PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/19/19 EST. NO. 001 TIME 08:03 AM R.E. NAME: ARSHAD, MIAN 04-0P5104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/19/19 EST. NO. 001 TIME 08:03 AM R.E. NAME: ARSHAD, MIAN 04-0P5104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0P5104 TIME 08:03 AM ESTIMATE NO. 001 BID OPENING 05/30/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: ARSHAD, MIAN DATE OF THIS ESTIMATE 09/19/19 LOCATION PROGRESS ESTIMATE 04-ALA-80-4.5/6.6 ----------------- TRUESDELL CORPORATION OF IN ALAMEDA COUNTY AT VARIOUS CALIFORNIA, INC. LOCATIONS. 1310 W. 23RD STREET; TEMPE AZ 85282 FED. AID NO. N O N E TREAT BRIDGE DECKS WITH ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 7,500.0000 7,500.00 1.000 7,500.00 1.000 7,500 002 CONSTRUCTION AREA SIGNS LS 34,000.0000 34,000.00 0.700 23,800.00 0.700 23,800 003 TRAFFIC CONTROL SYSTEM LS 280,000.0000 280,000.00 0.250 70,000.00 0.250 70,000 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 16,000.0000 16,000.00 0.250 4,000.00 0.250 4,000 005 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.250 1,250.00 0.250 1,250 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 7,500.0000 7,500.00 0.750 5,625.00 0.750 5,625 007 STREET SWEEPING LS 2,500.0000 2,500.00 0.250 625.00 0.250 625 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.0000 15,000.00 4,105.000 8,210.00 4,105.000 8,210 STRIPE (HAZARDOUS WASTE) 009 NOISE MONITORING LS 2,825.0000 2,825.00 0.000 0 010 TEMPORARY DECKING LS 21,000.0000 21,000.00 0.000 0 011 STRUCTURAL CONCRETE, BRIDGE CY 5,000.0000 30,000.00 0.000 0 (F) 012 DRILL AND BOND DOWEL LF 150.0000 1,200.00 0.000 0 013 DRILL AND BOND DOWEL LF 150.0000 900.00 0.000 0 (CHEMICAL ADHESIVE)(LF) 014 CLEAN EXPANSION JOINT LF 69.0000 87,492.00 0.000 0 015 JOINT SEAL (MR 1/2") LF 45.0000 12,735.00 0.000 0 016 JOINT SEAL (MR 1") LF 59.0000 5,133.00 0.000 0 017 JOINT SEAL (MR 1 1/2") LF 79.0000 5,056.00 0.000 0 018 JOINT SEAL (MR 2") LF 103.0000 6,386.00 0.000 0 019 REPLACE NEOPRENE GLAND (WABO STRIP LF 103.0000 94,142.00 0.000 0 SEAL SE-300) 020 REPLACE NEOPRENE GLAND (WABO STRIP LF 103.0000 30,591.00 0.000 0 SEAL SE-500) 021 REPLACE STEEL EDGE RAIL (WABO TYPE M) LF 500.0000 13,500.00 0.000 0 022 BAR REINFORCING STEEL (BRIDGE) LB 5.0000 1,275.00 0.000 0 (F) PROGRAM CAS145 PAGE 2 DATE 09/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0P5104 TIME 08:03 AM ESTIMATE NO. 001 BID OPENING 05/30/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: ARSHAD, MIAN DATE OF THIS ESTIMATE 09/19/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 INSTALL BRIDGE MOUNTED SIGN EA 1,100.0000 8,800.00 0.000 0 024 REMOVE BRIDGE MOUNTED SIGN EA 650.0000 4,550.00 0.000 0 025 PUBLIC SAFETY PLAN LS 4,000.0000 4,000.00 1.000 4,000.00 1.000 4,000 026 RAPID SETTING CONCRETE (PATCH) CF 300.0000 1,800.00 0.000 0 027 REPAIR SPALLED SURFACE AREA SQFT 350.0000 10,850.00 0.000 0 028 REMOVE UNSOUND CONCRETE CF 350.0000 2,100.00 0.000 0 029 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1500 81,635.10 245,458.000 36,818.70 245,458.000 36,818 030 TREAT BRIDGE DECK SQFT 0.1500 81,635.10 245,458.000 36,818.70 245,458.000 36,818 (F) 031 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 69.0000 417,519.00 2,960.000 204,240.00 2,960.000 204,240 032 REPLACE ACCESS DOOR EA 3,500.0000 49,000.00 0.000 0 033 PAINT BRIDGE IDENTIFICATION EA 200.0000 31,800.00 0.000 0 034 BRIDGE REMOVAL (PORTION), LOCATION A LS 50,000.0000 50,000.00 0.000 0 035 BRIDGE REMOVAL (PORTION), LOCATION B LS 50,000.0000 50,000.00 0.000 0 036 BRIDGE REMOVAL (PORTION), LOCATION C LS 10,000.0000 10,000.00 0.000 0 037 MISCELLANEOUS METAL (BRIDGE) LB 20.0000 5,200.00 0.000 0 (F) 038 REMOVE PAVEMENT MARKER EA 1.0000 190.00 296.000 296.00 296.000 296 039 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.5000 2,100.00 0.000 0 040 REMOVE ROADSIDE SIGN EA 135.0000 2,160.00 0.000 0 041 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.5000 4,750.00 0.000 0 (0.063"-UNFRAMED) 042 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.0000 1,280.00 0.000 0 (0.080"-UNFRAMED) 043 ROADSIDE SIGN - ONE POST EA 380.0000 9,120.00 0.000 0 044 ROADSIDE SIGN - TWO POST EA 1,750.0000 1,750.00 0.000 0 045 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 550.0000 1,100.00 0.000 0 METHOD) 046 CHAIN LINK RAILING (TYPE 2 MODIFIED) LF 138.0000 165,600.00 0.000 0 047 THERMOPLASTIC PAVEMENT MARKING SQFT 16.0000 2,080.00 0.000 0 048 6" THERMOPLASTIC TRAFFIC STRIPE LF 4.2500 1,020.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) PROGRAM CAS145 PAGE 3 DATE 09/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0P5104 TIME 08:03 AM ESTIMATE NO. 001 BID OPENING 05/30/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: ARSHAD, MIAN DATE OF THIS ESTIMATE 09/19/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 PAINT TRAFFIC STRIPE (2-COAT) LF 0.8500 6,120.00 0.000 0 050 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.1000 32,760.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 051 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 16,600.00 2,697.000 5,394.00 2,697.000 5,394 PROGRAM CAS145 PAGE 4 DATE 09/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0P5104 TIME 08:03 AM ESTIMATE NO. 001 BID OPENING 05/30/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: ARSHAD, MIAN DATE OF THIS ESTIMATE 09/19/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 408,577.40 408,577.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 408,577.40 408,577.40 052 MOBILIZATION LS 123,603.8000 123,603.80 0.950 117,423.61 0.950 117,423 ORIGINAL CONTRACT AMOUNT 1,858,858.00 TOTAL WORK COMPLETED 526,001.01 526,001.01 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 526,001.01 526,001.01 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/11/19 160 08/12/19 07/26/19 04/01/20 40 0 0 0 28% 25% PROGRESS IS SATISFACTORY ARSHAD, MIAN RESIDENT ENGINEER PROGRAM CAS145 DATE 09/19/19