PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/21/13 EST. NO.01 TIME 10:28 AM R.E. NAME: WASSEF, WAGDY 04-0G1704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/21/13 EST. NO.01 TIME 10:28 AM R.E. NAME: WASSEF, WAGDY 04-0G1704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/21/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0G1704 TIME 10:28 AM ESTIMATE NO. 01 BID OPENING 10/10/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/13 R.E. NAME: WASSEF, WAGDY DATE OF THIS ESTIMATE 08/21/13 LOCATION PROGRESS ESTIMATE 04-SM-1-28.2/ .0 ----------------- COLUMBIA ELECTRIC INC IN SAN MATEO COUNTY IN HALF MOON 1980 DAVIS STREET BAY AT POPLAR STREET SAN LEANDRO CA 94577 FED. AID NO. HSST-P001(572) INSTALL SIGNAL AND LIGHTING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 TEMPORARY FENCE (TYPE ESA) LF 2.5500 4,029.00 1,580.000 4,029.00 1,580.000 4,029 002 CONSTRUCTION SITE MANAGEMENT LS 600.0000 600.00 0.250 150.00 0.250 150 003 PREPARE WATER POLLUTION CONTROL LS 2,300.0000 2,300.00 1.000 2,300.00 1.000 2,300 PROGRAM 004 TEMPORARY FIBER ROLL LF 5.0000 1,000.00 200.000 1,000.00 200.000 1,000 005 TEMPORARY COVER SQYD 6.6000 990.00 150.000 990.00 150.000 990 006 STREET SWEEPING LS 1,500.0000 1,500.00 0.000 0 007 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 500.0000 500.00 0.000 0 008 CONSTRUCTION AREA SIGNS LS 2,500.0000 2,500.00 0.750 1,875.00 0.750 1,875 009 TRAFFIC CONTROL SYSTEM LS 13,150.0000 13,150.00 0.000 0 010 PORTABLE CHANGEABLE MESSAGE SIGN LS 3,000.0000 3,000.00 0.000 0 011 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 55.0000 7,150.00 0.000 0 STRIPE (HAZARDOUS WASTE) 012 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.3000 594.00 0.000 0 013 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 5.5000 1,210.00 0.000 0 014 REMOVE PAVEMENT MARKER EA 5.5000 55.00 0.000 0 015 REMOVE ROADSIDE SIGN (WOOD POST) EA 77.0000 154.00 2.000 154.00 2.000 154 016 CLEARING AND GRUBBING (LS) LS 1,500.0000 1,500.00 0.000 0 017 ROADWAY EXCAVATION CY 305.0000 7,015.00 0.000 0 018 LEAD COMPLIANCE PLAN LS 1,650.0000 1,650.00 1.000 1,650.00 1.000 1,650 019 IMPORTED BORROW (CY) CY 585.0000 7,020.00 0.000 0 020 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 1.3800 6,831.00 0.000 0 021 MINOR HOT MIX ASPHALT TON 250.0000 14,750.00 0.000 0 022 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 26.4000 1,346.40 51.000 1,346.40 51.000 1,346 (0.063"-UNFRAMED) PROGRAM CAS145 PAGE 2 DATE 08/21/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0G1704 TIME 10:28 AM ESTIMATE NO. 01 BID OPENING 10/10/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/13 R.E. NAME: WASSEF, WAGDY DATE OF THIS ESTIMATE 08/21/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ROADSIDE SIGN - ONE POST EA 379.5000 1,138.50 0.000 0 024 CURB RAMP DETECTABLE WARNING SURFACE SQFT 70.0000 5,040.00 0.000 0 025 4" THERMOPLASTIC TRAFFIC STRIPE LF 2.2000 1,826.00 0.000 0 026 THERMOPLASTIC PAVEMENT MARKING SQFT 6.6000 3,894.00 0.000 0 027 PAVEMENT MARKER (RETROREFLECTIVE) EA 22.0000 154.00 0.000 0 028 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 029 SIGNAL AND LIGHTING LS 162,520.0000 162,520.00 0.200 32,504.00 0.200 32,504 PROGRAM CAS145 PAGE 3 DATE 08/21/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0G1704 TIME 10:28 AM ESTIMATE NO. 01 BID OPENING 10/10/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/13 R.E. NAME: WASSEF, WAGDY DATE OF THIS ESTIMATE 08/21/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 45,998.40 45,998.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 45,998.40 45,998.40 030 MOBILIZATION LS 13,160.0000 13,160.00 0.750 9,870.00 0.750 9,870 ORIGINAL CONTRACT AMOUNT 267,576.90 TOTAL WORK COMPLETED 55,868.40 55,868.40 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 55,868.40 55,868.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/13/12 50 08/05/13 08/05/13 10/15/13 12 0 0 0 21% 24% PROGRESS IS SATISFACTORY SATISFACTORY WASSEF, WAGDY RESIDENT ENGINEER PROGRAM CAS145 DATE 08/21/13