PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/13/14 EST. NO.07 TIME 12:48 PM R.E. NAME: STEINER, BRIAN 03-4M4804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/13/14 EST. NO.07 TIME 12:48 PM R.E. NAME: STEINER, BRIAN 03-4M4804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- EQUAL EMPLOYMENT OPPORTUNITY MISSING CEM2402S -10,000.00 05 RECEIVED CEM2402S 10,000.00 06 0.00 0.00 LABOR COMPLIANCE VIOLATION PER LTR DATED 7/13 -2,000.00 02 RETURN DEDUCT 7/13 2,000.00 03 PER LTR DATED 10/13 -5,000.00 04 RETURN DEDUCT 10/13 5,000.00 05 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 01/13/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4M4804 TIME 12:48 PM ESTIMATE NO. 07 BID OPENING 02/06/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/28/13 R.E. NAME: STEINER, BRIAN DATE OF THIS ESTIMATE 01/13/14 LOCATION FINAL ESTIMATE 03-COL-5-0.0/R34.4 -------------- AMERICAN CIVIL CONSTRUCTORS IN COLUSA AND GLENN COUNTIES AT WEST COAST INC VARIOUS LOCATIONS 3701 MALLARD DRIVE BENICIA CA 94510 FED. AID NO. N O N E METHACRYLATE AND POLYESTER BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500 002 CONSTRUCTION AREA SIGNS LS 8,800.0000 8,800.00 1.000 8,800 003 TRAFFIC CONTROL SYSTEM LS 103,000.0000 103,000.00 1.000 103,000 004 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 2,500.0000 5,000.00 2.000 5,000 005 JOB SITE MANAGEMENT LS 200.0000 200.00 1.000 200 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 800.0000 800.00 1.000 800 007 TEMPORARY CONCRETE WASHOUT LS 2,000.0000 2,000.00 1.000 2,000 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.0000 4,200.00 4,500.000 4,500 STRIPE (HAZARDOUS WASTE) 009 RAPID SETTING CONCRETE (PATCH) CF 10.0000 460.00 0.000 0 010 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 3,140.00 3,140.000 3,140 011 REMOVE ASPHALT CONCRETE SURFACING SQFT 1.5000 29,286.00 13,824.000 20,736 012 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 8.5000 65,960.00 6,893.000 58,590 013 REMOVE UNSOUND CONCRETE CF 80.0000 3,680.00 0.000 0 014 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1700 12,662.28 68,784.000 11,693 015 FURNISH POLYESTER CONCRETE OVERLAY CF 85.0000 288,660.00 2,723.790 231,522 016 PLACE POLYESTER CONCRETE OVERLAY SQFT 1.8000 81,496.80 36,576.000 65,836 (F) 017 TREAT BRIDGE DECK SQFT 0.4000 11,683.20 29,208.000 11,683 (F) 018 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 60.0000 19,380.00 351.000 21,060 019 REMOVE SLURRY SEAL SQFT 0.9000 15,774.30 15,056.000 13,550 020 HOT MIX ASPHALT (TYPE A) TON 200.0000 202,000.00 889.020 177,804 021 TACK COAT TON 700.0000 1,190.00 1.520 1,064 022 CLEAN EXPANSION JOINT LF 11.0000 8,492.00 690.000 7,590 PROGRAM CAS145 PAGE 2 DATE 01/13/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4M4804 TIME 12:48 PM ESTIMATE NO. 07 BID OPENING 02/06/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/28/13 R.E. NAME: STEINER, BRIAN DATE OF THIS ESTIMATE 01/13/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 JOINT SEAL (MR 1/2") LF 15.0000 9,150.00 610.000 9,150 024 JOINT SEAL (MR 1") LF 25.0000 4,050.00 80.000 2,000 025 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 9,190.00 8,024.000 8,024 026 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 2,940.00 2,275.000 2,275 (BROKEN 36-12) 027 PAVEMENT MARKER (RETROREFLECTIVE) EA 9.0000 3,510.00 281.000 2,529 PROGRAM CAS145 PAGE 3 DATE 01/13/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-4M4804 TIME 12:48 PM ESTIMATE NO. 07 BID OPENING 02/06/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/28/13 R.E. NAME: STEINER, BRIAN DATE OF THIS ESTIMATE 01/13/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 775,048.33 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 78,456.82 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 853,505.15 028 MOBILIZATION LS 98,000.0000 98,000.00 1.000 98,000 ORIGINAL CONTRACT AMOUNT 997,204.58 TOTAL WORK COMPLETED 0.00 951,505.15 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 0.00 951,505.15 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/04/13 95 05/28/13 04/19/13 10/28/13 102 31 7 0 100% 100% STEINER, BRIAN RESIDENT ENGINEER PROGRAM CAS145 DATE 01/13/14