PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/24/10 EST. NO.01 TIME 08:31 AM R.E. NAME: WASSEF, WAGDY 04-151384 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/24/10 EST. NO.01 TIME 08:31 AM R.E. NAME: WASSEF, WAGDY 04-151384 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/24/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-151384 TIME 08:31 AM ESTIMATE NO. 01 BID OPENING 01/05/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/10 R.E. NAME: WASSEF, WAGDY DATE OF THIS ESTIMATE 05/24/10 LOCATION PROGRESS ESTIMATE 04-SCL-680-0.2/0.9 ----------------- 04-SCL-280-1.5/9.2 PACIFIC ELECTRIC CONTRACTING IN SANTA CLARA AND SAN MATEO 04-SM-280-21.2/25.9 ATTN: FRANK KAMACHO COUNTIES AT VARIOUS LOCATIONS FED. AID NO. ACIM-000(311)E INSTALL CLOSED CIRCUIT TV CAMERA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 500.00 0.000 0.00 02 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.000 0.00 03 PREPARE WATER POLLUTION CONTROL LS 565.0000 565.00 0.750 423.75 0.750 423.75 PROGRAM 04 TEMPORARY DRAINAGE INLET PROTECTION EA 170.0000 4,250.00 20.000 3,400.00 20.000 3,400.00 05 STREET SWEEPING LS 5,000.0000 5,000.00 0.000 0.00 06 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 0.000 0.00 07 CONSTRUCTION AREA SIGNS LS 10,700.0000 10,700.00 0.800 8,560.00 0.800 8,560.00 08 TRAFFIC CONTROL SYSTEM LS 29,000.0000 29,000.00 0.000 0.00 09 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,260.0000 2,260.00 0.000 0.00 10 LEAD COMPLIANCE PLAN LS 1,695.0000 1,695.00 1.000 1,695.00 1.000 1,695.00 11 OBJECT MARKER (TYPE L-1) EA 38.0000 38.00 0.000 0.00 12 METAL BEAM GUARD RAILING LF 56.0000 2,100.00 0.000 0.00 13 END ANCHOR ASSEMBLY (TYPE SFT) EA 791.0000 791.00 0.000 0.00 14 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,147.0000 2,147.00 0.000 0.00 15 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 40,400.0000 40,400.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION 16 MODIFY TRAFFIC OPERATIONS SYSTEM LS 19,314.0000 19,314.00 0.000 0.00 (LOCATION 1) 17 MODIFY TRAFFIC OPERATIONS SYSTEM LS 29,586.0000 29,586.00 0.000 0.00 (LOCATION 2) 18 MODIFY TRAFFIC OPERATIONS SYSTEM LS 28,265.0000 28,265.00 0.000 0.00 (LOCATION 3) 19 MODIFY TRAFFIC OPERATIONS SYSTEM LS 20,181.0000 20,181.00 0.000 0.00 (LOCATION 4) 20 MODIFY TRAFFIC OPERATIONS SYSTEM LS 17,230.0000 17,230.00 0.000 0.00 (LOCATION 5) 21 MODIFY TRAFFIC OPERATIONS SYSTEM LS 20,872.0000 20,872.00 0.000 0.00 (LOCATION 6) 22 MODIFY TRAFFIC OPERATIONS SYSTEM LS 22,420.0000 22,420.00 0.000 0.00 (LOCATION 7) PROGRAM CAS145 PAGE 2 DATE 05/24/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-151384 TIME 08:31 AM ESTIMATE NO. 01 BID OPENING 01/05/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/10 R.E. NAME: WASSEF, WAGDY DATE OF THIS ESTIMATE 05/24/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MODIFY TRAFFIC OPERATIONS SYSTEM LS 14,798.0000 14,798.00 0.000 0.00 (LOCATION 8) 24 MODIFY TRAFFIC OPERATIONS SYSTEM LS 28,301.0000 28,301.00 0.000 0.00 (LOCATION 9) 25 MODIFY TRAFFIC OPERATIONS SYSTEM LS 60,426.0000 60,426.00 0.000 0.00 (LOCATION 10) 26 MODIFY TRAFFIC OPERATIONS SYSTEM LS 21,790.0000 21,790.00 0.000 0.00 (LOCATION 11) 27 MODIFY TRAFFIC OPERATIONS SYSTEM LS 18,963.0000 18,963.00 0.000 0.00 (LOCATION 12) 28 MODIFY TRAFFIC OPERATIONS SYSTEM LS 19,351.0000 19,351.00 0.000 0.00 (LOCATION 13) 29 MODIFY TRAFFIC OPERATIONS SYSTEM LS 24,181.0000 24,181.00 0.000 0.00 (LOCATION 14) 30 MODIFY TRAFFIC OPERATIONS SYSTEM LS 34,423.0000 34,423.00 0.000 0.00 (LOCATION 15) 31 MODIFY TRAFFIC OPERATIONS SYSTEM LS 31,099.0000 31,099.00 0.000 0.00 (LOCATION 16) PROGRAM CAS145 PAGE 3 DATE 05/24/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-151384 TIME 08:31 AM ESTIMATE NO. 01 BID OPENING 01/05/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/10 R.E. NAME: WASSEF, WAGDY DATE OF THIS ESTIMATE 05/24/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 14,078.75 14,078.75 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 14,078.75 14,078.75 32 MOBILIZATION LS 5,000.0000 5,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 517,146.00 TOTAL WORK COMPLETED 14,078.75 14,078.75 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 14,078.75 14,078.75 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/17/10 100 04/26/10 04/26/10 09/17/11 17 2 0 0 3% 17% PROGRESS IS SATISFACTORY SATISFACTORY WASSEF, WAGDY RESIDENT ENGINEER PROGRAM CAS145 PAGE 4 DATE 05/24/10