PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/20/22 EST. NO. 003 TIME 04:31 PM R.E. NAME: HOWARD GIANG 03-4F1714 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/20/22 EST. NO. 003 TIME 04:31 PM R.E. NAME: HOWARD GIANG 03-4F1714 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE OUT-STET INSPECTION -2,000.00 001 0.00 -2,000.00 TOTAL DEDUCTIONS 0.00 -2,000.00 PROGRAM CAS145 PAGE 1 DATE 01/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F1714 TIME 04:31 PM ESTIMATE NO. 003 BID OPENING 01/28/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/22 R.E. NAME: HOWARD GIANG DATE OF THIS ESTIMATE 01/20/22 LOCATION PROGRESS ESTIMATE 03-YOL-16-27.5/28.3 ----------------- FBD VANGUARD CONSTRUCTION, IN ESPARTO, FROM ORLEANS STREET TO INC. COUNTY ROAD 21A. 550 GREENVILLE ROAD; LIVERMORE CA 94550 FED. AID NO. HSNH-P016(42)E IMPROVE PEDESTRIAN SAFETY BY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,100.0000 1,100.00 1.000 1,100 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 2,800.0000 2,800.00 0.800 2,240 003 TIME-RELATED OVERHEAD (LS) LS 108,000.0000 108,000.00 0.050 5,400.00 0.400 43,200 004 DEVELOP WATER SUPPLY LS 1,200.0000 1,200.00 0.000 0 005 CONSTRUCTION AREA SIGNS LS 11,300.0000 11,300.00 0.550 6,215 006 TRAFFIC CONTROL SYSTEM LS 60,000.0000 60,000.00 0.200 12,000.00 0.200 12,000 007 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 5,000.0000 5,000.00 0.200 1,000.00 0.200 1,000 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 8,000.0000 8,000.00 0.200 1,600.00 0.200 1,600 009 JOB SITE MANAGEMENT LS 4,000.0000 4,000.00 0.050 200.00 0.400 1,600 010 PREPARE STORM WATER POLLUTION PREVENTION LS 2,100.0000 2,100.00 0.000 0 PLAN 011 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 012 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 013 MOVE-IN/MOVE-OUT EA 550.0000 3,300.00 0.000 0 (TEMPORARY EROSION CONTROL) 014 TEMPORARY HYDRAULIC MULCH SQYD 2.3000 2,185.00 0.000 0 (BONDED FIBER MATRIX) 015 TEMPORARY COVER SQYD 2.8000 2,660.00 0.000 0 016 TEMPORARY CHECK DAM LF 12.4000 3,472.00 0.000 0 017 TEMPORARY DRAINAGE INLET PROTECTION EA 205.0000 4,305.00 0.000 0 018 TEMPORARY FIBER ROLL LF 2.8000 9,800.00 0.000 0 019 TEMPORARY CONCRETE WASHOUT LS 1,200.0000 1,200.00 0.000 0 020 TREATED WOOD WASTE LB 3.3300 11,155.50 0.000 0 021 CLEARING AND GRUBBING (LS) LS 23,800.0000 23,800.00 0.200 4,760.00 0.200 4,760 022 ROADWAY EXCAVATION CY 169.0000 302,510.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 01/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F1714 TIME 04:31 PM ESTIMATE NO. 003 BID OPENING 01/28/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/22 R.E. NAME: HOWARD GIANG DATE OF THIS ESTIMATE 01/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CONCRETE PLANTER EA 7,500.0000 15,000.00 0.000 0 024 DECOMPOSED GRANITE SQFT 2.4500 30,625.00 0.000 0 025 REMOVE IRRIGATION FACILITY LS 5,000.0000 5,000.00 0.000 0 026 CLASS 2 AGGREGATE BASE (CY) CY 40.0000 29,600.00 0.000 0 027 REPLACE ASPHALT CONCRETE SURFACING CY 665.0000 53,200.00 0.000 0 028 HOT MIX ASPHALT (TYPE A) TON 150.0000 379,500.00 0.000 0 029 TEXTURED AND COLORED HOT MIX ASPHALT SQYD 124.0000 97,960.00 0.000 0 030 TACK COAT TON 550.0000 3,300.00 0.000 0 031 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.1600 49,504.00 0.000 0 032 STRUCTURAL CONCRETE, HEADWALL CY 3,000.0000 14,100.00 0.000 0 (F) 033 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1,850.0000 162,800.00 9.240 17,094.00 9.240 17,094 (F) 034 12" PLASTIC PIPE LF 64.5000 25,155.00 137.000 8,836.50 137.000 8,836 035 18" PLASTIC PIPE LF 98.0000 89,180.00 186.000 18,228.00 186.000 18,228 036 24" PLASTIC PIPE LF 62.0000 7,440.00 0.000 0 037 12" ALTERNATIVE FLARED END SECTION EA 1,050.0000 1,050.00 0.000 0 038 24" HEAVY DUTY AUTOMATIC DRAINAGE GATE EA 2,900.0000 2,900.00 0.000 0 039 REMOVE CULVERT (LF) LF 35.0000 5,950.00 80.000 2,800.00 80.000 2,800 040 REMOVE INLET EA 915.0000 4,575.00 2.000 1,830.00 2.000 1,830 041 CULVERT SLURRY-CEMENT BACKFILL CY 1,030.0000 13,390.00 0.000 0 042 ROCK SLOPE PROTECTION CY 3,700.0000 1,110.00 0.000 0 (60 LB, CLASS II, METHOD B) (CY) 043 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 800.0000 1,120.00 0.000 0 044 MINOR CONCRETE (CURB) (CY) CY 1,200.0000 15,600.00 0.000 0 045 DETECTABLE WARNING SURFACE SQFT 18.0000 10,980.00 0.000 0 046 MINOR CONCRETE (CURB AND GUTTER) CY 750.0000 120,000.00 0.000 0 047 MINOR CONCRETE (DRIVEWAY) CY 750.0000 21,000.00 0.000 0 048 MINOR CONCRETE (SIDEWALK) CY 750.0000 142,500.00 0.000 0 049 REMOVE CONCRETE CURB (LF) LF 10.0000 2,600.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 01/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F1714 TIME 04:31 PM ESTIMATE NO. 003 BID OPENING 01/28/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/22 R.E. NAME: HOWARD GIANG DATE OF THIS ESTIMATE 01/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 REMOVE CONCRETE SIDEWALK (SQYD) SQYD 63.0000 64,890.00 0.000 0 051 REMOVE CONCRETE (CURB AND GUTTER) LF 14.0000 24,920.00 0.000 0 052 PRE/POST CONSTRUCTION SURVEYS EA 1,100.0000 23,100.00 0.000 0 053 MISCELLANEOUS IRON AND STEEL LB 3.1500 40,950.00 0.000 0 (F) 054 ADJUST MANHOLE FRAME AND COVER EA 3,000.0000 60,000.00 0.000 0 (UTILITY) 055 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.5000 1,320.00 0.000 0 056 REMOVE ROADSIDE SIGN EA 88.0000 4,664.00 0.000 0 057 RELOCATE ROADSIDE SIGN EA 221.0000 1,989.00 0.000 0 058 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 18.0000 4,680.00 0.000 0 (0.063"-UNFRAMED) 059 ROADSIDE SIGN - ONE POST EA 330.0000 15,840.00 0.000 0 060 REMOVE GUARDRAIL LF 50.0000 6,000.00 0.000 0 061 THERMOPLASTIC PAVEMENT MARKING SQFT 4.4300 6,777.90 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 062 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 101.20 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 063 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 660.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 064 BIKE LANE MARKING (GREEN) SQFT 7.7000 92,400.00 0.000 0 065 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 9,636.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 066 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 1,100.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 067 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.2000 1,210.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 068 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 4.6000 7,360.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 069 LOCATING AND MAPPING UNDERGROUND LS 7,000.0000 7,000.00 0.000 0 FACILITIES 070 LIGHTING SYSTEM LS 235,000.0000 235,000.00 0.000 0 071 MODIFYING FLASHING BEACON SYSTEMS LS 17,700.0000 17,700.00 0.000 0 072 REMOVING LIGHTING SYSTEMS LS 6,600.0000 6,600.00 0.000 0 073 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 074 RESET BUS STOP SHELTER EA 8,500.0000 8,500.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 01/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F1714 TIME 04:31 PM ESTIMATE NO. 003 BID OPENING 01/28/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/22 R.E. NAME: HOWARD GIANG DATE OF THIS ESTIMATE 01/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 73,748.50 122,503.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 73,748.50 122,503.50 075 MOBILIZATION LS 250,000.0000 250,000.00 0.500 125,000.00 0.500 125,000 ORIGINAL CONTRACT AMOUNT 2,767,424.60 TOTAL WORK COMPLETED 198,748.50 247,503.50 MATERIALS ON HAND ON SITE 33,623.00 33,623.00 DEDUCTIONS 0.00 -2,000.00 TOTAL 232,371.50 279,126.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/09/21 60 05/28/21 05/28/21 03/10/22 26 122 0 0 9% 43% PROGRESS IS SATISFACTORY HOWARD GIANG RESIDENT ENGINEER PROGRAM CAS145 DATE 01/20/22