PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/08/11 EST. NO.06 TIME 04:57 PM R.E. NAME: MILLER, BRANDON 03-3C7604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/08/11 EST. NO.06 TIME 04:57 PM R.E. NAME: MILLER, BRANDON 03-3C7604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- EQUAL EMPLOYMENT OPPORTUNITY MISSING CEM2402F -10,000.00 04 RECEIVED CEM2402F 10,000.00 05 0.00 0.00 LABOR COMPLIANCE VIOLATION PER LTR DATED 7/2011 -4,000.00 03 CERTIFIED PAYROLLS -8,000.00 04 CERTIFIED PAYROLLS 12,000.00 06 12,000.00 0.00 TOTAL DEDUCTIONS 12,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 11/08/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3C7604 TIME 04:57 PM ESTIMATE NO. 06 BID OPENING 09/21/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/22/11 R.E. NAME: MILLER, BRANDON DATE OF THIS ESTIMATE 11/08/11 LOCATION FINAL ESTIMATE 03-ED-50-32.0/40.0 -------------- LORANG BROTHERS CONSTRUCTION IN EL DORADO COUNTY AT VARIOUS INC LOCATIONS 1175 S AUBURN STREET COLFAX CA 95713 FED. AID NO. NH-P050(123)E INSTALL PIPELINERS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 250.00 0.000 0.00 002 TEMPORARY FENCE (TYPE ESA) LF 3.2000 2,080.00 795.000 2,544.00 003 CONSTRUCTION SITE MANAGEMENT LS 8,000.0000 8,000.00 1.000 8,000.00 004 PREPARE WATER POLLUTION CONTROL LS 3,638.0000 3,638.00 1.000 3,638.00 PROGRAM 005 MOVE-IN/MOVE-OUT EA 1,605.0000 1,605.00 1.000 1,605.00 (TEMPORARY EROSION CONTROL) 006 TEMPORARY DRAINAGE INLET PROTECTION EA 214.0000 2,140.00 10.000 2,140.00 007 TEMPORARY HYDRAULIC MULCH SQYD 5.3500 2,354.00 440.000 2,354.00 (BONDED FIBER MATRIX) 008 STREET SWEEPING LS 2,800.0000 2,800.00 1.000 2,800.00 009 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 2,464.0000 2,464.00 1.000 2,464.00 010 CONSTRUCTION AREA SIGNS LS 4,815.0000 4,815.00 1.000 4,815.00 011 TRAFFIC CONTROL SYSTEM LS 43,949.0000 43,949.00 1.000 43,949.00 012 PORTABLE CHANGEABLE MESSAGE SIGN LS 8,064.0000 8,064.00 1.000 8,064.00 013 TEMPORARY WETLAND PROTECTION MAT (LS) LS 13,207.0000 13,207.00 1.000 13,207.00 014 ABANDON CULVERT LF 62.0000 32,240.00 518.100 32,122.20 015 REMOVE FLARED END SECTION EA 504.0000 504.00 1.000 504.00 016 REMOVE CULVERT LF 22.0000 16,720.00 751.000 16,522.00 017 REMOVE INLET EA 504.0000 6,552.00 13.000 6,552.00 018 REMOVE HEADWALL EA 840.0000 2,520.00 3.000 2,520.00 019 REMOVE DOWNDRAIN LF 19.0000 12,540.00 654.200 12,429.80 020 RECONSTRUCT METAL BEAM GUARD RAILING LF 112.0000 10,528.00 93.750 10,500.00 021 24" ALTERNATIVE PIPELINER LF 173.3000 249,552.00 13.500 2,339.55 1,445.000 250,418.50 022 18" CURED-IN-PLACE PIPELINER LF 527.5000 63,300.00 1.000 527.50 119.000 62,772.50 PROGRAM CAS145 PAGE 2 DATE 11/08/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3C7604 TIME 04:57 PM ESTIMATE NO. 06 BID OPENING 09/21/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/22/11 R.E. NAME: MILLER, BRANDON DATE OF THIS ESTIMATE 11/08/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 24" CURED-IN-PLACE PIPELINER LF 175.0000 281,750.00 61.000 10,675.00 1,657.100 289,992.50 024 CLEARING AND GRUBBING LS 76,787.0000 76,787.00 1.000 76,787.00 025 LEAD COMPLIANCE PLAN LS 1,284.0000 1,284.00 1.000 1,284.00 026 ROCK EXCAVATION (CONTROLLED BLASTING) CY 1,580.0000 12,640.00 8.000 12,640.00 027 IMPORTED BORROW CY 100.0000 1,300.00 12.900 1,290.00 028 EROSION CONTROL (TYPE D) SQYD 1.2000 7,428.00 6,190.000 7,428.00 029 MINOR HOT MIX ASPHALT TON 181.0000 12,308.00 82.620 14,954.22 030 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 160.5000 3,852.00 24.000 3,852.00 031 MINOR CONCRETE (MINOR STRUCTURE) CY 1,188.0000 33,264.00 27.180 32,289.84 (F) 032 24" ALTERNATIVE PIPE CULVERT LF 352.0000 355,520.00 1,004.900 353,724.80 033 24" CORRUGATED STEEL PIPE (.138" THICK) LF 151.0000 7,399.00 46.700 7,051.70 034 PERMEABLE MATERIAL CY 500.0000 800.00 1.600 800.00 035 24" CORRUGATED STEEL PIPE DOWNDRAIN LF 116.5000 82,715.00 709.600 82,668.40 (.138" THICK) 036 24" ANCHOR ASSEMBLY EA 528.0000 15,312.00 29.000 15,312.00 037 CABLE ANCHORAGE SYSTEM LF 160.0000 33,600.00 205.000 32,800.00 038 36" CORRUGATED STEEL PIPE INLET LF 806.0000 20,150.00 24.500 19,747.00 (.138" THICK) 039 24" STEEL FLARED END SECTION EA 560.0000 1,680.00 3.000 1,680.00 040 ROCK SLOPE PROTECTION (FACING, METHOD A) CY 111.6000 22,320.00 207.200 23,123.52 041 ROCK SLOPE PROTECTION FABRIC SQYD 2.2500 1,350.00 614.600 1,382.85 042 MISCELLANEOUS IRON AND STEEL LB 2.0000 14,066.00 1,740.000 3,480.00 7,033.000 14,066.00 (F) PROGRAM CAS145 PAGE 3 DATE 11/08/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3C7604 TIME 04:57 PM ESTIMATE NO. 06 BID OPENING 09/21/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/22/11 R.E. NAME: MILLER, BRANDON DATE OF THIS ESTIMATE 11/08/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 17,022.05 1,482,794.83 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 13,734.39 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 17,022.05 1,496,529.22 043 MOBILIZATION LS 68,000.0000 68,000.00 1.000 68,000.00 ORIGINAL CONTRACT AMOUNT 1,543,347.00 TOTAL WORK COMPLETED 17,022.05 1,564,529.22 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 12,000.00 0.00 TOTAL 29,022.05 1,564,529.22 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/10/11 60 05/06/11 02/25/11 07/22/11 46 57 0 0 100% 100% MILLER, BRANDON RESIDENT ENGINEER PROGRAM CAS145 DATE 11/08/11