PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/21/12 EST. NO.02 TIME 11:17 AM R.E. NAME: KNUDSON, CAMERON 03-3E8904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/21/12 EST. NO.02 TIME 11:17 AM R.E. NAME: KNUDSON, CAMERON 03-3E8904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/21/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3E8904 TIME 11:17 AM ESTIMATE NO. 02 BID OPENING 05/24/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/17/12 R.E. NAME: KNUDSON, CAMERON DATE OF THIS ESTIMATE 05/21/12 LOCATION RERUN PROGRESS ESTIMATE 03-YUB-70-7.0/7.6 ----------------------- STUDEBAKER BROWN ELECTRICAL IN YUBA COUNTY AT OLIVERHURST FROM CONTRACTING 0.2 MILE SOUTH OF MCGOWAN PARKWAY 3835 BLUE HERON WAY OVERCROSSING TO 0.3 MILE NORTH OF GREENWOOD CA 95635 MCGOWAN PARKWAY OVERCROSSING FED. AID NO. NH-P070(101) FREEWAY AND INTERSECTION LIGHTING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 310.0000 310.00 0.810 251.10 0.900 279.00 002 PREPARE WATER POLLUTION CONTROL LS 740.0000 740.00 0.130 96.20 0.750 555.00 PROGRAM 003 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,240.0000 1,240.00 0.500 620.00 1.000 1,240.00 004 TRAFFIC CONTROL SYSTEM LS 8,500.0000 8,500.00 0.810 6,885.00 0.900 7,650.00 005 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,800.0000 1,800.00 0.900 1,620.00 0.900 1,620.00 006 REMOVE ROADSIDE SIGN EA 185.0000 740.00 0.000 0.00 007 LEAD COMPLIANCE PLAN LS 1,860.0000 1,860.00 1.000 1,860.00 008 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 0.1990 4,378.00 0.000 0.00 009 FURNISH SIGN STRUCTURE (TRUSS) LB 5.2850 95,605.65 0.000 0.00 (F) 010 INSTALL SIGN STRUCTURE (TRUSS) LB 0.2660 4,811.94 0.000 0.00 (F) 011 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 26.0000 5,200.00 0.000 0.00 012 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 25.0000 500.00 0.000 0.00 (0.063"-UNFRAMED) 013 54" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 959.3750 30,700.00 32.000 30,700.00 32.000 30,700.00 (SIGN FOUNDATION) 014 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 250.0000 1,000.00 0.000 0.00 METHOD) 015 MODIFIED METAL BEAM GUARD RAILING LF 128.0000 6,400.00 75.000 9,600.00 75.000 9,600.00 016 MODIFIED END ANCHOR ASSEMBLY EA 1,000.0000 2,000.00 2.000 2,000.00 2.000 2,000.00 (TYPE SFT) Y 017 MODIFIED ALTERNATIVE IN-LINE EA 3,350.0000 6,700.00 2.000 6,700.00 2.000 6,700.00 TERMINAL SYSTEM 018 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 600.0000 600.00 0.810 486.00 0.900 540.00 SYSTEM ELEMENTS DURING CONSTRUCTION 019 LIGHTING AND SIGN ILLUMINATION LS 233,000.0000 233,000.00 0.160 37,280.00 0.800 186,400.00 PROGRAM CAS145 PAGE 2 DATE 05/21/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3E8904 TIME 11:17 AM ESTIMATE NO. 02 BID OPENING 05/24/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/17/12 R.E. NAME: KNUDSON, CAMERON DATE OF THIS ESTIMATE 05/21/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 96,238.30 249,144.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 96,238.30 249,144.00 020 MOBILIZATION LS 7,000.0000 7,000.00 0.050 350.00 1.000 7,000.00 ORIGINAL CONTRACT AMOUNT 413,085.59 TOTAL WORK COMPLETED 96,588.30 256,144.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 96,588.30 256,144.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/15/11 45 04/02/12 12/05/11 06/12/12 24 90 0 0 62% 53% PROGRESS IS SATISFACTORY KNUDSON, CAMERON RESIDENT ENGINEER PROGRAM CAS145 DATE 05/21/12