PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/22/26 EST. NO. 002 TIME 09:40 AM R.E. NAME: ERICKSEN, BOB 03-3G5104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/22/26 EST. NO. 002 TIME 09:40 AM R.E. NAME: ERICKSEN, BOB 03-3G5104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION DEDUCT LETTER 10/26 -5,000.00 002 -5,000.00 -5,000.00 TOTAL DEDUCTIONS -5,000.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 10/22/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3G5104 TIME 09:40 AM ESTIMATE NO. 002 BID OPENING 05/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: ERICKSEN, BOB DATE OF THIS ESTIMATE 10/22/26 LOCATION PROGRESS ESTIMATE 03-ED-49-25.2/26.2 ----------------- DOUG VEERKAMP GENERAL EL DORADO COUNTY FROM 0.1 MILE NORTH OF ENGINEERING, INC. DEL ORO LANE TO 0.5 MILE SOUTH OF CASCADE 3701 TRADE WAY LANE CAMERON PARK CA 95682 FED. AID NO. N O N E TRAFFIC CONTROL SYSTEM AND CULVERT REHABIL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 825.0000 825.00 1.000 825 002 TIME-RELATED OVERHEAD (WDAY) WDAY 100.0000 5,000.00 11.000 1,100.00 13.000 1,300 003 CONSTRUCTION AREA SIGNS LS 5,110.0000 5,110.00 0.900 4,599 004 TRAFFIC CONTROL SYSTEM LS 66,300.0000 66,300.00 0.450 29,835.00 0.550 36,465 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 7,150.0000 7,150.00 0.550 3,932.50 0.550 3,932 006 AUTOMATED FLAGGER ASSISTANCE DEVICE DAY EA 78.0000 4,992.00 14.000 1,092.00 14.000 1,092 007 JOB SITE MANAGEMENT LS 47,500.0000 47,500.00 0.160 7,600.00 0.260 12,350 008 WATER POLLUTION CONTROL PROGRAM LS 820.0000 820.00 1.000 820 009 TEMPORARY EROSION CONTROL BLANKET SQYD 22.0000 924.00 42.000 924.00 42.000 924 010 TEMPORARY FIBER ROLL LF 6.0000 840.00 140.000 840.00 140.000 840 011 TEMPORARY GRAVEL BAG BERM LF 27.0000 378.00 14.000 378.00 14.000 378 012 TEMPORARY CONCRETE WASHOUT LS 180.0000 180.00 0.260 46.80 0.260 46 013 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 5,500.0000 5,500.00 1.000 5,500 014 CLEARING AND GRUBBING (LS) LS 4,470.0000 4,470.00 0.500 2,235.00 0.500 2,235 015 DITCH EXCAVATION CY 327.0000 1,635.00 5.000 1,635.00 5.000 1,635 016 EMBANKMENT CY 544.0000 3,264.00 6.000 3,264.00 6.000 3,264 017 HOT MIX ASPHALT (TYPE A) TON 543.0000 16,290.00 19.880 10,794.84 19.880 10,794 018 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 41.0000 545.30 13.500 553.50 13.500 553 019 PLACE HOT MIX ASPHALT (MISCELLANEOUS SQYD 67.0000 2,680.00 40.000 2,680.00 40.000 2,680 AREA) 020 TACK COAT TON 14,190.0000 1,419.00 0.100 1,419.00 0.100 1,419 021 REMOVE ASPHALT CONCRETE DIKE LF 6.0000 84.00 13.300 79.80 13.300 79 022 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 102.0000 4,080.00 33.000 3,366.00 33.000 3,366 PROGRAM CAS145 PAGE 2 DATE 10/22/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3G5104 TIME 09:40 AM ESTIMATE NO. 002 BID OPENING 05/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: ERICKSEN, BOB DATE OF THIS ESTIMATE 10/22/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CONCRETE BACKFILL (PIPE TRENCH) CY 1,080.0000 12,636.00 11.700 12,636.00 11.700 12,636 (F) 024 18" REINFORCED CONCRETE PIPE LF 317.0000 31,700.00 96.000 30,432.00 96.000 30,432 025 24" REINFORCED CONCRETE PIPE LF 369.0000 22,140.00 60.000 22,140.00 60.000 22,140 026 10" FLUME DOWNDRAIN LF 82.0000 1,640.00 20.000 1,640.00 20.000 1,640 027 10" TAPERED INLET EA 1,680.0000 1,680.00 1.000 1,680.00 1.000 1,680 028 10" FLUME ANCHOR ASSEMBLY EA 484.0000 1,452.00 2.000 968.00 2.000 968 029 REMOVE ENTRANCE TAPER EA 408.0000 408.00 1.000 408.00 1.000 408 030 REMOVE CULVERT (LF) LF 14.0000 2,240.00 158.000 2,212.00 158.000 2,212 031 REMOVE DOWNDRAIN (EA) EA 408.0000 408.00 1.000 408.00 1.000 408 032 REMOVE ASPHALT CONCRETE OVERSIDE DRAIN EA 163.0000 163.00 0.000 0 033 MODIFY DOWNDRAIN EA 1,500.0000 1,500.00 1.000 1,500.00 1.000 1,500 034 CLEANING, INSPECTING, AND PREPARING LF 41.0000 30,750.00 657.000 26,937 CULVERT (LF) 035 CULVERT SLURRY-CEMENT BACKFILL CY 924.0000 924.00 0.000 0 036 18" CURED-IN-PLACE PIPELINER LF 363.0000 24,321.00 0.000 0 037 24" CURED-IN-PLACE PIPELINER LF 317.0000 79,250.00 0.000 0 038 30" CURED-IN-PLACE PIPELINER LF 334.0000 111,556.00 0.000 0 039 ROCK SLOPE PROTECTION (20 LB, CLASS I, TON 963.0000 963.00 1.000 963.00 1.000 963 METHOD B) (TON) 040 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 85.0000 170.00 2.000 170.00 2.000 170 041 MARKER (CULVERT) EA 140.0000 2,660.00 19.000 2,660.00 19.000 2,660 042 REMOVE MARKER EA 22.0000 418.00 18.000 396.00 19.000 418 PROGRAM CAS145 PAGE 3 DATE 10/22/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3G5104 TIME 09:40 AM ESTIMATE NO. 002 BID OPENING 05/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: ERICKSEN, BOB DATE OF THIS ESTIMATE 10/22/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 149,988.44 200,271.44 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 149,988.44 200,271.44 043 MOBILIZATION LS 20,950.7000 20,950.70 0.200 4,190.14 0.950 19,903 ORIGINAL CONTRACT AMOUNT 527,916.00 TOTAL WORK COMPLETED 154,178.58 220,174.61 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -5,000.00 -5,000.00 TOTAL 149,178.58 215,174.61 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/20/26 50 08/26/26 08/26/26 11/12/26 13 12 0 0 42% 26% PROGRESS IS SATISFACTORY ERICKSEN, BOB RESIDENT ENGINEER