PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/18/24 EST. NO. 006 TIME 11:55 AM R.E. NAME: PANDHER, PARAMJIT 04-0P1204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/18/24 EST. NO. 006 TIME 11:55 AM R.E. NAME: PANDHER, PARAMJIT 04-0P1204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/18/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0P1204 TIME 11:55 AM ESTIMATE NO. 006 BID OPENING 02/13/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/24 R.E. NAME: PANDHER, PARAMJIT DATE OF THIS ESTIMATE 12/18/24 LOCATION PROGRESS ESTIMATE 04-ALA-580-R4.3 ----------------- O.C. JONES & SONS, INC. ALAMEDA COUNTY ON ROUTE 580 AT 0.3 MILE 1520 FOURTH STREET WEST OF STONE CUT UNDERPASS. BERKELEY CA 94710 FED. AID NO. ACIM-5801(983)E STORM DAMAGE (PERMANENT RESTORATION). ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 1,200.0000 1,200.00 0.000 0 003 TIME-RELATED OVERHEAD (WDAY) WDAY 750.0000 56,250.00 18.500 13,875.00 93.500 70,125 004 DEVELOP WATER SUPPLY LS 3,000.0000 3,000.00 1.000 3,000 005 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 1.000 5,000 006 TRAFFIC CONTROL SYSTEM LS 60,000.0000 60,000.00 1.000 60,000 007 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 290.0000 21,750.00 24.000 6,960 008 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.5000 4,050.00 0.000 0 009 CHANNELIZER (SURFACE MOUNTED) EA 200.0000 1,200.00 0.000 0 010 PORTABLE RADAR SPEED FEEDBACK SIGN EA 1,300.0000 1,300.00 1.000 1,300 SYSTEM DAY 011 TEMPORARY PAVEMENT MARKER EA 3.0000 450.00 0.000 0 (RETROREFLECTIVE) 012 TEMPORARY BARRIER SYSTEM LF 40.0000 23,200.00 0.000 0 013 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 8,000.0000 8,000.00 1.000 8,000 014 TEMPORARY AUTOMATED END OF QUEUE WARNING EA 400.0000 30,000.00 75.000 30,000 SYSTEM (TYPE 1) DAY 015 ALTERNATIVE TEMPORARY CRASH CUSHION TL-3 EA 7,000.0000 7,000.00 0.000 0 016 JOB SITE MANAGEMENT LS 16,000.0000 16,000.00 1.000 16,000 017 WATER POLLUTION CONTROL PROGRAM LS 2,750.0000 2,750.00 1.000 2,750 018 TEMPORARY COVER SQYD 4.8000 4,320.00 0.000 0 019 TEMPORARY DRAINAGE INLET PROTECTION EA 265.0000 1,590.00 3.000 795 020 TEMPORARY REINFORCED SILT FENCE LF 13.2500 19,875.00 1,400.000 18,550 021 TEMPORARY CONSTRUCTION ENTRANCE EA 3,000.0000 3,000.00 1.000 3,000 022 STREET SWEEPING LS 6,000.0000 6,000.00 1.000 6,000 PROGRAM CAS145 PAGE 2 DATE 12/18/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0P1204 TIME 11:55 AM ESTIMATE NO. 006 BID OPENING 02/13/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/24 R.E. NAME: PANDHER, PARAMJIT DATE OF THIS ESTIMATE 12/18/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY CONCRETE WASHOUT LS 1,000.0000 1,000.00 1.000 1,000 024 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.5000 2,430.00 0.000 0 STRIPE (HAZARDOUS WASTE) 025 CLEARING AND GRUBBING (LS) LS 13,000.0000 13,000.00 1.000 13,000 026 ROADWAY EXCAVATION CY 110.0000 11,000.00 100.000 11,000 027 IMPORTED BORROW (CY) CY 200.0000 100,000.00 293.000 58,600.00 918.000 183,600 028 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 600.0000 600.00 2.000 1,200 029 DRY SEED (SQFT) SQFT 0.6100 1,232.20 2,020.000 1,232 030 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 0.5500 32,725.00 59,500.000 32,725 031 HYDROMULCH SQFT 0.0600 3,570.00 59,500.000 3,570 032 FIBER ROLLS LF 6.6500 19,950.00 3,000.000 19,950 033 HYDROSEED SQFT 0.1200 7,140.00 59,500.000 7,140 034 COMPOST (CY) CY 57.0000 10,830.00 80.000 4,560 035 INCORPORATE MATERIALS SQFT 0.0600 397.20 6,260.000 375 036 PERMANENT EROSION CONTROL ESTABLISHMENT LS 25,000.0000 25,000.00 0.750 18,750.00 0.750 18,750 WORK 037 HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED TON 170.0000 120,700.00 0.000 0 FRICTION COURSE) 038 TACK COAT TON 1,100.0000 6,600.00 0.000 0 039 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.4000 29,040.00 0.000 0 040 18" CORRUGATED STEEL PIPE (.109" THICK) LF 150.0000 60,000.00 400.000 60,000 041 18" ENTRANCE TAPER EA 2,600.0000 2,600.00 1.000 2,600 042 REMOVE CULVERT (LF) LF 110.0000 3,960.00 36.000 3,960 043 ROCK SLOPE PROTECTION (60 LB, CLASS II, CY 2,800.0000 8,400.00 3.000 8,400 METHOD B) (CY) 044 FENCE (TYPE BW, WOOD POST) LF 36.0000 14,400.00 400.000 14,400 045 TEMPORARY FENCE (TYPE BW) LF 48.0000 19,200.00 124.000 5,952 046 REMOVE PAVEMENT MARKER EA 1.5000 225.00 0.000 0 047 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 750.00 0.000 0 048 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.2500 4,050.00 0.000 0 049 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 6,480.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 12/18/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0P1204 TIME 11:55 AM ESTIMATE NO. 006 BID OPENING 02/13/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/24 R.E. NAME: PANDHER, PARAMJIT DATE OF THIS ESTIMATE 12/18/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 12" RUMBLE STRIP (ASPHALT CONCRETE STA 450.0000 13,950.00 0.000 0 PAVEMENT) 051 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 12.0000 58,320.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 12/18/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0P1204 TIME 11:55 AM ESTIMATE NO. 006 BID OPENING 02/13/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/24 R.E. NAME: PANDHER, PARAMJIT DATE OF THIS ESTIMATE 12/18/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 91,225.00 627,894.80 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 91,225.00 627,894.80 052 MOBILIZATION LS 70,000.0000 70,000.00 1.000 70,000 ORIGINAL CONTRACT AMOUNT 926,484.40 TOTAL WORK COMPLETED 91,225.00 697,894.80 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 91,225.00 697,894.80 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/02/24 75 05/17/24 05/17/24 12/24/24 75 72 0 0 90% 100% PROGRESS IS SATISFACTORY PANDHER, PARAMJIT RESIDENT ENGINEER