PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/21/13 EST. NO.02 TIME 02:14 PM R.E. NAME: TECLE, DANIEL 03-3M7204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/21/13 EST. NO.02 TIME 02:14 PM R.E. NAME: TECLE, DANIEL 03-3M7204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/21/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3M7204 TIME 02:14 PM ESTIMATE NO. 02 BID OPENING 03/26/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/17/13 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/21/13 LOCATION PROGRESS ESTIMATE 03-SAC-160-5.9/L7.0 ----------------- CALIFORNIA ENGINEERING IN SACRAMENTO COUNTY NEAR RIO VISTA CONTRACTORS INC AT THREE MILE SLOUGH BRIDE 20 HAPPY VALLEY ROAD PLEASANTON CA 94566 FED. AID NO. N O N E PREP AND PAINT 2 BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 0.000 0 002 CONSTRUCTION AREA SIGNS LS 7,000.0000 7,000.00 0.500 3,500.00 1.000 7,000 003 TRAFFIC CONTROL SYSTEM LS 115,000.0000 115,000.00 0.050 5,750.00 0.100 11,500 004 TYPE III BARRICADE EA 50.0000 700.00 0.000 0 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 20,000.0000 20,000.00 0.050 1,000.00 0.100 2,000 006 JOB SITE MANAGEMENT LS 2,500.0000 2,500.00 0.000 0 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 700.0000 700.00 0.750 525 008 TEMPORARY CONCRETE WASHOUT LS 100.0000 100.00 0.000 0 009 ASBESTOS COMPLIANCE PLAN LS 2,000.0000 2,000.00 0.000 0 010 CONTRACTOR-SUPPLIED BIOLOGIST (DAY) WDAY 400.0000 16,000.00 2.000 800.00 2.000 800 011 RAPID SETTING CONCRETE (PATCH) CF 200.0000 7,600.00 0.000 0 012 REPAIR SPALLED SURFACE AREA SQFT 50.0000 24,000.00 0.000 0 013 REMOVE CONCRETE DECK SURFACE SQFT 2.0000 30,274.00 0.000 0 014 REMOVE UNSOUND CONCRETE CF 100.0000 3,800.00 0.000 0 015 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.3000 4,541.10 0.000 0 016 FURNISH POLYESTER CONCRETE OVERLAY CF 75.0000 85,125.00 0.000 0 017 PLACE POLYESTER CONCRETE OVERLAY SQFT 4.0000 60,548.00 0.000 0 (F) 018 REMOVE RIVETS EA 30.0000 75,780.00 0.000 0 019 BRIDGE REMOVAL (PORTION) LS 2,500.0000 2,500.00 0.000 0 020 RECONSTRUCT METAL SIDEWALK (BRIDGE) LF 100.0000 36,000.00 0.000 0 021 CLEAN EXPANSION JOINT LF 40.0000 14,880.00 0.000 0 022 JOINT SEAL (MR 1/2") LF 25.0000 9,300.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 10/21/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3M7204 TIME 02:14 PM ESTIMATE NO. 02 BID OPENING 03/26/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/17/13 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/21/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 STRUCTURAL STEEL (BRIDGE) LB 20.0000 13,000.00 0.000 0 (F) 024 STEEL BRIDGE DECK GRATE SYSTEM LB 6.7500 848,070.00 25,636.710 173,047.79 25,636.710 173,047 025 CLEAN AND PAINT STRUCTURAL STEEL LS 20,000.0000 20,000.00 0.000 0 026 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 100.0000 79,800.00 0.000 0 027 WORK AREA MONITORING LS 5,000.0000 5,000.00 0.000 0 028 PREPARE AND PAINT CONCRETE SQFT 10.0000 48,000.00 0.000 0 029 STEEL BRIDGE RAILING (SKID RAIL) LF 700.0000 12,600.00 0.000 0 030 STEEL HANDRAILING LF 700.0000 12,600.00 0.000 0 031 4" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 4,480.00 0.000 0 032 THERMOPLASTIC PAVEMENT MARKING SQFT 10.0000 240.00 0.000 0 033 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 250.00 0.000 0 034 ADJUST BALANCE CONDITION LS 511,000.0000 511,000.00 0.000 0 035 BUILDING WORK LS 150,000.0000 150,000.00 0.150 22,500.00 0.150 22,500 PROGRAM CAS145 PAGE 3 DATE 10/21/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-3M7204 TIME 02:14 PM ESTIMATE NO. 02 BID OPENING 03/26/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/17/13 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/21/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 206,597.79 217,372.79 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 206,597.79 217,372.79 036 MOBILIZATION LS 243,000.0000 243,000.00 0.500 121,500.00 0.500 121,500 ORIGINAL CONTRACT AMOUNT 2,468,388.10 TOTAL WORK COMPLETED 328,097.79 338,872.79 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 328,097.79 338,872.79 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/04/13 100 09/17/13 07/05/13 12/04/13 71 2 0 0 14% 71% PROGRESS IS SATISFACTORY TECLE, DANIEL RESIDENT ENGINEER PROGRAM CAS145 DATE 10/21/13