PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/21/07 EST. NO.02 TIME 12:25 PM R.E. NAME: PETERSON, DALE 03-3C5104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 256.07 E.W. @ F.A.(+) 041607 N 0001 0 0002 683.45 041707 N 0002 0 0003 398.32 041807 N 0003 0 0004 550.32 041907 N 0004 0 0005 256.07 042307 N 0005 0 0006 569.34 042407 N 0006 0 2,713.57 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 2,713.57 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/21/07 EST. NO.02 TIME 12:25 PM R.E. NAME: PETERSON, DALE 03-3C5104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION PER LTR DATED 5/07 -2,000.00 02 -2,000.00 -2,000.00 TOTAL DEDUCTIONS -2,000.00 -2,000.00 PROGRAM CAS145 PAGE 1 DATE 05/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3C5104 TIME 12:25 PM ESTIMATE NO. 02 BID OPENING 11/01/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/07 R.E. NAME: PETERSON, DALE DATE OF THIS ESTIMATE 05/21/07 LOCATION PROGRESS ESTIMATE 03-NEV-174-6.3/9.1 ----------------- JURIN CONSTRUCTION INC IN NEVADA COUNTY NEAR GRASS VALLEY P O BOX 1434 AT 1.5 KM SOUTH OF 20 AND 174 WILLOW CREEK CA 95573 SEPARATION FED. AID NO. N O N E REPLACE CULVERT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 3,000.0000 3,000.00 0.167 501.00 1.000 3,000.00 PROGRAM 02 WATER POLLUTION CONTROL LS 4,500.0000 4,500.00 0.111 499.50 1.000 4,500.00 03 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.170 850.00 1.000 5,000.00 S) 04 TRAFFIC CONTROL SYSTEM LS 45,000.0000 45,000.00 0.200 9,000.00 1.000 45,000.00 S) 05 PORTABLE CHANGEABLE MESSAGE SIGN EA 3,600.0000 7,200.00 0.400 1,440.00 2.000 7,200.00 S) 06 REMOVE METAL BEAM GUARD RAILING M 100.0000 600.00 6.000 600.00 07 REMOVE CULVERT M 100.0000 3,900.00 15.000 1,500.00 54.200 5,420.00 08 400 MM PLASTIC PIPELINER (SDR 32.5) M 750.0000 14,250.00 0.000 0.00 09 CLEANING PREPARATION OF EXISTING PIPE M 842.0000 15,998.00 0.000 0.00 AND PRELIMINARY INSPECTION 10 CLASS 4 CONCRETE (BACKFILL) M3 275.0000 4,125.00 3.000 825.00 15.000 4,125.00 11 MINOR CONCRETE (MINOR STRUCTURE) KG 1,400.0000 4,760.00 1.500 2,100.00 1.500 2,100.00 F) 12 900 MM PLASTIC PIPE HDPE (TYPE S) M 600.0000 12,600.00 21.000 12,600.00 13 700 MM X 500 MM CORRUGATED STEEL PIPE M 540.0000 9,720.00 18.300 9,882.00 ARCH (2.77 MM THICK) 14 900 MM CORRUGATED STEEL PIPE INLET EA 4,500.0000 4,500.00 1.000 4,500.00 1.000 4,500.00 (4.27 MM THICK) 15 900 MM STEEL FLARED END SECTION EA 1,200.0000 1,200.00 1.000 1,200.00 1.000 1,200.00 16 MISCELLANEOUS IRON AND STEEL KG 20.0000 4,120.00 98.000 1,960.00 98.000 1,960.00 SF) 17 MARKER (CULVERT) EA 150.0000 600.00 4.000 600.00 4.000 600.00 PROGRAM CAS145 PAGE 2 DATE 05/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3C5104 TIME 12:25 PM ESTIMATE NO. 02 BID OPENING 11/01/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/07 R.E. NAME: PETERSON, DALE DATE OF THIS ESTIMATE 05/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 24,975.50 107,687.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 2,713.57 2,713.57 SUBTOTAL AMOUNT EARNED 27,689.07 110,400.57 ORIGINAL CONTRACT AMOUNT 141,073.00 TOTAL WORK COMPLETED 27,689.07 110,400.57 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -2,000.00 -2,000.00 TOTAL 25,689.07 108,400.57 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/11/06 45 04/16/07 12/26/06 06/15/07 23 77 0 0 98% 51% PROGRESS IS SATISFACTORY PETERSON, DALE RESIDENT ENGINEER PROGRAM CAS145 DATE 05/21/07