PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/08 EST. NO.01 TIME 09:59 AM R.E. NAME: OULAD-DAOUD, BRAHIM 03-4E2104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/08 EST. NO.01 TIME 09:59 AM R.E. NAME: OULAD-DAOUD, BRAHIM 03-4E2104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4E2104 TIME 09:59 AM ESTIMATE NO. 01 BID OPENING 06/10/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: OULAD-DAOUD, BRAHIM DATE OF THIS ESTIMATE 08/22/08 LOCATION RERUN PROGRESS ESTIMATE 03-PLA-80-4.2/4.9 ----------------------- MARTIN GENERAL ENGINEERING INC IN PLACER COUNTY IN ROSEVILLE AND 12485 QUICKSILVER DRIVE ROCKLIN ON THE EASTBOUND ROUTE 80 RANCHO CORDOVA CA 95742 TO NORTHBOUND ROUTE 65 CONNECTOR FED. AID NO. N O N E PLACE HOT MIX ASPHALT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 300.0000 300.00 0.370 111.00 0.370 111.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750.00 0.750 750.00 S) PROGRAM 03 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 300.0000 300.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 1,500.0000 1,500.00 0.700 1,050.00 0.700 1,050.00 S) 05 TRAFFIC CONTROL SYSTEM LS 10,000.0000 10,000.00 0.370 3,700.00 0.370 3,700.00 S) 06 TRAFFIC PLASTIC DRUM EA 150.0000 1,800.00 0.000 0.00 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,600.0000 1,600.00 0.370 592.00 0.370 592.00 S) 08 TEMPORARY RAILING (TYPE K) LF 13.0000 3,900.00 0.000 0.00 09 TEMPORARY CRASH CUSHION MODULE EA 800.0000 11,200.00 0.000 0.00 10 REMOVE METAL BEAM GUARD RAILING LF 15.0000 2,850.00 0.000 0.00 11 REMOVE ASPHALT CONCRETE DIKE LF 41.0000 2,870.00 0.000 0.00 12 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.5000 15,450.00 10,388.520 15,582.78 10,388.520 15,582.78 S) 13 HOT MIX ASPHALT TON 111.0000 49,950.00 462.390 51,325.29 462.390 51,325.29 14 HOT MIX ASPHALT (OPEN GRADED) TON 114.0000 44,460.00 0.000 0.00 15 PAVING ASPHALT (BINDER, GEOSYNTHETIC TON 1,200.0000 3,600.00 0.000 0.00 PAVEMENT INTERLAYER) 16 GEOSYNTHETIC PAVEMENT INTERLAYER SQYD 2.3000 6,302.00 2,561.740 5,892.00 2,561.740 5,892.00 17 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 45.0000 2,970.00 0.000 0.00 18 MINOR CONCRETE (MINOR STRUCTURE) CY 10,000.0000 14,000.00 0.000 0.00 F) 19 DELINEATOR (CLASS 1) EA 49.0000 1,421.00 0.000 0.00 20 METAL BEAM GUARD RAILING (WOOD POST) LF 43.5000 3,828.00 0.000 0.00 S) 21 DOUBLE METAL BEAM GUARD RAILING LF 64.4000 4,830.00 0.000 0.00 S) (WOOD POST) 22 TRANSITION RAILING (TYPE WB) EA 4,800.0000 9,600.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4E2104 TIME 09:59 AM ESTIMATE NO. 01 BID OPENING 06/10/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: OULAD-DAOUD, BRAHIM DATE OF THIS ESTIMATE 08/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 TERMINAL SYSTEM (TYPE CAT) EA 6,100.0000 6,100.00 0.000 0.00 S) 24 TERMINAL SYSTEM (TYPE CAT) BACKUP EA 560.0000 560.00 0.000 0.00 25 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,500.0000 3,500.00 0.000 0.00 S) 26 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 3,490.00 0.000 0.00 S) 27 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,830.00 0.000 0.00 S) (BROKEN 36-12) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.5000 540.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4E2104 TIME 09:59 AM ESTIMATE NO. 01 BID OPENING 06/10/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: OULAD-DAOUD, BRAHIM DATE OF THIS ESTIMATE 08/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 79,003.07 79,003.07 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 79,003.07 79,003.07 ORIGINAL CONTRACT AMOUNT 209,751.00 TOTAL WORK COMPLETED 79,003.07 79,003.07 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 79,003.07 79,003.07 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/10/08 30 00/00/00 07/25/08 09/05/08 19 0 0 0 37% 63% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU PER RE REQUEST OULAD-DAOUD, BRAHIM RESIDENT ENGINEER PROGRAM CAS145 DATE 08/22/08