PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/17/22 EST. NO. 011 TIME 01:28 PM R.E. NAME: PHUNG, THANH 04-0J5604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/17/22 EST. NO. 011 TIME 01:28 PM R.E. NAME: PHUNG, THANH 04-0J5604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/17/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0J5604 TIME 01:28 PM ESTIMATE NO. 011 BID OPENING 03/03/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: PHUNG, THANH DATE OF THIS ESTIMATE 06/17/22 LOCATION RERUN PROGRESS ESTIMATE 04-SCL-101-0.0/4.2 ----------------------- 04-SCL-237-2.4/ .0 MYERS & SONS CONSTRUCTION, LLC IN SANTA CLARA COUNTY AT VARIOUS 45 MORRISON AVE. LOCATIONS SACRAMENTO, CA 95838 FED. AID NO. ACNH-X085(63)E BRIDGE RAILING REPLACEMENT AT 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 3,000.0000 750,000.00 148.000 444,000 003 DISPUTE RESOLUTION BOARD ON-SITE EA 6,000.0000 42,000.00 2.000 12,000 MEETING 004 HOURLY OFF-SITE HR 200.0000 2,000.00 5.000 1,000 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.900 9,000 006 TRAFFIC CONTROL SYSTEM LS 529,451.5000 529,451.50 0.140 74,123.21 0.902 477,565 007 TEMPORARY TRAFFIC STRIPE (TAPE) LF 1.5000 18,900.00 5,180.000 7,770 008 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.4000 12,640.00 12,963.000 5,185 009 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 6,400.00 80.000 3,200 010 PORTABLE RADAR SPEED FEEDBACK SIGN EA 75.0000 37,500.00 80.000 6,000.00 446.000 33,450 SYSTEM DAY 011 TEMPORARY PAVEMENT MARKER EA 3.5000 2,240.00 253.000 885 012 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 50,000.0000 50,000.00 0.140 7,000.00 0.820 41,000 013 TEMPORARY RAILING (TYPE K) LF 25.0000 233,500.00 5,380.000 134,500 014 TEMPORARY CRASH CUSHION MODULE EA 300.0000 42,000.00 98.000 29,400 015 TEMPORARY ALTERNATIVE CRASH CUSHION EA 5,000.0000 20,000.00 3.250 16,250 016 TEMPORARY RADAR SPEED FEEDBACK EA 10,000.0000 70,000.00 7.000 70,000 SIGN SYSTEM 017 JOB SITE MANAGEMENT LS 35,000.0000 35,000.00 0.140 4,900.00 0.872 30,520 018 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 1.000 1,500 019 TEMPORARY COVER SQYD 5.0000 1,350.00 0.000 0 020 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 600.00 4.000 800 021 TEMPORARY FIBER ROLL LF 4.0000 3,200.00 400.000 1,600 022 TEMPORARY REINFORCED SILT FENCE LF 8.0000 16,560.00 2,070.000 16,560 PROGRAM CAS145 PAGE 2 DATE 06/17/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0J5604 TIME 01:28 PM ESTIMATE NO. 011 BID OPENING 03/03/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: PHUNG, THANH DATE OF THIS ESTIMATE 06/17/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 STREET SWEEPING LS 75,000.0000 75,000.00 0.710 53,250 024 TEMPORARY CONCRETE WASHOUT LS 15,000.0000 15,000.00 0.100 1,500 025 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.0000 8,110.00 4,000.000 4,000 STRIPE (HAZARDOUS WASTE) 026 TREATED WOOD WASTE LB 0.2000 6,000.00 0.000 0 027 TEMPORARY HIGH-VISIBILITY FENCE LF 3.0000 17,310.00 4,327.500 12,982 028 STRUCTURE EXCAVATION (BRIDGE) CY 350.0000 13,300.00 24.700 8,645 (F) 029 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,350.0000 5,400.00 1.250 1,687 030 HYDROMULCH SQFT 0.1500 4,215.00 0.000 0 031 FIBER ROLLS LF 11.0000 24,750.00 0.000 0 032 HOT MIX ASPHALT (TYPE A) TON 250.0000 19,000.00 0.020 5.00 10.520 2,630 033 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 13.0000 10,920.00 0.000 0 034 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 13.0000 1,950.00 0.000 0 035 TACK COAT TON 1,100.0000 110.00 0.000 0 036 REMOVE ASPHALT CONCRETE DIKE LF 20.0000 15,600.00 78.000 1,560 037 STRUCTURAL CONCRETE, BRIDGE CY 2,200.0000 814,000.00 12.900 28,380.00 174.000 382,800 (F) 038 DRILL AND BOND DOWEL LF 60.0000 199,920.00 2,557.000 153,420 039 CLEAN EXPANSION JOINT LF 20.0000 19,160.00 0.000 0 040 JOINT SEAL (MR 1") LF 35.0000 29,295.00 0.000 0 041 JOINT SEAL (MR 1 1/2") LF 50.0000 6,050.00 0.000 0 042 BAR REINFORCING STEEL (BRIDGE) LB 2.0000 124,034.00 33,282.500 66,565 (F) 043 FURNISH SIGN STRUCTURE (BRIDGE MOUNTED LB 15.0000 175,500.00 11,700.000 175,500.00 11,700.000 175,500 (F) WITHOUT WALKWAY) 044 INSTALL SIGN STRUCTURE (BRIDGE MOUNTED LB 4.0000 46,800.00 0.000 0 (F) WITHOUT WALKWAY) 045 REMOVE BRIDGE MOUNTED SIGN EA 1,500.0000 18,000.00 12.000 18,000 046 CARBON FIBER REINFORCED LF 22.0000 587,092.00 4,460.000 98,120.00 10,879.000 239,338 POLYMER STRIPS 047 REMOVE POLYESTER CONCRETE OVERLAY SQFT 5.5000 10,285.00 1,615.000 8,882 048 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.3000 1,258.50 3,967.000 1,190.10 3,967.000 1,190 049 FURNISH POLYESTER CONCRETE OVERLAY CF 125.0000 52,500.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 06/17/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0J5604 TIME 01:28 PM ESTIMATE NO. 011 BID OPENING 03/03/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: PHUNG, THANH DATE OF THIS ESTIMATE 06/17/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 PLACE POLYESTER CONCRETE OVERLAY SQFT 10.0000 41,950.00 0.000 0 (F) 051 BRIDGE REMOVAL (PORTION), LOCATION A LS 80,000.0000 80,000.00 1.000 80,000 052 BRIDGE REMOVAL (PORTION), LOCATION B LS 105,000.0000 105,000.00 0.530 55,650 053 BRIDGE REMOVAL (PORTION), LOCATION C LS 25,000.0000 25,000.00 1.000 25,000 054 BRIDGE REMOVAL (PORTION), LOCATION D LS 20,000.0000 20,000.00 0.900 18,000 055 BRIDGE REMOVAL (PORTION), LOCATION E LS 75,000.0000 75,000.00 0.810 60,750 056 MINOR CONCRETE (CURB) (LF) LF 100.0000 1,000.00 0.000 0 057 REMOVE CURB LF 20.0000 3,800.00 225.000 4,500 058 MISCELLANEOUS METAL (BRIDGE) LB 50.0000 2,300.00 23.000 1,150 (F) 059 BRIDGE DECK DRAINAGE SYSTEM LB 50.0000 1,650.00 33.000 1,650 (F) 060 REMOVE PAVEMENT MARKER EA 2.0000 940.00 214.000 428 061 GUARD RAILING DELINEATOR EA 15.0000 1,290.00 0.000 0 062 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5000 1,645.00 0.000 0 063 BARRIER MARKER EA 5.0000 405.00 0.000 0 064 OBJECT MARKER (TYPE L-1) EA 75.0000 525.00 0.000 0 065 REMOVE ROADSIDE SIGN EA 275.0000 550.00 0.000 0 066 REMOVE ROADSIDE SIGN EA 225.0000 225.00 0.000 0 (STRAP AND SADDLE BRACKET METHOD) 067 REMOVE SIGN PANEL EA 225.0000 225.00 0.000 0 068 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 37.0000 21,830.00 590.000 21,830.00 590.000 21,830 069 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 45.0000 225.00 5.000 225.00 5.000 225 (0.063"-UNFRAMED) 070 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 20.0000 2,600.00 130.000 2,600.00 130.000 2,600 (0.080"-UNFRAMED) 071 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 35.0000 4,900.00 140.000 4,900.00 140.000 4,900 (0.080"-FRAMED) 072 ROADSIDE SIGN - ONE POST EA 350.0000 1,400.00 0.000 0 073 ROADSIDE SIGN - TWO POST EA 850.0000 850.00 0.000 0 074 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 150.0000 300.00 0.000 0 METHOD) 075 INSTALL ROADSIDE SIGN PANEL ON EA 150.0000 300.00 0.000 0 EXISTING POST 076 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 30.0000 45,000.00 575.000 17,250.00 575.000 17,250 PROGRAM CAS145 PAGE 4 DATE 06/17/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0J5604 TIME 01:28 PM ESTIMATE NO. 011 BID OPENING 03/03/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: PHUNG, THANH DATE OF THIS ESTIMATE 06/17/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 VEGETATION CONTROL (MINOR CONCRETE) SQYD 60.0000 57,600.00 0.000 0 078 CHAIN LINK RAILING (TYPE 7 MODIFIED) LF 100.0000 40,000.00 0.000 0 (F) 079 SINGLE THRIE BEAM BARRIER (WOOD POST) LF 65.0000 3,250.00 0.000 0 080 TRANSITION RAILING (TYPE STB) EA 4,200.0000 12,600.00 0.000 0 081 TRANSITION RAILING (TYPE WB-31) EA 3,600.0000 28,800.00 4.000 14,400.00 4.000 14,400 082 END CAP (TYPE TC) EA 575.0000 575.00 0.000 0 083 END ANCHOR ASSEMBLY (TYPE SFT) EA 875.0000 1,750.00 0.000 0 084 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,300.0000 23,100.00 0.000 0 085 CONCRETE BARRIER (TYPE 60M) LF 315.0000 63,000.00 0.000 0 086 CONCRETE BARRIER (TYPE 60M MODIFIED) LF 275.0000 182,325.00 382.380 105,154.50 382.380 105,154 087 CONCRETE BARRIER (TYPE 842 MODIFIED) LF 190.0000 644,670.00 206.000 39,140.00 838.000 159,220 (F) 088 REMOVE GUARDRAIL LF 6.5000 5,720.00 262.500 1,706 089 SALVAGE CONCRETE BARRIER (TYPE K) LF 15.0000 4,500.00 300.000 4,500 090 REMOVE CONCRETE BARRIER (TYPE 50) LF 50.0000 10,000.00 0.000 0 091 REMOVE CRASH CUSHION EA 1,800.0000 1,800.00 1.000 1,800 092 CONCRETE BARRIER (TYPE 842A LF 240.0000 64,800.00 47.333 11,359.92 47.333 11,359 (F) MODIFIED) 093 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 4,616.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 18-12) 094 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 10,260.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 095 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 1,240.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 096 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 660.00 3,996.000 7,992.00 3,996.000 7,992 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 097 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 11,460.00 4,775.000 2,865 098 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 4.0000 9,280.00 0.000 0 099 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.5000 22,950.00 0.000 0 (WARRANTY) 100 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 6.0000 2,400.00 0.000 0 (WARRANTY) 101 MODIFYING LIGHTING SYSTEMS LS 235,000.0000 235,000.00 0.000 0 102 REMOVING LIGHTING SYSTEMS LS 17,000.0000 17,000.00 1.000 17,000 PROGRAM CAS145 PAGE 5 DATE 06/17/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0J5604 TIME 01:28 PM ESTIMATE NO. 011 BID OPENING 03/03/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: PHUNG, THANH DATE OF THIS ESTIMATE 06/17/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 103 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 104 STRUCTURE EXCAVATION (TYPE Z-2) CY 275.0000 11,550.00 0.000 0 (AERIALLY DEPOSITED LEAD) 105 REFINISH BRIDGE DECK SQFT 10.0000 10,060.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 06/17/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0J5604 TIME 01:28 PM ESTIMATE NO. 011 BID OPENING 03/03/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: PHUNG, THANH DATE OF THIS ESTIMATE 06/17/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 620,069.73 3,090,567.22 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 21,569.08 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 620,069.73 3,112,136.30 106 MOBILIZATION LS 670,000.0000 670,000.00 0.050 33,500.00 1.000 670,000 ORIGINAL CONTRACT AMOUNT 6,777,777.00 TOTAL WORK COMPLETED 653,569.73 3,782,136.30 MATERIALS ON HAND ON SITE -255,753.92 291,913.08 DEDUCTIONS 0.00 0.00 TOTAL 397,815.81 4,074,049.38 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/15/21 250 06/09/21 06/09/21 02/14/23 140 121 0 0 55% 56% PROGRESS IS SATISFACTORY *** SUSPENDED ON 03/02/22. PHUNG, THANH RESIDENT ENGINEER