PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/22/19 EST. NO. 004 TIME 05:09 PM R.E. NAME: NGUYEN, VERNON 04-151484 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 2,102.76 E.W. @ F.A.(+) 042619 N 0005.0 006 0006 4,829.68 E.W. @ F.A.(+) 053019 N 0014.0 0007 5,265.94 053119 N 0015.0 0013 2,293.95 061219 N 0004.1 0014 1,426.72 061319 N 0007.1 0015 2,293.95 061319 N 0008.1 0018 1,709.98 061219 N 0003.1 19,922.98 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 19,922.98 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/22/19 EST. NO. 004 TIME 05:09 PM R.E. NAME: NGUYEN, VERNON 04-151484 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-151484 TIME 05:09 PM ESTIMATE NO. 004 BID OPENING 01/15/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: NGUYEN, VERNON DATE OF THIS ESTIMATE 07/22/19 LOCATION RERUN PROGRESS ESTIMATE 04-ALA-880 ----------------------- 04-ALA-84 GHILOTTI CONSTRUCTION CO. IN ALAMEDA COUNTY IN FREMONT AND INC. NEWARK AT VARIOUS LOCATINS ON RTE 246 GHILOTTI AVENUE 880 FR AUTO MALL PKWY OC TO MOWRY SANTA ROSA CA 95407 AVE OC AND ON RTE 84 FR THORNTON AVE OC TO NEWARK BLVD UC FED. AID NO. IM- ( ) ,NH- ( ) WIDEN RAMPS AND INSTALL RAMP ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,285.0000 2,285.00 1.000 2,285 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.250 1,250.00 0.500 2,500 003 TIME-RELATED OVERHEAD (WDAY) WDAY 3,500.0000 455,000.00 21.000 73,500.00 45.000 157,500 004 CONSTRUCTION AREA SIGNS LS 23,300.0000 23,300.00 0.700 16,310 005 TRAFFIC CONTROL SYSTEM LS 276,000.0000 276,000.00 0.050 13,800.00 0.250 69,000 006 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.5000 73,200.00 3,759.000 5,638.50 21,639.000 32,458 007 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 5,180.00 23.000 805.00 40.000 1,400 008 TEMPORARY PAVEMENT MARKER EA 15.0000 11,400.00 42.000 630.00 122.000 1,830 009 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 15,000.0000 15,000.00 0.000 0 010 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 45,000.0000 45,000.00 0.100 4,500.00 0.300 13,500 011 TEMPORARY RAILING (TYPE K) LF 25.0000 360,000.00 4,200.000 105,000 012 TEMPORARY CRASH CUSHION MODULE EA 500.0000 34,000.00 17.000 8,500.00 17.000 8,500 013 TEMPORARY ALTERNATIVE CRASH CUSHION EA 3,000.0000 78,000.00 2.000 6,000.00 5.000 15,000 (TL-3) 014 JOB SITE MANAGEMENT LS 18,000.0000 18,000.00 0.100 1,800.00 0.300 5,400 015 PREPARE STORM WATER POLLUTION PREVENTION LS 1,650.0000 1,650.00 0.030 49.50 0.600 990 PLAN 016 RAIN EVENT ACTION PLAN EA 500.0000 31,500.00 1.000 500 017 STORM WATER SAMPLING AND ANALYSIS DAY EA 500.0000 15,500.00 2.000 1,000 018 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 1.000 2,000.00 1.000 2,000 019 TEMPORARY HYDRAULIC MULCH SQYD 1.0000 14,100.00 0.000 0 (BONDED FIBER MATRIX) 020 TEMPORARY COVER SQYD 8.0000 3,840.00 0.000 0 021 TEMPORARY CHECK DAM LF 10.0000 3,900.00 0.000 0 022 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 6,250.00 14.000 3,500 PROGRAM CAS145 PAGE 2 DATE 07/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-151484 TIME 05:09 PM ESTIMATE NO. 004 BID OPENING 01/15/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: NGUYEN, VERNON DATE OF THIS ESTIMATE 07/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY FIBER ROLL LF 4.0000 19,160.00 0.000 0 024 TEMPORARY GRAVEL BAG BERM LF 14.0000 5,600.00 0.000 0 025 TEMPORARY SILT FENCE LF 4.0000 11,160.00 1,150.000 4,600 026 TEMPORARY CONSTRUCTION ENTRANCE EA 4,000.0000 24,000.00 0.000 0 027 STREET SWEEPING LS 600.0000 600.00 0.100 60.00 0.300 180 028 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.000 0 029 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.0000 6,050.00 0.000 0 STRIPE (HAZARDOUS WASTE) 030 TREATED WOOD WASTE LB 0.2500 2,425.00 5,640.000 1,410 031 TEMPORARY HIGH-VISIBILITY FENCE LF 5.0000 21,150.00 1,831.000 9,155 032 CLEARING AND GRUBBING (LS) LS 30,000.0000 30,000.00 0.750 22,500.00 0.750 22,500 033 ROADWAY EXCAVATION CY 65.0000 1,131,000.00 6,552.000 425,880.00 6,552.000 425,880 034 DITCH EXCAVATION CY 100.0000 8,100.00 0.000 0 035 CHECK AND TEST EXISTING IRRIGATION LS 12,500.0000 12,500.00 0.100 1,250.00 0.300 3,750 FACILITIES 036 OPERATE EXISTING IRRIGATION FACILITIES LS 15,000.0000 15,000.00 0.100 1,500.00 0.300 4,500 037 REMOVE IRRIGATION FACILITY LS 15,000.0000 15,000.00 0.100 1,500.00 0.100 1,500 038 CONTROL AND NEUTRAL CONDUCTORS LS 10,000.0000 10,000.00 0.000 0 039 3" PLASTIC PIPE (CLASS 315) LF 30.0000 15,600.00 0.000 0 (SUPPLY LINE) 040 8" CORRUGATED HIGH DENSITY LF 90.0000 43,200.00 0.000 0 POLYETHYLENE PIPE CONDUIT 041 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 934.0000 3,736.00 0.000 0 042 HYDROMULCH SQFT 0.0700 3,913.00 0.000 0 043 FIBER ROLLS LF 3.0500 9,699.00 0.000 0 044 HYDROSEED SQFT 0.1100 6,149.00 0.000 0 045 CLASS 2 AGGREGATE BASE (CY) CY 55.0000 566,500.00 3,000.000 165,000.00 3,000.000 165,000 046 ASPHALT TREATED PERMEABLE BASE CY 225.0000 353,250.00 0.000 0 047 REPLACE ASPHALT CONCRETE SURFACING CY 350.0000 259,000.00 0.000 0 048 PRIME COAT TON 2,100.0000 3,570.00 0.000 0 049 HOT MIX ASPHALT (TYPE A) TON 110.0000 860,200.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 07/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-151484 TIME 05:09 PM ESTIMATE NO. 004 BID OPENING 01/15/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: NGUYEN, VERNON DATE OF THIS ESTIMATE 07/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 150.0000 369,000.00 0.000 0 051 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED TON 150.0000 247,500.00 0.000 0 (OPEN GRADED FRICTION COURSE) 052 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 2.2700 2,088.40 0.000 0 053 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 2.2700 4,403.80 0.000 0 054 PLACE HOT MIX ASPHALT SQYD 75.0000 900.00 0.000 0 (MISCELLANEOUS AREA) 055 TACK COAT TON 1,200.0000 57,600.00 0.000 0 056 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.5000 85,050.00 0.000 0 057 STRUCTURAL CONCRETE, DRAINAGE INLET CY 5,000.0000 41,500.00 0.000 0 (F) 058 SOUND WALL GAP CLOSURE LS 50,000.0000 50,000.00 0.000 0 059 18" ALTERNATIVE PIPE CULVERT LF 200.0000 110,000.00 0.000 0 060 24" ALTERNATIVE PIPE CULVERT LF 225.0000 22,500.00 0.000 0 061 3" PLASTIC PIPE (EDGE DRAIN) LF 18.0000 75,600.00 0.000 0 062 3" PLASTIC PIPE (EDGE DRAIN OUTLET) LF 50.0000 14,000.00 0.000 0 063 12" CORRUGATED STEEL PIPE DOWNDRAIN LF 200.0000 32,000.00 0.000 0 064 12" ALTERNATIVE FLARED END SECTION EA 800.0000 1,600.00 0.000 0 065 18" ALTERNATIVE FLARED END SECTION EA 800.0000 4,000.00 0.000 0 066 ABANDON CULVERT (LF) LF 75.0000 3,600.00 0.000 0 067 ABANDON INLET EA 1,000.0000 2,000.00 0.000 0 068 REMOVE CULVERT (LF) LF 20.0000 13,000.00 0.000 0 069 REMOVE INLET EA 1,800.0000 1,800.00 0.000 0 070 REMOVE FLARED END SECTION (EA) EA 400.0000 2,800.00 0.000 0 071 ADJUST INLET EA 3,000.0000 3,000.00 0.000 0 072 DETECTABLE WARNING SURFACE SQFT 25.0000 5,500.00 0.000 0 073 MINOR CONCRETE (CURB, SIDEWALK AND CY 900.0000 64,800.00 0.000 0 CURB RAMP) 074 REMOVE CONCRETE LF 75.0000 36,750.00 0.000 0 (CURB, GUTTER, AND SIDEWALK) (LF) 075 PRE/POST CONSTRUCTION SURVEYS EA 1,150.0000 11,500.00 0.000 0 076 MISCELLANEOUS IRON AND STEEL LB 5.0000 14,130.00 0.000 0 (F) PROGRAM CAS145 PAGE 4 DATE 07/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-151484 TIME 05:09 PM ESTIMATE NO. 004 BID OPENING 01/15/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: NGUYEN, VERNON DATE OF THIS ESTIMATE 07/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 REMOVE PAVEMENT MARKER EA 1.0000 1,150.00 0.000 0 078 DELINEATOR (CLASS 1) EA 40.0000 3,360.00 0.000 0 079 PAVEMENT MARKER (RETROREFLECTIVE) EA 15.0000 15,450.00 0.000 0 080 REMOVE ROADSIDE SIGN EA 80.0000 4,240.00 0.000 0 081 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 8.7500 11,550.00 0.000 0 (0.063" - UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 082 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 9.7500 3,900.00 0.000 0 (0.080" - UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 083 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.7500 621.25 0.000 0 (0.063" - FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 084 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.2500 7,437.50 0.000 0 085 ROADSIDE SIGN - ONE POST EA 250.0000 20,750.00 0.000 0 086 ROADSIDE SIGN - TWO POST EA 350.0000 1,400.00 0.000 0 087 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 80.0000 5,520.00 0.000 0 METHOD) 088 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 35.0000 21,000.00 0.000 0 089 VEGETATION CONTROL (MINOR CONCRETE) SQYD 65.0000 35,750.00 0.000 0 090 CONCRETE BARRIER (TYPE 50) LF 1,530.0000 18,360.00 0.000 0 091 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,200.0000 2,400.00 0.000 0 092 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,000.0000 10,000.00 0.000 0 093 ALTERNATIVE CRASH CUSHION EA 40,000.0000 120,000.00 0.000 0 094 CONCRETE BARRIER (ANCHOR BLOCK) LF 755.0000 7,550.00 0.000 0 095 CONCRETE BARRIER (TYPE 60MSF MODIFIED) LF 484.0000 130,680.00 0.000 0 096 CONCRETE BARRIER (TYPE 60MSC) LF 140.7000 91,455.00 0.000 0 097 REMOVE GUARDRAIL LF 14.0000 8,820.00 513.000 7,182 098 REMOVE CONCRETE BARRIER LF 400.0000 4,800.00 0.000 0 099 THERMOPLASTIC PAVEMENT MARKING SQFT 15.0000 83,700.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 100 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 17,380.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 18-12) 101 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 11,000.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) PROGRAM CAS145 PAGE 5 DATE 07/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-151484 TIME 05:09 PM ESTIMATE NO. 004 BID OPENING 01/15/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: NGUYEN, VERNON DATE OF THIS ESTIMATE 07/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 102 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 61,800.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 103 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 420.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 104 8" THERMOPLASTIC TRAFFIC STRIPE LF 4.4000 57,200.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 105 8" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 5,940.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 106 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 10,800.00 0.000 0 107 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 2,450.00 0.000 0 108 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 0.200 1,000 SYSTEM ELEMENTS DURING CONSTRUCTION 109 TEMPORARY LIGHTING SYSTEM LS 206,150.0000 206,150.00 0.200 41,230.00 0.300 61,845 110 TEMPORARY RAMP METERING SYSTEM LS 457,900.0000 457,900.00 0.290 132,791.00 0.340 155,686 111 TEMPORARY SIGNAL SYSTEM (LS) LS 26,220.0000 26,220.00 0.070 1,835 112 MODIFYING EXISTING ELECTRICAL SYSTEM LS 2,117,740.0000 2,117,740.00 0.200 423,548 PROGRAM CAS145 PAGE 6 DATE 07/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-151484 TIME 05:09 PM ESTIMATE NO. 004 BID OPENING 01/15/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: NGUYEN, VERNON DATE OF THIS ESTIMATE 07/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 910,184.00 1,728,244.90 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 19,922.98 19,922.98 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 930,106.98 1,748,167.88 113 MOBILIZATION LS 1,000,000.0000 1,000,000.00 0.250 250,000.00 0.750 750,000 ORIGINAL CONTRACT AMOUNT 10,788,182.95 TOTAL WORK COMPLETED 1,180,106.98 2,498,167.88 MATERIALS ON HAND ON SITE 8,109.75 89,249.75 DEDUCTIONS 0.00 0.00 TOTAL 1,188,216.73 2,587,417.63 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/04/19 130 04/29/19 03/19/19 11/21/19 44 14 0 0 23% 34% PROGRESS IS SATISFACTORY NGUYEN, VERNON RESIDENT ENGINEER PROGRAM CAS145 DATE 07/22/19