PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/21/10 EST. NO.02 TIME 09:35 AM R.E. NAME: ASHGAR, REZAEI 04-0G1504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/21/10 EST. NO.02 TIME 09:35 AM R.E. NAME: ASHGAR, REZAEI 04-0G1504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/21/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0G1504 TIME 09:35 AM ESTIMATE NO. 02 BID OPENING 05/11/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/10 R.E. NAME: ASHGAR, REZAEI DATE OF THIS ESTIMATE 09/21/10 LOCATION PROGRESS ESTIMATE 04-CC-4-R17.0/R17.8 ----------------- CIMARRON, INC IN CONTRA COSTA COUNTY NEAR CONCORD 10554 RODDEN ROAD FROM 0.1 MILE TO 0.9 MILE EAST OF OAKDALE, CA 95361 WILLOW PASS ROAD UNDERCROSSING FED. AID NO. N O N E REPLACE CULVERTS AND UNDERDRAINS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 250.00 0.000 0.00 02 TEMPORARY FENCE (TYPE ESA) LF 4.0000 8,560.00 1,498.000 5,992.00 03 CONSTRUCTION SITE MANAGEMENT LS 1,000.0000 1,000.00 0.200 200.00 04 PREPARE WATER POLLUTION CONTROL LS 800.0000 800.00 1.000 800.00 PROGRAM 05 TEMPORARY CHECK DAM LF 10.0000 480.00 0.000 0.00 06 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 2,400.00 0.000 0.00 07 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 2,000.0000 2,000.00 0.000 0.00 08 CONSTRUCTION AREA SIGNS LS 1,900.0000 1,900.00 0.700 1,330.00 09 TRAFFIC CONTROL SYSTEM LS 30,000.0000 30,000.00 0.150 4,500.00 0.300 9,000.00 10 PORTABLE CHANGEABLE MESSAGE SIGN LS 6,000.0000 6,000.00 0.150 900.00 0.300 1,800.00 11 REMOVE METAL BEAM GUARD RAILING LF 25.0000 1,875.00 0.000 0.00 12 REMOVE TRAFFIC STRIPE LF 1.2500 2,637.50 0.000 0.00 13 REMOVE ASPHALT CONCRETE DIKE LF 1.7500 3,692.50 1,500.000 2,625.00 1,500.000 2,625.00 14 REMOVE PIPE LF 25.0000 52,500.00 180.000 4,500.00 180.000 4,500.00 15 REMOVE INLET EA 800.0000 8,000.00 0.000 0.00 16 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.0000 6,960.00 666.700 2,666.80 666.700 2,666.80 17 ROADWAY EXCAVATION CY 100.0000 8,000.00 80.000 8,000.00 80.000 8,000.00 18 EROSION CONTROL (COMPOST BLANKET) CY 300.0000 6,000.00 0.000 0.00 19 HOT MIX ASPHALT (TYPE A) TON 125.0000 120,000.00 0.000 0.00 20 PLACE HOT MIX ASPHALT DIKE LF 1.6000 3,376.00 0.000 0.00 21 LIQUID ASPHALT (PRIME COAT) TON 1,000.0000 600.00 0.000 0.00 22 ASPHALTIC EMULSION (PAINT BINDER) TON 1,500.0000 1,050.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 09/21/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0G1504 TIME 09:35 AM ESTIMATE NO. 02 BID OPENING 05/11/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/10 R.E. NAME: ASHGAR, REZAEI DATE OF THIS ESTIMATE 09/21/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MINOR CONCRETE (MINOR STRUCTURE) CY 800.0000 37,440.00 0.000 0.00 F) 24 MINOR CONCRETE (BACKFILL) CY 150.0000 66,000.00 27.000 4,050.00 27.000 4,050.00 25 27" PLASTIC PIPE LF 48.0000 100,800.00 180.000 8,640.00 180.000 8,640.00 26 8" PERFORATED PLASTIC PIPE UNDERDRAIN LF 20.0000 38,200.00 180.000 3,600.00 180.000 3,600.00 27 MISCELLANEOUS IRON AND STEEL LB 1.5000 5,670.00 0.000 0.00 F) 28 GUARD RAILING DELINEATOR EA 10.0000 60.00 0.000 0.00 29 METAL BEAM GUARD RAILING LF 70.0000 2,660.00 0.000 0.00 30 VEGETATION CONTROL (MINOR CONCRETE) SQYD 36.0000 1,800.00 0.000 0.00 31 END ANCHOR ASSEMBLY (TYPE SFT) EA 900.0000 900.00 0.000 0.00 32 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,200.0000 3,200.00 0.000 0.00 33 THERMOPLASTIC TRAFFIC STRIPE LF 1.2000 2,532.00 0.000 0.00 34 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 600.0000 600.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION 35 TRAFFIC OPERATIONS SYSTEM LS 17,000.0000 17,000.00 0.150 2,550.00 0.300 5,100.00 PROGRAM CAS145 PAGE 3 DATE 09/21/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0G1504 TIME 09:35 AM ESTIMATE NO. 02 BID OPENING 05/11/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/10 R.E. NAME: ASHGAR, REZAEI DATE OF THIS ESTIMATE 09/21/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 42,031.80 58,303.80 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 42,031.80 58,303.80 36 MOBILIZATION LS 8,000.0000 8,000.00 0.750 6,000.00 0.750 6,000.00 ORIGINAL CONTRACT AMOUNT 552,943.00 TOTAL WORK COMPLETED 48,031.80 64,303.80 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 48,031.80 64,303.80 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/30/10 60 07/15/10 07/15/10 10/28/10 0 14 0 0 12% 0% PROGRESS IS SATISFACTORY ASHGAR, REZAEI RESIDENT ENGINEER PROGRAM CAS145 DATE 09/21/10