PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/06/16 EST. NO. 014 TIME 01:11 PM R.E. NAME: TECLE, DANIEL 03-3F3404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 825.01 E.W. @ F.A.(+) 123015 N 001 0 825.01 TOTAL THIS ESTIMATE 299,501.37 TOTAL PREVIOUS ESTIMATE 300,326.38 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/06/16 EST. NO. 014 TIME 01:11 PM R.E. NAME: TECLE, DANIEL 03-3F3404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE NO CMPLT PAINT/SPAN -100,000.00 008 MOVE DEDUCT TO LIQ 100,000.00 009 MISSING 2016 CEM4401 -10,000.00 013 MISSING 2015 CEM4401 -10,000.00 013 REC'D 2015 CEM4401 10,000.00 014 10,000.00 -10,000.00 EQUAL EMPLOYMENT OPPORTUNITY MISSING CEM2402F -10,000.00 013 0.00 -10,000.00 LABOR COMPLIANCE VIOLATION PER LTR DATED 4/16 -10,000.00 008 PER LTR DATED 5/16 -10,000.00 009 RTN DEDUCT 4/16 10,000.00 010 RTN DEDUCT 5/16 10,000.00 010 CERTIFIED PAYROLLS -1,000.00 013 0.00 -1,000.00 LIQUIDATED DAMAGES NO CMPLT PAINT/SPAN -80,000.00 009 NO CMPLT PAINT EST8 -100,000.00 009 RTN DEDUCT/LIFT SPAN 40,000.00 011 0.00 -140,000.00 TOTAL DEDUCTIONS 10,000.00 -161,000.00 PROGRAM CAS145 PAGE 1 DATE 10/06/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3F3404 TIME 01:11 PM ESTIMATE NO. 014 BID OPENING 03/17/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/26/16 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/06/16 LOCATION SEMI-FINAL ESTIMATE 03-SAC-160-L7.0/ .0 ------------------- FD THOMAS, INC NEAR ISLETON AT THREE MILE SLOUGH 217 BATEMAN DR BRIDGE 24-121 CENTRAL POINT OR 97502 FED. AID NO. BHNH-P160(24)E PAINT ENTIRE BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 10,000.0000 10,000.00 1.000 10,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 10,759.0000 10,759.00 0.250 2,689.75 1.000 10,759 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,700.0000 357,000.00 3.000 5,100.00 213.000 362,100 004 CONSTRUCTION AREA SIGNS LS 17,000.0000 17,000.00 1.000 17,000 005 TRAFFIC CONTROL SYSTEM LS 250,000.0000 250,000.00 1.000 250,000 006 TYPE III BARRICADE EA 1,134.0000 9,072.00 8.000 9,072 007 TEMPORARY TRAFFIC STRIPE (TAPE) LF 3.7700 9,802.00 1,630.000 6,145 008 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 42.2400 13,516.80 250.000 10,560 009 TRAFFIC PLASTIC DRUM EA 249.2700 5,483.94 22.000 5,483 010 TEMPORARY SIGNAL SYSTEM LS 299,630.0000 299,630.00 0.297 88,990.11 0.947 283,749 011 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 25,908.0000 25,908.00 1.000 25,908 012 TEMPORARY RAILING (TYPE K) LF 75.0000 36,000.00 640.000 48,000 013 ALTERNATIVE TEMPORARY CRASH CUSHION EA 10,000.0000 40,000.00 4.000 40,000 014 JOB SITE MANAGEMENT LS 10,000.0000 10,000.00 1.000 10,000 015 PREPARE WATER POLLUTION CONTROL PROGRAM LS 10,083.3600 10,083.36 1.000 10,083 016 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 6.4300 8,423.30 1,250.000 8,037 STRIPE (HAZARDOUS WASTE) 017 WORK AREA MONITORING (BRIDGE) LS 50,000.0000 50,000.00 1.000 50,000 018 CONTRACTOR-SUPPLIED BIOLOGIST (DAY) WDAY 902.0000 90,200.00 100.000 90,200 019 SPECIES PROTECTION LS 3,000.0000 3,000.00 1.000 3,000 020 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.1400 6,908.00 2,085.000 6,546 021 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 40.0600 4,807.20 117.000 4,687.02 117.000 4,687 022 CLEAN AND PAINT STRUCTURAL STEEL LS 6,433,092.0000 6,433,092.00 0.993 6,388,060 (EXISTING BRIDGE) PROGRAM CAS145 PAGE 2 DATE 10/06/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3F3404 TIME 01:11 PM ESTIMATE NO. 014 BID OPENING 03/17/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/26/16 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/06/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 SPOT BLAST CLEAN & PAINT UNDERCOAT SQFT 63.6400 14,000.80 220.000 14,000 (CONTROL HOUSE) 024 CLEAN STRUCTURAL STEEL (CONTROL HOUSE) LS 41,704.0000 41,704.00 1.000 41,704 025 PAINT STRUCTURAL STEEL (CONTROL HOUSE) LS 39,300.0000 39,300.00 1.000 39,300 026 ADJUST LIFT SPAN BALANCE LS 137,340.0000 137,340.00 1.000 137,340 027 4" THERMOPLASTIC TRAFFIC STRIPE LF 3.6100 14,079.00 4,360.000 15,739 028 THERMOPLASTIC PAVEMENT MARKING SQFT 39.2400 7,063.20 180.000 7,063 029 4" THERMOPLASTIC TRAFFIC STRIPE LF 36.1900 4,342.80 120.000 4,342 (BROKEN 12-3) 030 PAVEMENT MARKER (RETROREFLECTIVE) EA 51.4600 5,660.60 130.000 6,689 031 BUILDING WORK LS 121,424.0000 121,424.00 1.000 121,424 PROGRAM CAS145 PAGE 3 DATE 10/06/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3F3404 TIME 01:11 PM ESTIMATE NO. 014 BID OPENING 03/17/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/26/16 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/06/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 101,466.88 8,036,996.99 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 825.01 300,326.38 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 102,291.89 8,337,323.37 032 MOBILIZATION LS 898,400.0000 898,400.00 1.000 898,400 ORIGINAL CONTRACT AMOUNT 8,984,000.00 TOTAL WORK COMPLETED 102,291.89 9,235,723.37 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 -161,000.00 TOTAL 112,291.89 9,074,723.37 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/13/15 210 09/08/15 09/08/15 08/26/16 218 24 8 0 100% 100% TECLE, DANIEL RESIDENT ENGINEER PROGRAM CAS145 DATE 10/06/16