PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/21/13 EST. NO.01 TIME 08:47 AM R.E. NAME: AHMADZADEH, ALI 04-003944 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/21/13 EST. NO.01 TIME 08:47 AM R.E. NAME: AHMADZADEH, ALI 04-003944 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/21/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-003944 TIME 08:47 AM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: AHMADZADEH, ALI DATE OF THIS ESTIMATE 03/21/13 LOCATION RERUN PROGRESS ESTIMATE 04-CC-580-6.1/6.3 ----------------------- WEST BAY BUILDERS, INC. IN CONTRA COSTA COUNTY IN RICHMOND 250 BEL MARIN KEYS BLVD BLDG AT RICHMOND-SAN RAFAEL BRIDGE NOVATO, CA 94949 MAINTENANCE STATION FED. AID NO. N O N E REPLACE MAINTENANCE BUILDINGS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 8,200.0000 8,200.00 0.000 0 002 CONSTRUCTION SITE MANAGEMENT LS 11,400.0000 11,400.00 0.000 0 003 PREPARE WATER POLLUTION CONTROL LS 16,300.0000 16,300.00 0.500 8,150.00 0.500 8,150 PROGRAM 004 HEALTH AND SAFETY PLAN LS 3,800.0000 3,800.00 0.750 2,850.00 0.750 2,850 005 TEMPORARY FIBER ROLL LF 2.7000 1,350.00 0.000 0 006 TEMPORARY SILT FENCE LF 5.0000 2,500.00 0.000 0 007 TEMPORARY COVER SQYD 5.5000 550.00 0.000 0 008 TEMPORARY CHECK DAM LF 5.4000 1,080.00 0.000 0 009 TEMPORARY DRAINAGE INLET PROTECTION EA 220.0000 880.00 0.000 0 010 TEMPORARY HYDRAULIC MULCH SQYD 7.6000 7,600.00 0.000 0 (BONDED FIBER MATRIX) 011 STREET SWEEPING LS 17,000.0000 17,000.00 0.000 0 012 TEMPORARY CONCRETE WASHOUT BIN EA 3,250.0000 6,500.00 0.000 0 013 CONSTRUCTION AREA SIGNS LS 2,800.0000 2,800.00 0.000 0 014 TRAFFIC CONTROL SYSTEM LS 73,500.0000 73,500.00 0.000 0 015 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 8,800.0000 8,800.00 0.000 0 016 REMOVE CHAIN LINK FENCE LF 3.0000 2,010.00 0.000 0 017 REMOVE CULVERT (LF) LF 36.0000 1,332.00 0.000 0 018 REMOVE INLET EA 650.0000 1,300.00 0.000 0 019 REMOVE CONCRETE CURB (LF) LF 7.0000 1,470.00 0.000 0 020 ROADWAY EXCAVATION CY 88.0000 18,480.00 0.000 0 021 ROADWAY EXCAVATION (CLASS II) CY 114.0000 80,940.00 0.000 0 022 ROADWAY EXCAVATION (TYPE H) CY 225.0000 8,775.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 03/21/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-003944 TIME 08:47 AM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: AHMADZADEH, ALI DATE OF THIS ESTIMATE 03/21/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 SUBGRADE ENHANCEMENT GEOTEXTILE, SQYD 12.0000 13,440.00 0.000 0 CLASS B1 024 HIGHWAY PLANTING LS 10,300.0000 10,300.00 0.000 0 025 MAINTAIN EXISTING PLANTED AREAS LS 6,050.0000 6,050.00 0.000 0 026 PLANT ESTABLISHMENT WORK LS 8,650.0000 8,650.00 0.000 0 027 IRRIGATION SYSTEM LS 22,700.0000 22,700.00 0.000 0 028 IRRIGATION SLEEVE LF 82.0000 1,640.00 0.000 0 029 CLASS 3 AGGREGATE BASE (CY) CY 45.0000 32,400.00 0.000 0 030 MINOR HOT MIX ASPHALT TON 225.0000 90,000.00 0.000 0 031 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 25.0000 6,000.00 0.000 0 032 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 25.0000 1,950.00 0.000 0 033 PLACE HOT MIX ASPHALT SQYD 80.0000 1,280.00 0.000 0 (MISCELLANEOUS AREA) 034 LIQUID ASPHALT (PRIME COAT) TON 1,650.0000 2,640.00 0.000 0 035 MINOR CONCRETE (BACKFILL) CY 214.0000 2,568.00 0.000 0 036 8" DUCTILE IRON PIPE LF 163.0000 10,758.00 0.000 0 037 12" ALTERNATIVE PIPE CULVERT LF 218.0000 8,938.00 0.000 0 038 MINOR CONCRETE (CURB) (CY) CY 609.0000 9,135.00 0.000 0 039 MINOR CONCRETE (MISCELLANEOUS CY 1,203.0000 4,571.40 0.000 0 CONSTRUCTION) 040 MISCELLANEOUS IRON AND STEEL LB 2.7500 2,629.00 0.000 0 (F) 041 SECURITY METAL FENCE LF 108.0000 66,960.00 0.000 0 042 SECURITY METAL GATE LF 250.0000 17,500.00 0.000 0 043 BUILDING WORK LS 3,570,000.0000 3,570,000.00 0.017 60,690.00 0.017 60,690 PROGRAM CAS145 PAGE 3 DATE 03/21/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-003944 TIME 08:47 AM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: AHMADZADEH, ALI DATE OF THIS ESTIMATE 03/21/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 71,690.00 71,690.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 71,690.00 71,690.00 ORIGINAL CONTRACT AMOUNT 4,166,676.40 TOTAL WORK COMPLETED 71,690.00 71,690.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 71,690.00 71,690.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/13/13 600 02/28/13 03/25/13 07/27/15 15 0 0 0 2% 3% PROGRESS IS SATISFACTORY AHMADZADEH, ALI RESIDENT ENGINEER PROGRAM CAS145 DATE 03/21/13