PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/21/07 EST. NO.02 TIME 07:31 AM R.E. NAME: CHANGIZI, DAVE 04-0C7904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0009 82.62 E.W. @ F.A.(+) 073107 N 0010.0 82.62 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 82.62 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/21/07 EST. NO.02 TIME 07:31 AM R.E. NAME: CHANGIZI, DAVE 04-0C7904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 001 -568.50 01 OVERBID ITEM NO. 001 -568.50 02 -568.50 -1,137.00 TOTAL DEDUCTIONS -568.50 -1,137.00 PROGRAM CAS145 PAGE 1 DATE 08/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0C7904 TIME 07:31 AM ESTIMATE NO. 02 BID OPENING 04/17/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: CHANGIZI, DAVE DATE OF THIS ESTIMATE 08/21/07 LOCATION PROGRESS ESTIMATE 04-SOL-12-L1.8/7.9 ----------------- EVEQARDO ARELLANO IN SOLANO COUNTY IN FAIRFIELD AND 246 GHILOTTI AVENUE SUISUN CITY FROM THE JUNCTION OF SANTA ROSA, CA 95407 ROUTE 80 TO 1.0 KM WEST OF UNION CREEK FED. AID NO. ACST-P012(96)E ,P-P012(96)E RESURFACE ASPHALT CONCRETE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 7,000.0000 7,000.00 0.100 700.00 0.200 1,400.00 02 TIME-RELATED OVERHEAD WDAY 500.0000 47,500.00 21.000 10,500.00 41.000 20,500.00 03 PREPARE STORM WATER POLLUTION LS 3,200.0000 3,200.00 0.750 2,400.00 PREVENTION PLAN 04 WATER POLLUTION CONTROL LS 5,000.0000 5,000.00 0.200 1,000.00 0.400 2,000.00 05 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.500 2,500.00 S) 06 TRAFFIC CONTROL SYSTEM LS 30,000.0000 30,000.00 0.200 6,000.00 0.400 12,000.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN EA 7,000.0000 14,000.00 0.400 2,800.00 0.800 5,600.00 S) 08 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 39.0000 19,110.00 829.100 32,334.90 09 REMOVE PAVEMENT MARKER EA 1.0000 1,270.00 600.000 600.00 1,000.000 1,000.00 10 REMOVE ASPHALT CONCRETE DIKE M 11.0000 27,060.00 1,000.000 11,000.00 2,400.000 26,400.00 11 REMOVE OVERSIDE DRAIN EA 200.0000 5,400.00 0.000 0.00 12 RECONSTRUCT METAL BEAM GUARD RAILING M 89.0000 32,040.00 0.000 0.00 S) 13 ADJUST UTILITY COVER TO GRADE EA 525.0000 9,975.00 5.000 2,625.00 5.000 2,625.00 14 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.1000 315,000.00 50,273.000 105,573.30 141,513.000 297,177.30 15 LEAD COMPLIANCE PLAN LS 2,200.0000 2,200.00 0.250 550.00 1.000 2,200.00 16 IMPORTED MATERIAL (SHOULDER BACKING) TONN 26.0000 29,380.00 0.000 0.00 17 REPLACE ASPHALT CONCRETE SURFACING M3 340.0000 238,000.00 798.030 271,330.20 18 ASPHALT CONCRETE (TYPE A) TONN 82.0000 363,260.00 454.200 37,244.40 4,894.200 401,324.40 19 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 99.0000 3,009,600.00 14,114.900 1,397,375.10 14,114.900 1,397,375.10 20 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 95.0000 10,450.00 0.000 0.00 AREA) 21 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 7.7500 294.50 0.000 0.00 22 PLACE ASPHALT CONCRETE DIKE (TYPE D) M 7.7500 18,677.50 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 08/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0C7904 TIME 07:31 AM ESTIMATE NO. 02 BID OPENING 04/17/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: CHANGIZI, DAVE DATE OF THIS ESTIMATE 08/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 7.7500 155.00 0.000 0.00 24 ASPHALTIC EMULSION (PAINT BINDER) TONN 540.0000 108,000.00 40.730 21,994.20 40.730 21,994.20 25 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,225.0000 35,600.00 0.000 0.00 S) 26 THERMOPLASTIC PAVEMENT MARKING M2 52.0000 57,720.00 0.000 0.00 S) 27 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 72,450.00 0.000 0.00 S) 28 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.7500 8,207.50 0.000 0.00 S) 29 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.2000 1,164.00 0.000 0.00 S) (BROKEN 3.66 M - 0.92 M) 30 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.2000 12,600.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 31 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.2000 300.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 32 PAVEMENT MARKER (NON-REFLECTIVE) EA 5.0000 12,950.00 0.000 0.00 S) 33 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.0000 29,610.00 0.000 0.00 S) 34 INDUCTIVE LOOP DETECTOR (REPLACE) LS 167,400.0000 167,400.00 0.100 16,740.00 S) PROGRAM CAS145 PAGE 3 DATE 08/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0C7904 TIME 07:31 AM ESTIMATE NO. 02 BID OPENING 04/17/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: CHANGIZI, DAVE DATE OF THIS ESTIMATE 08/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,597,962.00 2,516,901.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 82.62 82.62 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,598,044.62 2,516,983.72 35 MOBILIZATION LS 73,400.0000 73,400.00 0.250 18,350.00 1.000 73,400.00 ORIGINAL CONTRACT AMOUNT 4,772,973.50 TOTAL WORK COMPLETED 1,616,394.62 2,590,383.72 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -568.50 -1,137.00 TOTAL 1,615,826.12 2,589,246.72 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) 1,315.00 7,000.00 5,685.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/06/07 95 06/21/07 00/00/00 11/12/07 41 0 0 0 53% 43% PROGRESS IS SATISFACTORY CHANGIZI, DAVE RESIDENT ENGINEER PROGRAM CAS145 DATE 08/21/07