PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/24/03 EST. NO.04 TIME 11:07 AM R.E. NAME: ACEVES, SERGIO 03-391804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/24/03 EST. NO.04 TIME 11:07 AM R.E. NAME: ACEVES, SERGIO 03-391804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING PAYROLLS -5,000.00 02 MISSING PAYROLLS -5,000.00 04 -5,000.00 -10,000.00 TOTAL DEDUCTIONS -5,000.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 09/24/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-391804 TIME 11:07 AM ESTIMATE NO. 04 BID OPENING 01/07/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/19/03 R.E. NAME: ACEVES, SERGIO DATE OF THIS ESTIMATE 09/24/03 LOCATION PROGRESS ESTIMATE 03-BUT-99-13.2/20.6 ----------------- GRANITE CONSTRUCTION COMPANY IN BUTTE COUNTY ABOUT 13 KM SOUTH P O BOX 50085 OF CHICO FROM JUNCTION DRAW BRIDGE WATSONVILLE CA 950775085 TO 0.1 KM SOUTH OF DRY CREEK BRIDGE FED. AID NO. ACSP-P099(452)E ,P-P099(452)E REHABILITATE EXISTING HIGHWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 3,200.0000 3,200.00 0.750 2,400.00 PROGRAM 02 WATER POLLUTION CONTROL LS 6,000.0000 6,000.00 0.080 480.00 0.876 5,256.00 03 CONSTRUCTION AREA SIGNS LS 3,600.0000 3,600.00 0.030 108.00 0.870 3,132.00 S) 04 TRAFFIC CONTROL SYSTEM LS 210,000.0000 210,000.00 0.150 31,500.00 0.830 174,300.00 S) 05 PORTABLE CHANGEABLE MESSAGE SIGN LS 22,700.0000 22,700.00 0.150 3,405.00 0.830 18,841.00 S) 06 REMOVE ASPHALT CONCRETE DIKE M 6.0000 8,100.00 1,275.000 7,650.00 07 REMOVE ASPHALT CONCRETE SURFACING M2 25.8000 28,638.00 1,110.000 28,638.00 08 RECONSTRUCT METAL BEAM GUARD RAILING M 36.0000 20,160.00 128.000 4,608.00 128.000 4,608.00 S) (WOOD POST) 09 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 0.9300 90,489.00 101,485.000 94,381.05 S) 10 PREPARE CONCRETE BRIDGE DECK SURFACE M2 13.0000 14,430.00 1,106.000 14,378.00 11 IMPORTED MATERIAL (SHOULDER BACKING) TONN 27.0000 82,350.00 129.630 3,500.01 2,321.920 62,691.84 12 REPLACE ASPHALT CONCRETE SURFACING M3 110.0000 459,800.00 4,024.370 442,680.70 13 ASPHALT CONCRETE (TYPE A) TONN 52.0000 1,180,400.00 1.570 81.64 19,317.110 1,004,489.72 14 ASPHALT CONCRETE (OPEN GRADED) TONN 56.0000 245,280.00 0.000 0.00 15 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 74.0000 2,516.00 41.000 3,034.00 41.000 3,034.00 16 FURNISH POLYESTER CONCRETE OVERLAY M3 2,400.0000 67,200.00 4.000 9,600.00 24.000 57,600.00 17 PLACE POLYESTER CONCRETE OVERLAY M2 50.0000 55,300.00 1,106.000 55,300.00 F) 18 DELINEATOR (CLASS 1) EA 30.0000 750.00 0.000 0.00 19 HIGHWAY POST MARKER EA 35.0000 525.00 0.000 0.00 20 OBJECT MARKER (TYPE L-1) EA 35.0000 490.00 0.000 0.00 21 METAL BEAM GUARD RAILING (WOOD POST) M 59.0000 3,186.00 0.000 0.00 S) 22 TERMINAL SECTION (TYPE C) EA 100.0000 600.00 14.000 1,400.00 18.000 1,800.00 S) PROGRAM CAS145 PAGE 2 DATE 09/24/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-391804 TIME 11:07 AM ESTIMATE NO. 04 BID OPENING 01/07/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/19/03 R.E. NAME: ACEVES, SERGIO DATE OF THIS ESTIMATE 09/24/03 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 TERMINAL SYSTEM (TYPE ET) EA 2,600.0000 10,400.00 2.000 5,200.00 4.000 10,400.00 S) 24 TERMINAL SYSTEM (TYPE SRT) EA 2,000.0000 48,000.00 23.000 46,000.00 25.000 50,000.00 S) 25 TERMINAL ANCHOR ASSEMBLY (TYPE CA) EA 900.0000 5,400.00 6.000 5,400.00 6.000 5,400.00 S) 26 THERMOPLASTIC PAVEMENT MARKING M2 20.0000 880.00 0.000 0.00 S) 27 THERMOPLASTIC TRAFFIC STRIPE M 0.4000 9,360.00 0.000 0.00 S) (SPRAYABLE) 28 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.5000 790.00 0.000 0.00 S) 29 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.3000 3,480.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 30 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 3,060.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 09/24/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-391804 TIME 11:07 AM ESTIMATE NO. 04 BID OPENING 01/07/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/19/03 R.E. NAME: ACEVES, SERGIO DATE OF THIS ESTIMATE 09/24/03 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 114,316.65 2,046,980.31 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 47,971.16 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 114,316.65 2,094,951.47 31 MOBILIZATION LS 138,000.0000 138,000.00 1.000 138,000.00 ORIGINAL CONTRACT AMOUNT 2,725,084.00 TOTAL WORK COMPLETED 114,316.65 2,232,951.47 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -5,000.00 -10,000.00 TOTAL 109,316.65 2,222,951.47 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/27/03 80 06/02/03 02/11/03 10/09/03 68 84 2 0 75% 83% PROGRESS IS SATISFACTORY ACEVES, SERGIO RESIDENT ENGINEER PROGRAM CAS145 DATE 09/24/03