PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/24/23 EST. NO. 005 TIME 09:35 AM R.E. NAME: TECLE, DANIEL 03-4F6504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0002 462.45 E.W. @ F.A.(+) 091123 N 0011.0 0010 319.57 082123 N 5001 0 0014 9,185.69 083123 N 0023.0 0017 2,569.05 081423 N 0027.0 0018 684.91 090623 N 0010.1 0019 1,375.80 091823 N 0012.1 0020 2,582.81 080223 N 0013.1 002 0005 2,398.93 E.W. @ F.A.(+) 091923 N 0015.0 19,579.21 TOTAL THIS ESTIMATE 9,202.22 TOTAL PREVIOUS ESTIMATE 28,781.43 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/24/23 EST. NO. 005 TIME 09:35 AM R.E. NAME: TECLE, DANIEL 03-4F6504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE SWPPP PERF FAILURE -10,000.00 004 PERF FAILURE 10/23 -20,000.00 005 RTN SWPPP FAILURE 10,000.00 005 -10,000.00 -20,000.00 LABOR COMPLIANCE VIOLATION DEDUCT LTTR 9/23 -3,000.00 004 RTN LTTR 9/23 3,000.00 005 3,000.00 0.00 TOTAL DEDUCTIONS -7,000.00 -20,000.00 PROGRAM CAS145 PAGE 1 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 LOCATION RERUN PROGRESS ESTIMATE 03-YOL-50-0.0/2.5 ----------------------- 03-YOL-80-4.1/R11.4 FLAT-IRON TEICHERT A JOINT YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON VENTURE ROUTE 80 FROM 1.7 MILES EAST OF MACE 1200 CONCORD AVENUE SUITE 465 BOULEVARD OVERCROSSING TO SACRAMENTO RIVER CONCORD CA 94520 BRIDGE AND OVERHEAD (BRYTE BEND) AND ON FED. AID NO. ACNH-X113(36)E CRCP, HMA (TYPE A), RDWY EXC, CLASS 2 AB, ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,523.0000 2,523.00 1.000 2,523 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 5,000.0000 5,000.00 0.250 1,250 003 TIME-RELATED OVERHEAD (LS) LS 5,000,000.0000 5,000,000.00 0.040 200,000.00 0.135 675,000 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 102,000.00 1.000 6,000.00 2.000 12,000 005 HOURLY OFF-SITE HR 200.0000 24,000.00 3.000 600 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 150,000.0000 150,000.00 0.040 6,000.00 0.135 20,250 007 CONSTRUCTION AREA SIGNS LS 201,515.1500 201,515.15 0.400 80,606 008 TRAFFIC CONTROL SYSTEM LS 5,500,000.0000 5,500,000.00 0.040 220,000.00 0.135 742,500 009 TRAFFIC CONTROL SUPERVISOR DAY 2,000.0000 800,000.00 21.000 42,000.00 68.000 136,000 010 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 900.0000 27,000.00 0.000 0 011 AUTOMATED WORK ZONE INFORMATION SYSTEM LS 250,000.0000 250,000.00 0.040 10,000.00 0.135 33,750 012 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.3000 456,000.00 16,841.000 5,052.30 331,642.000 99,492 013 PLASTIC TRAFFIC DRUMS EA 67.5000 217,350.00 24.000 1,620.00 583.000 39,352 014 TEMPORARY PAVEMENT MARKER EA 5.0500 116,655.00 328.000 1,656.40 6,007.000 30,335 015 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 15,756.0800 15,756.08 0.000 0 016 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 400,000.0000 400,000.00 0.040 16,000.00 0.135 54,000 017 TEMPORARY AUTOMATED END OF QUEUE WARNING EA 400.0000 864,000.00 60.000 24,000.00 126.000 50,400 SYSTEM (TYPE 2) DAY 018 TEMPORARY RAILING (TYPE K) LF 13.0000 4,914,000.00 9,480.000 123,240.00 64,320.000 836,160 019 ALTERNATIVE TEMPORARY CRASH CUSHION EA 1,100.0000 74,800.00 4.000 4,400.00 8.000 8,800 020 TEMPORARY TRAFFIC SCREEN LF 3.0000 1,134,000.00 2,880.000 8,640.00 20,550.000 61,650 021 TEMPORARY RADAR SPEED FEEDBACK SIGN EA 9,350.0000 37,400.00 3.000 28,050 SYSTEM 022 JOB SITE MANAGEMENT LS 500,000.0000 500,000.00 0.040 20,000.00 0.135 67,500 PROGRAM CAS145 PAGE 2 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PREPARE STORM WATER POLLUTION PREVENTION LS 2,220.1000 2,220.10 0.500 1,110 PLAN 024 RAIN EVENT ACTION PLAN EA 500.0000 37,500.00 0.000 0 025 STORM WATER SAMPLING AND ANALYSIS DAY EA 345.3500 41,442.00 0.000 0 026 STORM WATER ANNUAL REPORT EA 2,000.0000 8,000.00 0.000 0 027 MOVE-IN/MOVE-OUT (TEMPORARY EROSION EA 808.1800 14,547.24 1.000 808 CONTROL) 028 TEMPORARY HYDRAULIC MULCH (BONDED FIBER SQYD 0.8400 55,608.00 0.000 0 MATRIX) 029 TEMPORARY COVER SQYD 4.0000 40,000.00 0.000 0 030 TEMPORARY CHECK DAM LF 9.4800 10,617.60 0.000 0 031 TEMPORARY DRAINAGE INLET PROTECTION EA 183.1900 15,387.96 10.000 1,831.90 13.000 2,381 032 TEMPORARY FIBER ROLL LF 4.5300 129,105.00 0.000 0 033 TEMPORARY GRAVEL BAG BERM LF 9.7000 64,020.00 0.000 0 034 TEMPORARY SILT FENCE LF 4.4200 343,434.00 0.000 0 035 TEMPORARY CONSTRUCTION ENTRANCE EA 5,000.0000 180,000.00 1.000 5,000 036 STREET SWEEPING LS 300,000.0000 300,000.00 0.040 12,000.00 0.135 40,500 037 TEMPORARY CONCRETE WASHOUT LS 100,000.0000 100,000.00 0.040 4,000.00 0.135 13,500 038 ASBESTOS COMPLIANCE PLAN LS 3,337.8600 3,337.86 0.000 0 039 TREATED WOOD WASTE LB 0.1000 56,800.00 0.000 0 040 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 250,677.4900 250,677.49 0.040 10,027.10 0.236 59,159 041 NATURAL RESOURCE PROTECTION PLAN LS 2,539.5500 2,539.55 1.000 2,539 042 BIOLOGICAL ANNUAL MONITORING REPORT LS 7,301.6600 7,301.66 0.000 0 043 FINAL MONITORING REPORT LS 4,362.4900 4,362.49 0.000 0 044 BIOLOGICAL RESOURCE INFORMATION PROGRAM LS 4,119.5200 4,119.52 1.000 4,119 045 TEMPORARY HIGH-VISIBILITY FENCE LF 3.7700 44,863.00 9,268.000 34,940 046 CLEARING AND GRUBBING (LS) LS 250,000.0000 250,000.00 1.000 250,000 047 DUST PALLIATIVE LS 150,000.0000 150,000.00 0.000 0 048 ROADWAY EXCAVATION CY 42.0000 7,392,000.00 2,243.400 94,222.80 24,876.700 1,044,821 049 ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY CY 265.0000 1,028,200.00 326.500 86,522 DEPOSITED LEAD) PROGRAM CAS145 PAGE 3 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 SHOULDER BACKING TON 55.0000 187,000.00 0.000 0 051 STRUCTURE EXCAVATION (BRIDGE) CY 170.4500 59,998.40 83.330 14,203.60 83.330 14,203 (F) 052 STRUCTURE BACKFILL (BRIDGE) CY 275.6300 61,189.86 0.000 0 (F) 053 DITCH EXCAVATION CY 170.0000 629.00 0.000 0 054 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 055 SUBGRADE ENHANCEMENT GEOGRID SQYD 2.7500 583,000.00 1,402.000 3,855.50 5,302.000 14,580 056 CHECK AND TEST EXISTING IRRIGATION LS 25,000.0000 25,000.00 0.500 12,500 FACILITIES 057 OPERATE EXISTING IRRIGATION FACILITIES LS 25,000.0000 25,000.00 0.040 1,000.00 0.134 3,350 058 BONDED FIBER MATRIX (SQFT) SQFT 0.1500 147,750.00 0.000 0 059 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 1.5300 844,560.00 0.000 0 060 HYDROMULCH SQFT 0.0900 49,410.00 0.000 0 061 COMPOST (CY) CY 68.9600 652,361.60 0.000 0 062 INCORPORATE MATERIALS SQFT 0.0500 21,650.00 0.000 0 063 CLASS 2 AGGREGATE BASE (CY) CY 65.0000 10,725,000.00 8,341.500 542,197.50 19,433.100 1,263,151 064 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 065 HIGH FRICTION SURFACE TREATMENT SQYD 36.0000 165,600.00 0.000 0 066 HOT MIX ASPHALT (TYPE A) TON 105.0000 16,800,000.00 1,296.700 136,153.50 22,833.500 2,397,517 067 MINOR HOT MIX ASPHALT TON 120.0000 81,600.00 0.000 0 068 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 130.0000 5,642,000.00 150.800 19,604.00 150.800 19,604 069 TEXTURED AND COLORED HOT MIX ASPHALT SQYD 50.0000 600,000.00 0.000 0 PAVING 070 HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED TON 117.0000 494,910.00 0.000 0 FRICTION COURSE) 071 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED TON 170.0000 214,200.00 0.000 0 (OPEN GRADED FRICTION COURSE) 072 DATA CORE LS 15,000.0000 15,000.00 0.000 0 073 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 074 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 4.0000 3,960.00 0.000 0 075 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 4.0000 520.00 0.000 0 076 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 4.0000 65,200.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 4.0000 63,600.00 0.000 0 078 PLACE HOT MIX ASPHALT (MISCELLANEOUS SQYD 122.0000 18,300.00 0.000 0 AREA) 079 TACK COAT TON 2,700.0000 459,000.00 5.590 15,093.00 11.690 31,563 080 REMOVE ASPHALT CONCRETE DIKE LF 3.5000 115,850.00 0.000 0 081 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.5000 692,500.00 31,728.500 79,321 082 CONTINUOUSLY REINFORCED CONCRETE CY 394.0000 32,347,400.00 0.000 0 PAVEMENT 083 CONTINUOUSLY REINFORCED CONCRETE CY 550.0000 14,960,000.00 0.000 0 PAVEMENT (INTERMEDIATE STRENGTH CONCRETE) 084 JOINTED PLAIN CONCRETE PAVEMENT (RSC) CY 400.0000 408,000.00 0.000 0 085 REMOVE CONCRETE PAVEMENT AND BASE CY 65.0000 5,492,500.00 2,591.000 168,415.00 4,170.000 271,050 086 FURNISH PILING (CLASS 200) (ALTERNATIVE LF 80.0000 435,840.00 0.000 0 W) 087 DRIVE PILE (CLASS 200) (ALTERNATIVE W) EA 4,409.5000 388,036.00 0.000 0 088 60" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 1,886.5000 622,545.00 0.000 0 (SIGN FOUNDATION) 089 72" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 2,128.6500 681,168.00 0.000 0 (SIGN FOUNDATION) 090 78" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 2,271.9300 163,578.96 0.000 0 (SIGN FOUNDATION) 091 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 900.0000 95,400.00 0.000 0 (F) 092 STRUCTURAL CONCRETE, BRIDGE CY 1,750.0000 1,396,500.00 0.000 0 (F) 093 STRUCTURAL CONCRETE, BRIDGE (POLYMER CY 3,250.0000 3,952,000.00 0.000 0 (F) FIBER) 094 AGGREGATE BASE (APPROACH SLAB) CY 537.0900 13,427.25 0.000 0 095 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE CY 1,000.0000 396,000.00 0.000 0 (F) N) 096 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE CY 1,350.0000 1,412,100.00 0.000 0 R) 097 STRUCTURAL CONCRETE, DRAINAGE INLET CY 4,201.5700 457,971.13 0.000 0 (F) 098 MINOR CONCRETE (MINOR STRUCTURE) CY 2,600.0000 41,600.00 0.000 0 (F) 099 PAVING NOTCH EXTENSION CF 225.0000 137,700.00 0.000 0 100 DRILL AND BOND DOWEL LF 33.5500 446,953.10 0.000 0 101 CLEAN EXPANSION JOINT LF 39.0000 16,887.00 0.000 0 102 JOINT SEAL (MR 1/2") LF 85.0000 106,590.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 103 JOINT SEAL (MR 1") LF 97.0000 7,178.00 0.000 0 104 BAR REINFORCING STEEL (BRIDGE) LB 1.2800 1,036,230.40 0.000 0 (F) 105 BAR REINFORCING STEEL (GALVANIZED) LB 2.4300 2,291.49 0.000 0 (F) 106 FURNISH SIGN STRUCTURE (VERSATILE TRUSS) LB 6.7600 5,340,400.00 0.000 0 107 INSTALL SIGN STRUCTURE (VERSATILE TRUSS) LB 0.4300 339,700.00 0.000 0 108 ALUMINUM WALKWAY GRATING (VERSATILE SQFT 86.5600 457,036.80 0.000 0 TRUSS) 109 REMOVE SIGN STRUCTURE (EA) EA 8,655.9700 129,839.55 0.500 4,327.99 3.000 25,967 110 MODIFY SIGN STRUCTURE EA 6,491.9800 84,395.74 0.000 0 111 PUBLIC SAFETY PLAN LS 20,000.0000 20,000.00 0.000 0 112 RAPID SETTING CONCRETE (PATCH) CF 85.0000 43,180.00 0.000 0 113 REMOVE ASPHALT CONCRETE SURFACING SQFT 4.2500 150,662.50 4,674.000 19,864.50 4,674.000 19,864 114 REMOVE UNSOUND CONCRETE CF 85.0000 43,180.00 0.000 0 115 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 1.0000 113,762.00 0.000 0 116 FURNISH POLYESTER CONCRETE OVERLAY CF 90.0000 1,089,360.00 0.000 0 117 PLACE POLYESTER CONCRETE OVERLAY SQFT 4.8000 546,057.60 0.000 0 (F) 118 BRIDGE REMOVAL (PORTION), LOCATION A LS 276,398.0000 276,398.00 0.500 138,199.00 0.500 138,199 119 BRIDGE REMOVAL (PORTION), LOCATION B LS 172,569.0000 172,569.00 0.600 103,541.40 0.600 103,541 120 BRIDGE REMOVAL (PORTION), LOCATION C LS 40,627.0000 40,627.00 0.500 20,313.50 0.500 20,313 121 BRIDGE REMOVAL (PORTION), LOCATION D LS 713,949.0000 713,949.00 0.060 42,836.94 0.390 278,440 122 BRIDGE REMOVAL (PORTION), LOCATION E LS 2,181,432.0000 2,181,432.00 0.040 87,257.28 0.040 87,257 123 BRIDGE REMOVAL (PORTION), LOCATION F LS 15,500.0000 15,500.00 0.000 0 124 BRIDGE REMOVAL (PORTION), LOCATION G LS 15,120.0000 15,120.00 0.000 0 125 CONCRETE BACKFILL (PIPE TRENCH) CY 447.6400 11,638.64 0.000 0 (F) 126 18" REINFORCED CONCRETE PIPE LF 234.6000 79,764.00 0.000 0 127 18" CORRUGATED STEEL PIPE (.109" THICK) LF 273.4000 166,774.00 53.900 14,736.26 53.900 14,736 128 24" CORRUGATED STEEL PIPE (.138" THICK) LF 343.5500 85,887.50 0.000 0 129 30" CORRUGATED STEEL PIPE (.138" THICK) LF 288.1900 6,340.18 0.000 0 PROGRAM CAS145 PAGE 6 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 130 36" CORRUGATED STEEL PIPE (.138" THICK) LF 486.6700 45,746.98 0.000 0 131 18" SLOTTED CORRUGATED STEEL PIPE (.168" LF 320.1700 14,407.65 0.000 0 THICK) 132 18" CORRUGATED STEEL PIPE DOWNDRAIN LF 116.5200 120,015.60 0.000 0 (.109" THICK) 133 18" ANCHOR ASSEMBLY EA 617.4800 14,819.52 0.000 0 134 18" STEEL FLARED END SECTION EA 952.5200 20,955.44 2.000 1,905.04 2.000 1,905 135 24" STEEL FLARED END SECTION EA 1,335.9800 16,031.76 0.000 0 136 30" STEEL FLARED END SECTION EA 2,613.6400 2,613.64 0.000 0 137 36" STEEL FLARED END SECTION EA 3,271.4100 9,814.23 0.000 0 138 54" STEEL FLARED END SECTION EA 4,346.1000 8,692.20 0.000 0 139 18" CONCRETE FLARED END SECTION EA 4,908.2500 24,541.25 0.000 0 140 ABANDON CULVERT (LF) LF 58.8700 17,072.30 0.000 0 141 REMOVE ENTRANCE TAPER EA 527.2000 8,435.20 0.000 0 142 REMOVE CULVERT (LF) LF 65.6000 96,432.00 26.700 1,751.52 199.700 13,100 143 REMOVE SLOTTED CORRUGATED STEEL PIPE LF 63.4500 2,855.25 0.000 0 144 REMOVE DOWNDRAIN (EA) EA 1,090.3600 21,807.20 0.000 0 145 REMOVE INLET EA 1,677.7000 62,074.90 1.000 1,677.70 1.000 1,677 146 REMOVE ASPHALT CONCRETE OVERSIDE DRAIN EA 1,091.9600 16,379.40 0.000 0 147 REMOVE FLARED END SECTION (EA) EA 536.5100 17,704.83 2.000 1,073.02 2.000 1,073 148 CAP INLET EA 3,162.3600 31,623.60 7.000 22,136 149 TEMPORARY CAP INLET EA 4,352.0000 17,408.00 0.000 0 150 CLEANING, INSPECTING, AND PREPARING LF 25.0000 25,000.00 0.000 0 CULVERT (LF) 151 SAND BACKFILL CY 616.6300 11,715.97 0.000 0 152 18" CURED-IN-PLACE PIPELINER LF 58.0900 18,588.80 0.000 0 153 24" CURED-IN-PLACE PIPELINER LF 251.0600 150,636.00 0.000 0 154 54" CURED-IN-PLACE PIPELINER LF 1,186.4900 100,851.65 0.000 0 155 REMOVE SLOPE PAVING (SQYD) SQYD 236.2500 14,883.75 0.000 0 156 SLOPE PAVING (CONCRETE) CY 1,880.5900 289,610.86 0.000 0 PROGRAM CAS145 PAGE 7 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 157 ROCK SLOPE PROTECTION (60 LB, CLASS II, CY 200.0000 4,800.00 0.000 0 METHOD B) (CY) 158 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 55.0000 4,400.00 0.000 0 159 MINOR CONCRETE (CURB) (CY) CY 1,100.0000 55,000.00 0.000 0 160 DETECTABLE WARNING SURFACE SQFT 65.0000 29,250.00 0.000 0 161 MINOR CONCRETE (CURB, SIDEWALK AND CURB CY 1,500.0000 126,000.00 0.000 0 RAMP) 162 REMOVE CONCRETE (CURB, GUTTER, AND LF 121.0900 162,260.60 0.000 0 SIDEWALK) (LF) 163 MISCELLANEOUS IRON AND STEEL LB 3.6000 109,767.60 0.000 0 (F) 164 MISCELLANEOUS METAL LB 8.6600 57,909.42 0.000 0 (F) 165 CHAIN LINK FENCE (TYPE CL-4) LF 18.4500 308,115.00 0.000 0 166 REMOVE CHAIN LINK FENCE LF 4.8500 80,995.00 2,158.000 10,466 167 DELINEATOR (CLASS 1) EA 40.4000 14,948.00 0.000 0 168 DELINEATOR (CLASS 1, SURFACE MOUNTED) EA 40.4000 323.20 0.000 0 169 CONCRETE BARRIER DELINEATOR (16-INCH) EA 40.4000 202.00 0.000 0 170 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0500 55,550.00 0.000 0 171 MILEPOST MARKER EA 50.5100 1,515.30 0.000 0 172 MARKER (CULVERT) EA 50.5100 2,373.97 0.000 0 173 TREATMENT BEST MANAGEMENT PRACTICE EA 70.7100 6,717.45 0.000 0 MARKER 174 REMOVE ROADSIDE SIGN EA 101.0100 32,323.20 0.000 0 175 REMOVE ROADSIDE SIGN (STRAP AND SADDLE EA 50.5100 6,566.30 0.000 0 BRACKET METHOD) 176 REMOVE ROADSIDE SIGN PANEL EA 101.0100 1,212.12 0.000 0 177 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 32.4600 347,322.00 0.000 0 178 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 33.7400 41,500.20 0.000 0 179 FURNISH LAMINATED PANEL SIGN (2 SQFT 37.8300 9,835.80 0.000 0 1/2"-TYPE B) 180 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.7300 45,388.80 0.000 0 (0.063"-UNFRAMED) 181 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0500 30,100.00 0.000 0 (0.080"-UNFRAMED) 182 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 42.0700 28,186.90 0.000 0 (0.063"-FRAMED) 183 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 30.9100 32,764.60 0.000 0 (0.080"-FRAMED) PROGRAM CAS145 PAGE 8 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 184 ROADSIDE SIGN - ONE POST EA 303.0300 78,787.80 0.000 0 185 ROADSIDE SIGN - TWO POST EA 454.5500 26,818.45 0.000 0 186 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 101.0100 17,171.70 0.000 0 METHOD) 187 INSTALL SIGN (MAST-ARM HANGER METHOD) EA 252.5300 1,262.65 0.000 0 188 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 19.4800 66,426.80 0.000 0 189 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 101.0100 202.02 0.000 0 POST 190 INSTALL SIGN (FLUSH MOUNTED ON CONCRETE EA 303.0300 3,030.30 0.000 0 SURFACE) 191 INSTALL ROADSIDE SIGN (LAMINATED WOOD EA 1,212.1200 10,909.08 0.000 0 BOX POST) 192 FURNISH LAMINATED WOOD BOX POST (TYPE L) EA 2,727.2700 21,818.16 0.000 0 193 FURNISH LAMINATED WOOD BOX POST (TYPE M) EA 2,525.2500 25,252.50 0.000 0 194 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 33.0200 316,661.80 0.000 0 195 VEGETATION CONTROL (MINOR CONCRETE) SQYD 75.0000 328,500.00 0.000 0 196 SINGLE THRIE BEAM BARRIER LF 53.0300 10,075.70 0.000 0 197 REMOVE SINGLE THRIE BEAM BARRIER LF 8.0000 180,000.00 22,324.000 178,592 198 DOUBLE THRIE BEAM BARRIER LF 90.0500 9,005.00 0.000 0 199 REMOVE DOUBLE THRIE BEAM BARRIER LF 9.0100 100,912.00 87.500 788 200 TRANSITION RAILING (TYPE WB-31) EA 5,803.4800 34,820.88 0.000 0 201 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 2,001.2000 16,009.60 0.000 0 202 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,602.1600 36,021.60 0.000 0 203 SEVERE-DUTY CRASH CUSHION (TYPE EA 100,060.0400 200,120.08 0.000 0 QUADGUARD ELITE M10 WIDE) 204 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 205 CONCRETE BARRIER (TYPE 60MG) LF 92.4900 3,986,319.00 0.000 0 206 CONCRETE BARRIER (TYPE 60MA MODIFIED) LF 147.3600 1,748,721.12 0.000 0 207 CONCRETE BARRIER (TYPE 60MGA MODIFIED) LF 162.4800 2,064,308.40 0.000 0 208 CONCRETE BARRIER (TYPE 842) LF 251.3900 204,631.46 0.000 0 (F) 209 CONCRETE BARRIER (TYPE 842 MODIFIED) LF 177.9500 2,123,299.40 0.000 0 (F) 210 REMOVE GUARDRAIL LF 6.0000 50,340.00 375.000 2,250 PROGRAM CAS145 PAGE 9 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 211 SALVAGE METAL BRIDGE RAILING LF 40.0900 70,317.86 420.000 16,837.80 420.000 16,837 212 SALVAGE GUARDRAIL LF 9.0100 9,010.00 0.000 0 213 REMOVE CONCRETE BARRIER LF 23.0000 529,000.00 1,780.000 40,940.00 3,503.000 80,569 214 REMOVE CRASH CUSHION EA 4,002.4000 4,002.40 0.000 0 215 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 12.1100 123,522.00 0.000 0 WET NIGHT VISIBILITY) 216 PREFORMED THERMOPLASTIC PAVEMENT MARKING SQFT 40.3800 31,900.20 0.000 0 217 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8100 275.40 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 218 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8100 7,338.60 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 219 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8100 170,910.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 220 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8600 229,620.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 221 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.2600 8,845.20 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 222 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0100 9,847.50 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 223 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 8.0800 12,362.40 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 224 12" THERMOPLASTIC TRAFFIC STRIPE LF 8.0800 166,448.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 225 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0100 146,450.00 7,108.000 7,179.08 112,011.000 113,131 226 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 10.0900 3,127.90 0.000 0 227 12" RUMBLE STRIP (CONCRETE PAVEMENT) STA 125.0000 45,000.00 0.000 0 228 12" RUMBLE STRIP (ASPHALT CONCRETE STA 190.0000 41,800.00 0.000 0 PAVEMENT-SINUSOIDAL) 229 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 11,773.0000 11,773.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 230 LOCATING AND MAPPING UNDERGROUND LS 1,500,000.0000 1,500,000.00 0.020 30,000.00 0.368 552,000 FACILITIES 231 LIGHTING SYSTEM LS 80,724.0000 80,724.00 0.000 0 232 SIGN ILLUMINATION SYSTEM LS 94,208.0000 94,208.00 0.000 0 233 RAMP METERING SYSTEM LS 2,115,082.0000 2,115,082.00 0.017 35,956 234 CHANGEABLE MESSAGE SIGN SYSTEM LS 1,145,337.0000 1,145,337.00 0.003 3,436 235 CAMERA SYSTEMS LS 1,860,719.0000 1,860,719.00 0.005 9,303.60 0.053 98,618 PROGRAM CAS145 PAGE 10 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 236 FIBER OPTIC CABLE SYSTEMS LS 7,160,674.0000 7,160,674.00 0.035 250,623.59 0.202 1,446,456 237 MODIFYING ROADWAY WEATHER INFORMATION LS 495,108.0000 495,108.00 0.000 0 SYSTEMS 238 MODIFYING AUTOMATIC VEHICLE LS 674,353.0000 674,353.00 0.000 0 CLASSIFICATION SYSTEM 239 MODIFYING LIGHTING SYSTEMS LS 744,599.0000 744,599.00 0.107 79,672 240 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 269,876.0000 269,876.00 0.000 0 241 MODIFYING RAMP METERING SYSTEMS LS 2,963,888.0000 2,963,888.00 0.019 56,313.87 0.019 56,313 242 MODIFYING TRAFFIC MONITORING STATIONS LS 74,321.0000 74,321.00 0.000 0 243 HIGH SPEED WEIGH-IN-MOTION SYSTEM LS 688,082.0000 688,082.00 0.000 0 244 REMOVING EXTINGUISHABLE MESSAGE SIGN LS 4,069.0000 4,069.00 0.000 0 245 REMOVING SIGN ILLUMINATION SYSTEMS LS 25,902.0000 25,902.00 0.000 0 246 REMOVING RAMP METERING SYSTEMS LS 49,496.0000 49,496.00 0.000 0 247 REMOVING TRAFFIC MONITORING STATIONS LS 10,493.0000 10,493.00 0.000 0 248 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 249 TEMPORARY REINFORCED SILT FENCE LF 21.4700 218,994.00 3,600.000 77,292.00 8,633.000 185,350 250 CONCRETE BARRIER (TYPE 60MC) LF 273.4300 1,285,121.00 0.000 0 PROGRAM CAS145 PAGE 11 DATE 10/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4F6504 TIME 09:35 AM ESTIMATE NO. 005 BID OPENING 01/25/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/23 R.E. NAME: TECLE, DANIEL DATE OF THIS ESTIMATE 10/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 2,637,186.69 12,221,114.06 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 19,579.21 28,781.43 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 2,656,765.90 12,249,895.49 251 MOBILIZATION LS 20,000,000.0000 20,000,000.00 0.500 10,000,000 ORIGINAL CONTRACT AMOUNT 204,804,408.80 TOTAL WORK COMPLETED 2,656,765.90 22,249,895.49 MATERIALS ON HAND ON SITE 403,214.55 403,214.55 DEDUCTIONS -7,000.00 -20,000.00 TOTAL 3,052,980.45 22,633,110.04 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/17/23 505 07/17/23 07/17/23 07/29/25 67 1 0 0 11% 13% PROGRESS IS SATISFACTORY TECLE, DANIEL RESIDENT ENGINEER