PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/02/25 EST. NO. 006 TIME 02:11 PM R.E. NAME: KAUFMAN, RICHARD 03-4J7304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0001 2,145.00 E.W. @ L.S.(+) 032025 N 0001 2,145.00 TOTAL THIS ESTIMATE 4,502.83 TOTAL PREVIOUS ESTIMATE 6,647.83 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/02/25 EST. NO. 006 TIME 02:11 PM R.E. NAME: KAUFMAN, RICHARD 03-4J7304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MSSG CEM-4401 (2024) -10,000.00 005 MSSG CEM-4401 (2025) -10,000.00 005 RTN CEM-4401 2024 10,000.00 006 RTN CEM-4401 2025 10,000.00 006 20,000.00 0.00 EQUAL EMPLOYMENT OPPORTUNITY MSSG CEM-2402 -10,000.00 005 RTN CEM-2402 10,000.00 006 10,000.00 0.00 LABOR COMPLIANCE VIOLATION DEDUCT LTTR 12/24 -2,000.00 002 DEDUCT LTTR 2/25 -3,000.00 003 RTN LTTR 12/24 2,000.00 003 DEDUCT LTTR 3/2025 -1,000.00 004 RTN LTTR 2/25 3,000.00 004 DEDUCT LTTR 4/2025 -5,000.00 005 RTN LTTR 3/2025 1,000.00 005 RTN LTTR 4/2025 5,000.00 006 5,000.00 0.00 TOTAL DEDUCTIONS 35,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 10/02/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4J7304 TIME 02:11 PM ESTIMATE NO. 006 BID OPENING 04/23/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/14/25 R.E. NAME: KAUFMAN, RICHARD DATE OF THIS ESTIMATE 10/02/25 LOCATION SEMI-FINAL ESTIMATE 03-SAC-99-19.7 ------------------- STUDEBAKER ELECTRIC, INC. SACRAMENTO COUNTY NEAR SACRAMENTO AT THE 3237 RIPPEY ROAD, STE 100 FLORIN ROAD NORTHBOUND ONRAMP LOOMIS CA 95650 FED. AID NO. N O N E UPGRADE RAMP METERING SYSTEM. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 6,000.0000 6,000.00 1.000 6,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 3,330.0000 66,600.00 20.000 66,600 003 CONSTRUCTION AREA SIGNS LS 4,200.0000 4,200.00 1.000 4,200 004 TRAFFIC CONTROL SYSTEM LS 96,000.0000 96,000.00 1.000 96,000 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 1,800.0000 1,800.00 1.000 1,800 006 JOB SITE MANAGEMENT LS 1,440.0000 1,440.00 1.000 1,440 007 WATER POLLUTION CONTROL PROGRAM LS 1,200.0000 1,200.00 1.000 1,200 008 TEMPORARY CHECK DAM LF 65.0000 1,950.00 0.000 0 009 TEMPORARY DRAINAGE INLET PROTECTION EA 350.0000 700.00 2.000 700 010 TEMPORARY FIBER ROLL LF 11.0000 1,870.00 85.000 935 011 TEMPORARY CONCRETE WASHOUT LS 600.0000 600.00 1.000 600 012 CLEARING AND GRUBBING (LS) LS 18,000.0000 18,000.00 1.000 18,000 013 ROADWAY EXCAVATION CY 420.0000 12,600.00 30.004 12,601 014 CHECK AND TEST EXISTING IRRIGATION LS 7,800.0000 7,800.00 1.000 7,800 FACILITIES 015 BONDED FIBER MATRIX (SQFT) SQFT 0.3700 2,042.40 5,520.000 2,042 016 CLASS 2 AGGREGATE BASE (CY) CY 600.0000 15,000.00 35.700 21,420 017 HOT MIX ASPHALT (TYPE A) TON 1,140.0000 25,080.00 22.460 25,604 018 TACK COAT TON 300.0000 30.00 0.100 30 019 REMOVE ROADSIDE SIGN EA 102.0000 408.00 4.000 408 020 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 34.0000 1,938.00 57.000 1,938 (0.063"-UNFRAMED) 021 ROADSIDE SIGN - ONE POST EA 740.0000 1,480.00 2.000 1,480 022 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 162.0000 486.00 3.000 486 METHOD) PROGRAM CAS145 PAGE 2 DATE 10/02/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4J7304 TIME 02:11 PM ESTIMATE NO. 006 BID OPENING 04/23/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/14/25 R.E. NAME: KAUFMAN, RICHARD DATE OF THIS ESTIMATE 10/02/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 92.0000 12,880.00 2.500 230.00 140.000 12,880 024 VEGETATION CONTROL (MINOR CONCRETE) SQYD 235.0000 23,500.00 100.000 23,500 025 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 3,378.0000 3,378.00 1.000 3,378 026 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,664.0000 5,664.00 1.000 5,664 027 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 300.0000 9,000.00 0.000 0 WET NIGHT VISIBILITY) 028 REMOVE PAVEMENT MARKING (HIGH-PRESSURE SQFT 354.0000 5,310.00 0.000 0 WATER BLASTING) 029 MODIFYING RAMP METERING SYSTEMS LS 309,000.0000 309,000.00 1.000 309,000 PROGRAM CAS145 PAGE 3 DATE 10/02/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4J7304 TIME 02:11 PM ESTIMATE NO. 006 BID OPENING 04/23/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/14/25 R.E. NAME: KAUFMAN, RICHARD DATE OF THIS ESTIMATE 10/02/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 230.00 625,707.48 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 2,145.00 6,647.83 SUBTOTAL AMOUNT EARNED 2,375.00 632,355.31 ORIGINAL CONTRACT AMOUNT 635,956.40 TOTAL WORK COMPLETED 2,375.00 632,355.31 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 35,000.00 0.00 TOTAL 37,375.00 632,355.31 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/18/24 20 11/04/24 11/04/24 04/14/25 16 98 0 0 100% 100% KAUFMAN, RICHARD RESIDENT ENGINEER