M 1,100.0000 5,500.00 0.000 0.00 S) 62 BAR REINFORCING STEEL KG 3.0000 1,794.00 0.000 0.00 F) 63 BAR REINFORCING STEEL (BRIDGE) KG 2.5000 698,750.00 24,456.000 61,140.00 94,547.000 236,367.50 SF) 64 BAR REINFORCING STEEL (RETAINING WALL) KG 1.5000 143,883.00 41,816.000 62,724.00 SF) 65 BAR REINFORCING STEEL (EPOXY COATED) KG 2.4200 469,480.00 27,265.000 65,981.30 SF)(BRIDGE) 66 HEADED BAR REINFORCEMENT EA 58.0000 56,840.00 0.000 0.00 S) 67 FURNISH SIGN STRUCTURE (TRUSS) KG 11.0000 90,915.00 0.000 0.00 F) 68 INSTALL SIGN STRUCTURE (TRUSS) KG 2.0000 16,530.00 0.000 0.00 SF) 69 1377 MM CAST-IN-DRILLED-HOLE CONCRETE M 6,300.0000 69,300.00 0.000 0.00 S) PILE (SIGN FOUNDATION) 70 ROADSIDE SIGN - ONE POST EA 198.0000 14,058.00 0.000 0.00 71 ROADSIDE SIGN - TWO POST EA 628.0000 6,280.00 0.000 0.00 72 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 131.0000 4,978.00 0.000 0.00 METHOD) 73 INSTALL ROADSIDE SIGN PANEL ON BARRIER EA 157.0000 157.00 0.000 0.00 74 PREPARE AND PAINT CONCRETE M2 79.0000 101,120.00 0.000 0.00 75 450 MM ALTERNATIVE PIPE CULVERT M 226.0000 131,080.00 17.300 3,909.80 150.470 34,006.22 76 600 MM ALTERNATIVE PIPE CULVERT M 291.0000 66,930.00 93.600 27,237.60 77 450 MM REINFORCED CONCRETE PIPE M 693.0000 138,600.00 3.960 2,744.28 44.660 30,949.38 78 600 MM REINFORCED CONCRETE PIPE M 762.0000 1,143.00 0.000 0.00 79 900 MM REINFORCED CONCRETE PIPE M 769.0000 22,301.00 26.300 20,224.70 80 300 MM CORRUGATED STEEL PIPE M 263.0000 8,942.00 0.000 0.00 (2.01 MM THICK) 81 450 MM SLOTTED CORRUGATED STEEL PIPE M 519.0000 306,210.00 0.000 0.00 (4.27 MM THICK) 82 SEWER CLEANOUT EA 846.0000 35,532.00 2.000 1,692.00 2.000 1,692.00 83 FLUSHING BRANCH EA 2,359.0000 18,872.00 0.000 0.00 84 200 MM NON-PERFORATED STEEL PIPE M 280.0000 3,360.00 3.000 840.00 UNDERDRAIN (2.01 MM THICK) PROGRAM CAS145 PAGE 8 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 85 200 MM PERFORATED PLASTIC M 258.0000 30,960.00 0.000 0.00 PIPE UNDERDRAIN 86 450 MM BITUMINOUS COATED CORRUGATED M 229.0000 27,480.00 37.700 8,633.30 STEEL PIPE DOWNDRAIN (2.01 MM THICK) 87 BITUMINOUS COATED FLUME DOWNDRAIN M 30.0000 870.00 0.000 0.00 88 450 MM BITUMINOUS COATED ENTRANCE TAPER EA 453.0000 453.00 0.000 0.00 89 BITUMINOUS COATED TAPERED INLET EA 203.0000 406.00 0.000 0.00 90 FLUME ANCHOR ASSEMBLY EA 184.0000 1,656.00 0.000 0.00 91 450 MM ANCHOR ASSEMBLY EA 201.0000 2,613.00 0.000 0.00 92 DRAINAGE INLET MARKER EA 85.0000 2,550.00 0.000 0.00 93 GRATED LINE DRAIN M 331.0000 17,874.00 0.000 0.00 94 300 MM WELDED STEEL PIPE CASING M 878.0000 166,820.00 0.000 0.00 S) (PIPE SUPPORT) 95 500 MM WELDED STEEL PIPE CASING M 2,200.0000 418,000.00 0.000 0.00 S) (6.35 MM THICK, JACKED) 96 450 MM BITUMINOUS COATED STEEL EA 434.0000 2,604.00 0.000 0.00 FLARED END SECTION 97 450 MM ALTERNATIVE FLARED END SECTION EA 286.0000 2,860.00 0.000 0.00 98 600 MM ALTERNATIVE FLARED END SECTION EA 326.0000 978.00 0.000 0.00 99 1200 MM PRECAST CONCRETE PIPE MANHOLE EA 3,000.0000 9,000.00 0.000 0.00 00 200 MM DUCTILE IRON PIPE WATER MAIN M 225.0000 69,750.00 0.000 0.00 S) 01 150 MM DUCTILE IRON PIPE WATER MAIN M 290.0000 9,280.00 0.000 0.00 S) 02 25 MM WATER SERVICE LINE M 67.0000 8,040.00 0.000 0.00 S) 03 WATER LINE APPURTENANCES LS 32,000.0000 32,000.00 0.000 0.00 S) 04 100 MM DUCTILE IRON PIPE M 369.0000 44,280.00 63.560 23,453.64 63.560 23,453.64 S) 05 150 MM DUCTILE IRON PIPE M 465.0000 218,550.00 21.900 10,183.50 S) 06 200 MM DUCTILE IRON PIPE M 301.0000 180,600.00 202.600 60,982.60 205.300 61,795.30 S) 07 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 08 TELEVISION INSPECTION LS 8,400.0000 8,400.00 0.000 0.00 09 SHALLOW SEWER MANHOLE EA 1,900.0000 5,700.00 0.000 0.00 10 CONCRETE SEWER MANHOLE EA 12,000.0000 372,000.00 21.000 252,000.00 S) PROGRAM CAS145 PAGE 9 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 11 DROP SEWER MANHOLE EA 10,000.0000 260,000.00 8.000 80,000.00 S) 12 ROCK SLOPE PROTECTION (75 MM, METHOD B) M3 115.0000 2,185.00 18.800 2,162.00 13 ROCK SLOPE PROTECTION (2T, METHOD A) M3 104.5300 18,815.40 0.000 0.00 14 ROCK SLOPE PROTECTION (1T, METHOD A) M3 94.0000 22,560.00 0.000 0.00 15 ROCK SLOPE PROTECTION (1/2T, METHOD A) M3 104.0000 18,720.00 0.000 0.00 16 ROCK SLOPE PROTECTION M3 148.0000 26,640.00 37.400 5,535.20 (FACING, METHOD B) 17 ROCK SLOPE PROTECTION M3 125.0000 42,500.00 0.000 0.00 (BACKING NO. 2, METHOD B) 18 ROCK SLOPE PROTECTION (1/4T, METHOD B) M3 125.0000 111,250.00 0.000 0.00 19 SLOPE PAVING (LEDGESTONE PAVER) M2 293.0000 234,400.00 0.000 0.00 F) 20 COBBLESTONE M3 51.0000 510.00 0.000 0.00 21 ROCK SLOPE PROTECTION FABRIC M2 4.0000 9,280.00 135.900 543.60 22 MINOR CONCRETE (CURB) M3 1,000.0000 36,000.00 0.000 0.00 23 MINOR CONCRETE (MISCELLANEOUS M3 576.0000 43,200.00 0.000 0.00 CONSTRUCTION) 24 MINOR CONCRETE (CURB, GUTTER & SIDEWALK) M3 526.0000 131,500.00 31.660 16,653.16 25 MINOR CONCRETE (CURB AND GUTTER) M3 776.0000 147,440.00 0.000 0.00 26 MINOR CONCRETE (CURB AND SIDEWALK) M3 892.0000 29,436.00 0.000 0.00 27 MINOR CONCRETE (CURB, SIDEWALK & M3 1,300.0000 2,600.00 0.000 0.00 DRIVEWAY) 28 MINOR CONCRETE (CURB, GUTTER, SIDEWALK M3 1,200.0000 15,600.00 0.000 0.00 AND DRIVEWAY) 29 MINOR CONCRETE (CURB, GUTTER & DRIVEWAY) M3 775.0000 5,425.00 0.000 0.00 30 MINOR CONCRETE (GUTTER) M 212.0000 23,956.00 0.000 0.00 F) 31 MINOR CONCRETE (SIDEWALK) M3 757.0000 22,710.00 0.000 0.00 F) 32 MINOR CONCRETE (TEXTURED PAVING) M3 599.0000 149,750.00 0.000 0.00 33 MINOR CONCRETE (CURB RAMP) M3 1,300.0000 20,800.00 0.000 0.00 34 MISCELLANEOUS IRON AND STEEL KG 4.0000 39,520.00 454.000 1,816.00 SF) 35 MISCELLANEOUS IRON AND STEEL KG 4.0000 88,884.00 3,560.000 14,240.00 SF)(SEWER SYSTEM) 36 PIPE SUPPORT (CREEK CROSSING) EA 27,000.0000 27,000.00 0.000 0.00 37 MANHOLE FRAME AND COVER EA 151.0000 453.00 0.000 0.00 PROGRAM CAS145 PAGE 10 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 38 MISCELLANEOUS METAL (BRIDGE) KG 53.0000 33,390.00 0.000 0.00 SF) 39 ISOLATION CASING KG 20.0000 36,000.00 1,500.000 30,000.00 SF) 40 CHAIN LINK FENCE (TYPE CL-1.2, M 105.0000 2,835.00 0.000 0.00 S) VINYL-CLAD) 41 CHAIN LINK FENCE (TYPE CL-1.8) M 42.0000 15,540.00 0.000 0.00 S) 42 CHAIN LINK FENCE (TYPE CL-1.8, M 62.0000 11,780.00 0.000 0.00 S) VINYL-CLAD) 43 DELINEATOR (CLASS 2) EA 40.0000 2,760.00 0.000 0.00 44 HIGHWAY POST MARKER EA 42.0000 168.00 0.000 0.00 45 OBJECT MARKER (TYPE L-1) EA 42.0000 168.00 0.000 0.00 46 METAL BEAM GUARD RAILING (WOOD POST) M 84.0000 90,720.00 0.000 0.00 S) 47 IRON FENCE M 525.0000 73,500.00 0.000 0.00 S) 48 IRON FENCE WITH HANDRAILING (TYPE B) M 524.0000 16,768.00 0.000 0.00 49 IRON FENCE WITH HANDRAILING M 513.0000 235,980.00 0.000 0.00 SF) 50 BARRIER MOUNTED IRON RAILING M 525.0000 37,275.00 0.000 0.00 SF) 51 BARRIER MOUNTED IRON RAILING (TYPE B) M 525.0000 267,750.00 0.000 0.00 S) 52 PIPE HANDRAILING M 524.0000 15,720.00 0.000 0.00 SF) 53 PIPE HANDRAILING (WALL TYPE) M 523.0000 2,092.00 0.000 0.00 S) 54 TUBULAR HANDRAILING M 210.0000 50,610.00 0.000 0.00 SF) 55 TUBULAR BICYCLE RAILING M 315.0000 47,250.00 0.000 0.00 F) 56 CONCRETE BARRIER (TYPE 26 MODIFIED) M 365.0000 73,730.00 0.000 0.00 F) 57 CONCRETE BARRIER (TYPE 26B) M 908.0000 35,412.00 0.000 0.00 58 CABLE RAILING M 51.0000 13,158.00 0.000 0.00 SF) 59 TRANSITION RAILING (TYPE WB) EA 1,100.0000 4,400.00 0.000 0.00 S) 60 END CAP EA 523.0000 1,046.00 0.000 0.00 S) 61 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,600.0000 6,400.00 0.000 0.00 S) 62 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 1,100.0000 5,500.00 0.000 0.00 S) 63 ALTERNATIVE FLARED TERMINAL SYSTEM EA 1,100.0000 3,300.00 0.000 0.00 S) 64 CRASH CUSHION (ADIEM) EA 21,000.0000 168,000.00 3.000 63,000.00 S) PROGRAM CAS145 PAGE 11 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 65 CRASH CUSHION (REACT 9SCBS) EA 52,000.0000 52,000.00 0.000 0.00 S) 66 CRASH CUSHION (WIDETRACC) EA 62,000.0000 62,000.00 0.000 0.00 S) 67 PORTABLE CONCRETE BARRIER (TYPE 60K) M 209.0000 81,510.00 0.000 0.00 68 CONCRETE BARRIER (TYPE 60A) M 217.0000 13,671.00 0.000 0.00 F) 69 CONCRETE BARRIER (TYPE 60C) M 270.0000 286,200.00 0.000 0.00 70 CONCRETE BARRIER (TYPE 60E) M 500.0000 6,500.00 0.000 0.00 71 CONCRETE BARRIER (TYPE 60SC) M 189.0000 32,130.00 0.000 0.00 72 CONCRETE BARRIER (TYPE 60SE MODIFIED) M 541.0000 15,148.00 0.000 0.00 73 CONCRETE BARRIER (TYPE 732 MODIFIED) M 334.0000 97,528.00 0.000 0.00 F) 74 CONCRETE BARRIER (TYPE 732B MOD) M 413.0000 214,760.00 0.000 0.00 75 CONCRETE BARRIER (TYPE 732A) M 600.0000 17,400.00 0.000 0.00 F) 76 CONCRETE BARRIER (TYPE 732B) M 580.0000 15,080.00 0.000 0.00 77 CONCRETE BARRIER (TYPE 80 MODIFIED) M 2,278.0000 34,170.00 0.000 0.00 F) 78 CONCRETE BARRIER (TYPE 80SW MODIFIED) M 2,370.0000 106,650.00 0.000 0.00 F) 79 CONCRETE BARRIER (TYPE 80R MODIFIED) M 2,500.0000 22,500.00 0.000 0.00 F) 80 THERMOPLASTIC PAVEMENT MARKING M2 42.0000 21,420.00 0.000 0.00 S) 81 THERMOPLASTIC TRAFFIC STRIPE M 1.0500 11,970.00 0.000 0.00 S) (SPRAYABLE) 82 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 7,960.00 0.000 0.00 S) 83 200 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 3,720.00 0.000 0.00 S) 84 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 180.00 0.000 0.00 S) (BROKEN 1.83 M - 0.30 M) 85 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 5,650.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 86 PAINT PAVEMENT MARKING (2-COAT) M2 22.0000 1,320.00 0.000 0.00 S) 87 PARKING BUMPER (PRECAST CONCRETE) EA 105.0000 6,300.00 0.000 0.00 88 PAVEMENT MARKER EA 12.0000 15,360.00 0.000 0.00 S) (RETROREFLECTIVE-RECESSED) 89 SIGNAL AND LIGHTING (STAGE CONSTRUCTION) LS 337,000.0000 337,000.00 0.150 50,550.00 0.650 219,050.00 S) 90 LIGHTING (CITY STREET) LS 128,000.0000 128,000.00 0.020 2,560.00 S) 91 LIGHTING (CITY STREET) LS 429,000.0000 429,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 12 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 92 HIGHWAY LIGHTING LS 131,000.0000 131,000.00 0.010 1,310.00 S) 93 LIGHTING (STAGE CONSTRUCTION) LS 30,000.0000 30,000.00 0.000 0.00 S) 94 SIGN ILLUMINATION LS 29,000.0000 29,000.00 0.000 0.00 S) 95 CLOSED CIRCUIT TELEVISION SYSTEM LS 19,000.0000 19,000.00 0.000 0.00 S) 96 MODIFY SIGNAL AND LIGHTING (LOCATION 1) LS 183,000.0000 183,000.00 0.000 0.00 S) 97 MODIFY SIGNAL AND LIGHTING (LOCATION 2) LS 229,000.0000 229,000.00 0.000 0.00 S) 98 MODIFY SIGNAL AND LIGHTING (LOCATION 3) LS 222,000.0000 222,000.00 0.000 0.00 S) 99 150 MM PVC CONDUIT (PG&E) M 1,117.0000 51,382.00 0.000 0.00 00 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 01 REMOVE CONCRETE PAVEMENT M3 546.0000 1,365.00 0.000 0.00 02 JOINT SEAL ASSEMBLY (MR 100 MM) M 320.0000 800.00 0.000 0.00 S) 03 POLYVINYL CHLORIDE SEWER PIPE M 651.0000 839,790.00 1,205.975 785,089.73 S) PROGRAM CAS145 PAGE 13 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3555U4 TIME 02:12 PM ESTIMATE NO. 16 BID OPENING 02/08/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: RESTAINO, MIC DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,133,554.28 9,146,676.10 ADJUSTMENT OF COMPENSATION 0.00 267,263.00 EXTRA WORK 0.00 306,904.99 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,133,554.28 9,720,844.09 04 MOBILIZATION LS 3500,000.0000 3,500,000.00 0.950 3,325,000.00 ORIGINAL CONTRACT AMOUNT 34,985,559.40 TOTAL WORK COMPLETED 1,133,554.28 13,045,844.09 MATERIALS ON HAND ON SITE 315,466.89 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -55,042.85 TOTAL 1,133,554.28 13,306,268.13 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 304 MOBILIZATION 3,498,555.94 3,500,000.00 1,444.06 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/03/06 540 05/26/06 06/12/06 09/03/08 261 17 0 0 37% 48% PROGRESS IS SATISFACTORY RESTAINO, MIC RESIDENT ENGINEER PROGRAM CAS145 DATE 07/25/07