PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/25/08 EST. NO.01 TIME 03:11 PM R.E. NAME: NOVOTA, RYAN 03-3E0004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/25/08 EST. NO.01 TIME 03:11 PM R.E. NAME: NOVOTA, RYAN 03-3E0004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/25/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3E0004 TIME 03:11 PM ESTIMATE NO. 01 BID OPENING 06/11/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: NOVOTA, RYAN DATE OF THIS ESTIMATE 08/25/08 LOCATION PROGRESS ESTIMATE 03-ED-50-60.2/60.5 ----------------- TEICHERT CONSTRUCTION IN EL DORADO COUNTY FROM 0.4 MILE P O BOX 15144 WEST OF TWIN BRIDGES ROAD TO 0.1 SACRAMENTO CA 95851 MILE EAST OF TWIN BRIDGES ROAD FED. AID NO. N O N E RECONSTRUCT CURVE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH) LS 1,000.0000 1,000.00 0.000 0.00 02 CONSTRUCTION SITE MANAGEMENT LS 450.0000 450.00 0.130 58.50 0.130 58.50 03 PREPARE WATER POLLUTION CONTROL LS 700.0000 700.00 0.750 525.00 0.750 525.00 S) PROGRAM 04 TEMPORARY FIBER ROLL LF 10.5000 1,260.00 0.000 0.00 05 TEMPORARY CONSTRUCTION ENTRANCE EA 2,700.0000 2,700.00 0.700 1,890.00 0.700 1,890.00 06 STREET SWEEPING LS 6,500.0000 6,500.00 0.130 845.00 0.130 845.00 07 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,500.0000 1,500.00 0.500 750.00 0.500 750.00 08 CONSTRUCTION AREA SIGNS LS 1,450.0000 1,450.00 0.700 1,015.00 0.700 1,015.00 S) 09 TRAFFIC CONTROL SYSTEM LS 38,000.0000 38,000.00 0.130 4,940.00 0.130 4,940.00 S) 10 PORTABLE CHANGEABLE MESSAGE SIGN LS 9,000.0000 9,000.00 0.130 1,170.00 0.130 1,170.00 S) 11 ABANDON CULVERT LF 31.0000 2,170.00 70.000 2,170.00 70.000 2,170.00 12 REMOVE METAL BEAM GUARD RAILING LF 6.0000 9,480.00 250.000 1,500.00 250.000 1,500.00 13 REMOVE ROADSIDE SIGN EA 80.0000 160.00 0.000 0.00 14 REMOVE ASPHALT CONCRETE DIKE LF 5.0000 1,050.00 0.000 0.00 15 REMOVE CULVERT LF 33.0000 2,178.00 60.000 1,980.00 60.000 1,980.00 16 REMOVE INLET EA 800.0000 2,400.00 3.000 2,400.00 3.000 2,400.00 17 RESET ROADSIDE SIGN EA 150.0000 2,400.00 0.000 0.00 18 16" CURED-IN-PLACE PIPE (CIPP) LF 320.0000 54,400.00 0.000 0.00 LINER 19 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 8.0000 4,320.00 0.000 0.00 S) 20 CLEARING AND GRUBBING LS 5,200.0000 5,200.00 0.250 1,300.00 0.250 1,300.00 21 ROADWAY EXCAVATION CY 30.0000 9,900.00 0.000 0.00 22 SAND BACKFILL CY 200.0000 1,000.00 5.000 1,000.00 5.000 1,000.00 PROGRAM CAS145 PAGE 2 DATE 08/25/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3E0004 TIME 03:11 PM ESTIMATE NO. 01 BID OPENING 06/11/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: NOVOTA, RYAN DATE OF THIS ESTIMATE 08/25/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 IMPORTED BORROW CY 40.0000 10,000.00 0.000 0.00 24 CLASS 2 AGGREGATE BASE CY 85.0000 25,500.00 0.000 0.00 25 REPLACE ASPHALT CONCRETE SURFACING CY 320.0000 38,400.00 0.000 0.00 26 HOT MIX ASPHALT (TYPE A) TON 125.0000 551,250.00 0.000 0.00 27 PAVING ASPHALT (BINDER, GEOSYNTHETIC TON 1,800.0000 720.00 0.000 0.00 PAVEMENT INTERLAYER) 28 GEOSYNTHETIC PAVEMENT INTERLAYER SQYD 2.0000 720.00 0.000 0.00 29 CENTERLINE RUMBLE STRIP LF 2.1000 5,187.00 0.000 0.00 (HMA, GROUND-IN INDENTATIONS) 30 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 20.0000 4,200.00 0.000 0.00 31 PLACE HOT MIX ASPHALT SQYD 8.5000 5,950.00 0.000 0.00 (MISCELLANEOUS AREA) 32 CLASS 4 CONCRETE (BACKFILL) CY 120.0000 4,800.00 25.000 3,000.00 25.000 3,000.00 33 MINOR CONCRETE (MINOR STRUCTURE) CY 2,500.0000 9,500.00 2.900 7,250.00 2.900 7,250.00 F) 34 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 4.0000 20.80 0.000 0.00 S) (0.063"-UNFRAMED) 35 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 29.0000 348.00 0.000 0.00 S) (0.080"-UNFRAMED) 36 ROADSIDE SIGN - ONE POST EA 200.0000 400.00 0.000 0.00 37 18" ALTERNATIVE PIPE CULVERT LF 180.0000 14,580.00 40.000 7,200.00 40.000 7,200.00 38 18" CORRUGATED STEEL PIPE (.109" THICK) LF 220.0000 7,260.00 20.000 4,400.00 20.000 4,400.00 39 ROCK SLOPE PROTECTION (LIGHT, METHOD B) CY 145.0000 9,425.00 0.000 0.00 40 ROCK SLOPE PROTECTION CY 250.0000 750.00 0.000 0.00 (BACKING NO. 2, METHOD B) 41 MISCELLANEOUS IRON AND STEEL LB 6.0000 4,320.00 478.000 2,868.00 478.000 2,868.00 42 DELINEATOR (CLASS 2) EA 40.0000 1,040.00 0.000 0.00 43 MARKER (CULVERT) EA 20.0000 160.00 0.000 0.00 44 METAL BEAM GUARD RAILING LF 46.0000 9,660.00 0.000 0.00 S) (7' STEEL POST) 45 SINGLE THRIE BEAM BARRIER LF 50.0000 66,500.00 0.000 0.00 S) (7' STEEL POST) 46 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,000.0000 1,000.00 0.000 0.00 S) 47 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,400.0000 2,400.00 0.000 0.00 S) 48 4" TWO-COMPONENT PAINT TRAFFIC STRIPE LF 1.9000 17,594.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 08/25/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3E0004 TIME 03:11 PM ESTIMATE NO. 01 BID OPENING 06/11/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: NOVOTA, RYAN DATE OF THIS ESTIMATE 08/25/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 46,261.50 46,261.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 46,261.50 46,261.50 ORIGINAL CONTRACT AMOUNT 948,902.80 TOTAL WORK COMPLETED 46,261.50 46,261.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 46,261.50 46,261.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/29/08 45 00/00/00 08/13/08 10/17/08 6 0 0 0 5% 13% PROGRESS IS SATISFACTORY NOVOTA, RYAN RESIDENT ENGINEER PROGRAM CAS145 DATE 08/25/08