PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/18/06 EST. NO.04 TIME 09:58 AM R.E. NAME: NIM PATEL 04-0A2304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0001 1,366.97 E.W. @ F.A.(+) 050906 N 189034 0002 2,834.51 032706 N 189035 0003 2,439.21 032906 N 189036 0004 2,273.52 050106 N 192729 8,914.21 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 8,914.21 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/18/06 EST. NO.04 TIME 09:58 AM R.E. NAME: NIM PATEL 04-0A2304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/18/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0A2304 TIME 09:58 AM ESTIMATE NO. 04 BID OPENING 12/14/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: NIM PATEL DATE OF THIS ESTIMATE 08/18/06 LOCATION PROGRESS ESTIMATE 04-SCL-85-R22.0/R22.3 ----------------- 04-SCL-101-46.8/50.4 M BUMGARNER INC IN SANTA CLARA COUNTY IN MOUNTAIN 1175 GREENVILLE ROAD VIEW AND PALO ALTO AT VARIOUS LIVERMORE CA 94550 LOCATIONS FED. AID NO. N O N E REMOVE AND REPLACE OVERHEAD SIGNS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,125.0000 1,125.00 0.500 562.50 PROGRAM 02 WATER POLLUTION CONTROL LS 4,000.0000 4,000.00 0.000 0.00 03 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 2,000.0000 2,000.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.700 10,500.00 S) 05 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.000 0.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 3,000.0000 3,000.00 0.000 0.00 S) 07 REMOVE SIGN STRUCTURE EA 8,000.0000 48,000.00 0.000 0.00 08 REMOVE CRASH CUSHION (SAND FILLED) EA 80.0000 8,800.00 0.000 0.00 09 CLEARING AND GRUBBING LS 6,000.0000 6,000.00 0.150 900.00 0.150 900.00 10 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 1.000 4,000.00 11 FURNISH SIGN STRUCTURE (BRIDGE MOUNTED KG 11.0000 63,899.00 0.000 0.00 F) WITH WALKWAY) 12 INSTALL SIGN STRUCTURE (BRIDGE MOUNTED KG 9.0000 52,281.00 0.000 0.00 F) WITH WALKWAY) 13 FURNISH SIGN STRUCTURE (TRUSS) KG 8.3000 514,185.00 0.000 0.00 F) 14 INSTALL SIGN STRUCTURE (TRUSS) KG 0.3000 18,585.00 0.000 0.00 F) 15 FURNISH FORMED PANEL SIGN (OVERHEAD) M2 200.0000 40,000.00 0.000 0.00 S) 16 FURNISH LAMINATED PANEL SIGN M2 220.0000 13,200.00 0.000 0.00 S) (25.4 MM-TYPE A) 17 FURNISH SINGLE SHEET ALUMINUM SIGN M2 100.0000 1,200.00 0.000 0.00 S) (2.0 MM-UNFRAMED) 18 1524 MM CAST-IN-DRILLED-HOLE M 5,600.0000 257,600.00 0.000 0.00 CONCRETE PILE (SIGN FOUNDATION) 19 ROADSIDE SIGN - ONE POST EA 350.0000 2,100.00 0.000 0.00 20 450 MM ALTERNATIVE PIPE CULVERT M 1,500.0000 18,000.00 12.000 18,000.00 12.000 18,000.00 21 450 MM ALTERNATIVE FLARED END SECTION EA 200.0000 400.00 2.000 400.00 2.000 400.00 22 GUARD RAILING DELINEATOR EA 20.0000 360.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 08/18/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0A2304 TIME 09:58 AM ESTIMATE NO. 04 BID OPENING 12/14/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: NIM PATEL DATE OF THIS ESTIMATE 08/18/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 OBJECT MARKER (TYPE L-1) EA 50.0000 300.00 0.000 0.00 24 METAL BEAM GUARD RAILING (WOOD POST) M 90.0000 7,560.00 0.000 0.00 25 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,000.0000 6,000.00 0.000 0.00 26 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,500.0000 15,000.00 0.000 0.00 27 MODIFY LIGHTING AND SIGN ILLUMINATION LS 45,000.0000 45,000.00 0.500 22,500.00 (LOCATION A & B) 28 MODIFY LIGHTING AND SIGN ILLUMINATION LS 48,000.0000 48,000.00 0.600 28,800.00 (LOCATION C & D) 29 MODIFY LIGHTING AND SIGN ILLUMINATION LS 23,000.0000 23,000.00 0.000 0.00 (LOCATION E) 30 MODIFY LIGHTING AND SIGN ILLUMINATION LS 21,000.0000 21,000.00 0.600 12,600.00 (LOCATION F) PROGRAM CAS145 PAGE 3 DATE 08/18/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0A2304 TIME 09:58 AM ESTIMATE NO. 04 BID OPENING 12/14/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: NIM PATEL DATE OF THIS ESTIMATE 08/18/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 19,300.00 98,262.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 8,914.21 8,914.21 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 28,214.21 107,176.71 31 MOBILIZATION LS 45,000.0000 45,000.00 0.500 22,500.00 ORIGINAL CONTRACT AMOUNT 1,334,595.00 TOTAL WORK COMPLETED 28,214.21 129,676.71 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 28,214.21 129,676.71 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/19/06 200 03/06/06 02/03/06 12/29/06 109 26 0 0 9% 54% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDDEN AND PCNT TIME ELAPSED INPUT BECAUSE CCO DAYS PENDING NIM PATEL RESIDENT ENGINEER PROGRAM CAS145 DATE 08/18/06