PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/21/08 EST. NO.01 TIME 03:08 PM R.E. NAME: 04-0E4204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/21/08 EST. NO.01 TIME 03:08 PM R.E. NAME: 04-0E4204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0E4204 TIME 03:08 PM ESTIMATE NO. 01 BID OPENING 01/23/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: DATE OF THIS ESTIMATE 04/21/08 LOCATION PROGRESS ESTIMATE 04-SCL-152-0.0/6.1 ----------------- MIKE CROZE IN SANTA CLARA COUNTY NEAR GILROY DE SILVA GATES CONSTRUCTION FROM 0.2 MILE EAST OF SANTA CRUZ 12 NORTH SUNSET AVE. COUNTY LINE TO BODFISH CREEK BRIDGE SAN JOSE, CA 95116 FED. AID NO. N O N E ASPHALT CONCRETE SURFACING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 1,000.0000 1,000.00 0.000 0.00 02 PREPARE STORM WATER POLLUTION LS 1,000.0000 1,000.00 0.750 750.00 0.750 750.00 PREVENTION PLAN 03 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 500.00 0.000 0.00 04 STREET SWEEPING LS 10,000.0000 10,000.00 0.000 0.00 05 CONSTRUCTION AREA SIGNS LS 2,000.0000 2,000.00 0.750 1,500.00 0.750 1,500.00 S) 06 TRAFFIC CONTROL SYSTEM LS 182,000.0000 182,000.00 0.000 0.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN EA 2,000.0000 4,000.00 0.000 0.00 S) 08 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.3000 18,570.00 0.000 0.00 STRIPE 09 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 19,320.00 0.000 0.00 10 REMOVE PAVEMENT MARKER EA 1.0000 2,620.00 0.000 0.00 11 REMOVE ASPHALT CONCRETE DIKE LF 2.0000 6,640.00 0.000 0.00 12 ADJUST FRAME AND GRATE TO GRADE EA 1,000.0000 1,000.00 0.000 0.00 13 ADJUST METAL BEAM GUARD RAILING LF 7.0000 15,120.00 0.000 0.00 14 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 5.0000 6,450.00 0.000 0.00 15 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 0.500 500.00 0.500 500.00 16 IMPORTED MATERIAL (SHOULDER BACKING) TON 40.0000 18,800.00 0.000 0.00 17 SEAL RANDOM CRACKS LNMI 3,700.0000 44,400.00 0.000 0.00 18 REPLACE ASPHALT CONCRETE SURFACING CY 320.0000 28,800.00 0.000 0.00 19 ASPHALT CONCRETE (TYPE A) TON 100.0000 19,000.00 0.000 0.00 20 ASPHALT CONCRETE (OPEN GRADED) TON 95.0000 703,000.00 0.000 0.00 21 PLACE ASPHALT CONCRETE DIKE (TYPE A) LF 1.0000 870.00 0.000 0.00 22 PLACE ASPHALT CONCRETE DIKE (TYPE C) LF 1.0000 50.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 04/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0E4204 TIME 03:08 PM ESTIMATE NO. 01 BID OPENING 01/23/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: DATE OF THIS ESTIMATE 04/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLACE ASPHALT CONCRETE DIKE (TYPE D) LF 1.0000 2,410.00 0.000 0.00 24 CENTERLINE RUMBLE STRIP STA 30.0000 9,300.00 0.000 0.00 (AC, GROUND-IN-INDENTATIONS) 25 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 31,500.00 0.000 0.00 S) 26 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 33.00 0.000 0.00 S) (BROKEN 12-3) 27 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 275.00 0.000 0.00 S) (BROKEN 36-12) 28 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 275.00 0.000 0.00 S) (BROKEN 17-7) 29 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.5000 19,100.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 04/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0E4204 TIME 03:08 PM ESTIMATE NO. 01 BID OPENING 01/23/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: DATE OF THIS ESTIMATE 04/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 2,750.00 2,750.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 2,750.00 2,750.00 ORIGINAL CONTRACT AMOUNT 1,149,033.00 TOTAL WORK COMPLETED 2,750.00 2,750.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 2,750.00 2,750.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/27/08 40 03/24/08 04/28/08 06/30/08 0 19 0 0 0% 0% PROGRESS IS SATISFACTORY RESIDENT ENGINEER PROGRAM CAS145 DATE 04/21/08