PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/21/09 EST. NO.01 TIME 05:08 PM R.E. NAME: GHASSEMI, MOHSSEN 03-3E8704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/21/09 EST. NO.01 TIME 05:08 PM R.E. NAME: GHASSEMI, MOHSSEN 03-3E8704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/21/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3E8704 TIME 05:08 PM ESTIMATE NO. 01 BID OPENING 03/11/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/09 R.E. NAME: GHASSEMI, MOHSSEN DATE OF THIS ESTIMATE 07/21/09 LOCATION RERUN PROGRESS ESTIMATE 03-YOL-50-2.4/3.0 ----------------------- C C MYERS INC IN YOLO COUNTY IN WEST SACRAMENTO P O BOX 2948 AT SACRAMENTO RIVERVIADUCT RANCHO CORDOVA CA 957412948 FED. AID NO. N O N E IMPROVE BRIDGE DRAINAGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.500 250.00 0.500 250.00 02 PREPARE WATER POLLUTION CONTROL LS 500.0000 500.00 1.000 500.00 1.000 500.00 PROGRAM 03 TRAFFIC CONTROL SYSTEM LS 5,000.0000 5,000.00 0.750 3,750.00 0.750 3,750.00 04 PORTABLE CHANGEABLE MESSAGE SIGN LS 500.0000 500.00 0.750 375.00 0.750 375.00 05 CLEAN BRIDGE DECK DRAIN EA 500.0000 10,500.00 21.000 10,500.00 21.000 10,500.00 06 MODIFY CONCRETE BARRIER (SCUPPERS) LS 20,500.0000 20,500.00 1.000 20,500.00 1.000 20,500.00 07 ROADWAY EXCAVATION CY 650.0000 14,950.00 0.000 0.00 08 MINOR HOT MIX ASPHALT TON 136.0000 8,024.00 0.000 0.00 09 PLACE HOT MIX ASPHALT DIKE LF 60.0000 3,600.00 0.000 0.00 10 PLACE HOT MIX ASPHALT SQYD 37.0000 6,660.00 0.000 0.00 (MISCELLANEOUS AREA) 11 ROCK SLOPE PROTECTION CY 400.0000 2,000.00 0.000 0.00 (BACKING NO. 2, METHOD B) 12 ROCK SLOPE PROTECTION FABRIC SQYD 5.0000 110.00 0.000 0.00 13 BRIDGE DECK DRAINAGE SYSTEM LB 4.0000 138,144.00 17,268.000 69,072.00 17,268.000 69,072.00 F) (MODIFIED) 14 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.500 250.00 0.500 250.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 07/21/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3E8704 TIME 05:08 PM ESTIMATE NO. 01 BID OPENING 03/11/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/09 R.E. NAME: GHASSEMI, MOHSSEN DATE OF THIS ESTIMATE 07/21/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 105,197.00 105,197.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 105,197.00 105,197.00 15 MOBILIZATION LS 23,000.0000 23,000.00 0.950 21,850.00 0.950 21,850.00 ORIGINAL CONTRACT AMOUNT 234,488.00 TOTAL WORK COMPLETED 127,047.00 127,047.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 127,047.00 127,047.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/16/09 85 06/23/09 05/01/09 09/03/09 52 4 0 0 53% 61% PROGRESS IS SATISFACTORY GHASSEMI, MOHSSEN RESIDENT ENGINEER PROGRAM CAS145 DATE 07/21/09