PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/20/21 EST. NO. 002 TIME 12:43 PM R.E. NAME: RANDHAWA, PERVEZ 04-0W7704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/20/21 EST. NO. 002 TIME 12:43 PM R.E. NAME: RANDHAWA, PERVEZ 04-0W7704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0W7704 TIME 12:43 PM ESTIMATE NO. 002 BID OPENING 05/18/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/21 R.E. NAME: RANDHAWA, PERVEZ DATE OF THIS ESTIMATE 09/20/21 LOCATION PROGRESS ESTIMATE 04-CC-680-R0.0/R7.6 ----------------- FBD VANGUARD CONSTRUCTION, IN CONTRA COSTA COUNTY, IN SAN INC. RAMON AND DANVILLE FROM ALCOSTA 550 GREENVILLE ROAD BOULEVARD OVERCROSSING TO DIABLE LIVERMORE CA 94550 ROAD UNDERCROSSING FED. AID NO. N O N E REPLACE PCC SLABS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 TIME-RELATED OVERHEAD (WDAY) WDAY 250.0000 18,750.00 20.000 5,000.00 48.000 12,000 002 CONSTRUCTION AREA SIGNS LS 8,500.0000 8,500.00 0.500 4,250 003 TRAFFIC CONTROL SYSTEM LS 37,000.0000 37,000.00 0.750 27,750.00 0.750 27,750 004 PORTABLE RADAR SPEED FEEDBACK SIGN EA 100.0000 4,500.00 45.000 4,500.00 45.000 4,500 SYSTEM DAY 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 4,000.0000 4,000.00 0.010 40.00 0.010 40 006 JOB SITE MANAGEMENT LS 4,174.0000 4,174.00 0.200 834.80 0.200 834 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 800.0000 800.00 0.750 600 008 TEMPORARY DRAINAGE INLET PROTECTION EA 252.0000 3,276.00 0.000 0 009 STREET SWEEPING LS 3,000.0000 3,000.00 0.500 1,500.00 0.500 1,500 010 TEMPORARY CONCRETE WASHOUT LS 1,800.0000 1,800.00 0.500 900.00 0.500 900 011 NOISE MONITORING LS 2,500.0000 2,500.00 0.000 0 012 BASE BOND BREAKER SQYD 3.0000 4,560.00 1,368.000 4,104.00 1,368.000 4,104 013 DRILL AND BOND (DOWEL BAR) EA 25.0000 29,000.00 1,044.000 26,100.00 1,044.000 26,100 014 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 880.0000 536,800.00 549.000 483,120.00 549.000 483,120 015 PAVEMENT MARKER (RETROREFLECTIVE) EA 88.0000 7,480.00 0.000 0 016 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 825.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 017 10" TRAFFIC STRIPE TAPE WITH CONTRAST LF 13.3000 25,935.00 0.000 0 (BROKEN 36-12) (WARRANTY) 018 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,500.0000 5,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 09/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-0W7704 TIME 12:43 PM ESTIMATE NO. 002 BID OPENING 05/18/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/21 R.E. NAME: RANDHAWA, PERVEZ DATE OF THIS ESTIMATE 09/20/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 553,848.80 565,698.80 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 553,848.80 565,698.80 019 MOBILIZATION LS 73,400.0000 73,400.00 1.000 73,400.00 1.000 73,400 ORIGINAL CONTRACT AMOUNT 771,800.00 TOTAL WORK COMPLETED 627,248.80 639,098.80 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 627,248.80 639,098.80 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/22/21 75 00/00/00 07/14/21 10/28/21 48 0 0 0 83% 64% PROGRESS IS SATISFACTORY RANDHAWA, PERVEZ RESIDENT ENGINEER PROGRAM CAS145 DATE 09/20/21