PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/20/06 EST. NO.01 TIME 09:24 AM R.E. NAME: MANGLO PERPETUO 04-0C8304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/20/06 EST. NO.01 TIME 09:24 AM R.E. NAME: MANGLO PERPETUO 04-0C8304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/20/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0C8304 TIME 09:24 AM ESTIMATE NO. 01 BID OPENING 09/27/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: MANGLO PERPETUO DATE OF THIS ESTIMATE 12/20/06 LOCATION PROGRESS ESTIMATE 04-SOL-505-R0.0/R10.6 ----------------- TEICHERT CONSTRUCTION IN SOLANO COUNTY IN VACAVILLE FROM 24207 COUNTY ROAD 100A 505 AND 80 SEPARATION TO THE YOLO DAVIS, CA 95626-9410 COUNTY LINE FED. AID NO. N O N E RESURFACE ASPHALT CONCRETE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 4,000.0000 4,000.00 0.250 1,000.00 0.250 1,000.00 02 TIME-RELATED OVERHEAD WDAY 950.0000 171,000.00 13.000 12,350.00 13.000 12,350.00 03 PREPARE STORM WATER POLLUTION LS 5,000.0000 5,000.00 0.750 3,750.00 0.750 3,750.00 PREVENTION PLAN 04 WATER POLLUTION CONTROL LS 26,000.0000 26,000.00 0.000 0.00 05 TEMPORARY CONCRETE WASHOUT FACILITY EA 550.0000 5,500.00 4.000 2,200.00 4.000 2,200.00 06 TEMPORARY CONSTRUCTION ENTRANCE EA 3,000.0000 3,000.00 1.000 3,000.00 1.000 3,000.00 07 TEMPORARY DRAINAGE INLET PROTECTION EA 600.0000 3,600.00 0.000 0.00 08 CONSTRUCTION AREA SIGNS LS 21,000.0000 21,000.00 0.750 15,750.00 0.750 15,750.00 S) 09 TRAFFIC CONTROL SYSTEM LS 288,817.0000 288,817.00 0.017 4,909.89 0.017 4,909.89 S) 10 PORTABLE CHANGEABLE MESSAGE SIGN EA 13,000.0000 52,000.00 0.000 0.00 S) 11 REMOVE PAVEMENT MARKER EA 0.5000 7,050.00 0.000 0.00 12 REMOVE ASPHALT CONCRETE DIKE M 4.0000 25,960.00 0.000 0.00 13 REMOVE CONCRETE PAVEMENT M3 250.0000 45,000.00 0.000 0.00 14 RECONSTRUCT METAL BEAM GUARD RAILING M 53.0000 62,540.00 0.000 0.00 (WOOD POST) 15 ADJUST FRAME AND GRATE TO GRADE EA 750.0000 4,500.00 0.000 0.00 16 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 4.0000 130,000.00 0.000 0.00 (60 MM MAXIMUM) 17 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000.00 18 IMPORTED MATERIAL (SHOULDER BACKING) M3 72.0000 277,200.00 0.000 0.00 19 AGGREGATE BASE (APPROACH SLAB) M3 660.0000 5,940.00 5.000 3,300.00 5.000 3,300.00 20 REPLACE ASPHALT CONCRETE SURFACING M3 300.0000 513,000.00 0.000 0.00 21 ASPHALT CONCRETE (TYPE A) TONN 140.0000 117,600.00 0.000 0.00 22 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 79.0000 6,904,600.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 12/20/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0C8304 TIME 09:24 AM ESTIMATE NO. 01 BID OPENING 09/27/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: MANGLO PERPETUO DATE OF THIS ESTIMATE 12/20/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 5.0000 32,450.00 0.000 0.00 24 SHOULDER RUMBLE STRIP M 1.0000 62,400.00 0.000 0.00 25 ASPHALTIC EMULSION (PAINT BINDER) TONN 510.0000 239,700.00 0.000 0.00 26 REPLACE CONCRETE PAVEMENT M3 800.0000 1,768,000.00 0.000 0.00 (RAPID STRENGTH CONCRETE) 27 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,800.0000 147,600.00 60.000 108,000.00 60.000 108,000.00 (TYPE R) 28 PAVING NOTCH EXTENSION M3 8,400.0000 25,200.00 1.000 8,400.00 1.000 8,400.00 29 JOINT SEAL (MR 30 MM) M 160.0000 33,600.00 0.000 0.00 30 THERMOPLASTIC PAVEMENT MARKING M2 50.0000 5,500.00 0.000 0.00 S) 31 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 106,950.00 0.000 0.00 S) 32 200 MM THERMOPLASTIC TRAFFIC STRIPE M 3.1000 5,487.00 0.000 0.00 S) 33 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 560.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 34 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.1000 18,606.00 0.000 0.00 S) 35 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 20,640.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 12/20/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0C8304 TIME 09:24 AM ESTIMATE NO. 01 BID OPENING 09/27/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: MANGLO PERPETUO DATE OF THIS ESTIMATE 12/20/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 167,659.89 167,659.89 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 167,659.89 167,659.89 36 MOBILIZATION LS 1250,000.0000 1,250,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 12,395,000.00 TOTAL WORK COMPLETED 167,659.89 167,659.89 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 167,659.89 167,659.89 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 036 MOBILIZATION 1,239,500.00 1,250,000.00 10,500.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/20/06 180 11/27/06 11/06/06 12/12/07 13 18 0 0 1% 7% PROGRESS IS SATISFACTORY MANGLO PERPETUO RESIDENT ENGINEER PROGRAM CAS145 DATE 12/20/06