PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/21 EST. NO. 001 TIME 08:12 AM R.E. NAME: TUN, YANNAING 04-160304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/21 EST. NO. 001 TIME 08:12 AM R.E. NAME: TUN, YANNAING 04-160304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-160304 TIME 08:12 AM ESTIMATE NO. 001 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: TUN, YANNAING DATE OF THIS ESTIMATE 03/22/21 LOCATION RERUN PROGRESS ESTIMATE 04-ALA-84-13.0/13.6 ----------------------- VIKING CONSTRUCTION COMPANY ALAMEDA CREEK BRIDGE REPLACEMENT 11315 SUNRISE GOLD CIR, STE A PROJECT RANCHO CORDOVA CA 95742 FED. AID NO. ACNH-P084(54)E REPLACE BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 10,000.0000 10,000.00 0.000 0 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 12,000.0000 12,000.00 0.030 360.00 0.030 360 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,800.0000 1,116,000.00 12.000 21,600.00 12.000 21,600 004 DISPUTE RESOLUTION BOARD ON-SITE EA 6,000.0000 84,000.00 0.000 0 MEETING 005 HOURLY OFF-SITE HR 200.0000 4,000.00 5.000 1,000.00 5.000 1,000 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 25,000.0000 25,000.00 0.750 18,750.00 0.750 18,750 007 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.030 1,500.00 0.030 1,500 008 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.5000 5,070.00 0.000 0 009 CHANNELIZER (SURFACE MOUNTED) EA 75.0000 2,400.00 7.000 525.00 7.000 525 010 PORTABLE RADAR SPEED FEEDBACK SIGN LS 5,000.0000 5,000.00 0.030 150.00 0.030 150 SYSTEMS 011 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 15,000.0000 15,000.00 0.030 450.00 0.030 450 012 TEMPORARY RAILING (TYPE K) LF 35.0000 119,700.00 380.000 13,300.00 380.000 13,300 013 TEMPORARY ALTERNATIVE CRASH CUSHION EA 5,000.0000 60,000.00 2.000 10,000.00 2.000 10,000 014 TEMPORARY RADAR SPEED FEEDBACK EA 7,500.0000 15,000.00 2.000 15,000.00 2.000 15,000 SIGN SYSTEM 015 JOB SITE MANAGEMENT LS 2,500.0000 2,500.00 0.030 75.00 0.030 75 016 PREPARE STORM WATER POLLUTION PREVENTION LS 5,000.0000 5,000.00 0.500 2,500.00 0.500 2,500 PLAN 017 RAIN EVENT ACTION PLAN EA 500.0000 48,500.00 4.000 2,000.00 4.000 2,000 018 STORM WATER SAMPLING AND ANALYSIS DAY EA 400.0000 10,800.00 2.000 800.00 2.000 800 019 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 020 TEMPORARY HYDRAULIC MULCH SQYD 1.5000 5,850.00 6,640.000 9,960.00 6,640.000 9,960 (BONDED FIBER MATRIX) 021 TEMPORARY COVER SQYD 35.0000 26,250.00 0.000 0 022 TEMPORARY FIBER ROLL LF 3.0000 5,400.00 400.000 1,200.00 400.000 1,200 PROGRAM CAS145 PAGE 2 DATE 03/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-160304 TIME 08:12 AM ESTIMATE NO. 001 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: TUN, YANNAING DATE OF THIS ESTIMATE 03/22/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY GRAVEL BAG BERM LF 15.0000 4,500.00 0.000 0 024 TEMPORARY REINFORCED SILT FENCE (TYPE 2) LF 5.0000 22,700.00 0.000 0 025 TEMPORARY SILT FENCE LF 3.0000 9,000.00 0.000 0 026 TEMPORARY CONSTRUCTION ENTRANCE EA 6,500.0000 6,500.00 0.000 0 027 TEMPORARY CONSTRUCTION ROADWAY SQYD 225.0000 270,000.00 0.000 0 028 STREET SWEEPING LS 10,000.0000 10,000.00 0.030 300.00 0.030 300 029 TEMPORARY ACTIVE TREATMENT SYSTEM LS 75,000.0000 75,000.00 0.000 0 030 TEMPORARY CONCRETE WASHOUT LS 12,000.0000 12,000.00 0.030 360.00 0.030 360 031 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 500.0000 135,000.00 0.000 0 032 WATER QUALITY MONITORING REPORT EA 150.0000 2,250.00 0.000 0 033 TEMPORARY CREEK DIVERSION SYSTEMS LS 500,000.0000 500,000.00 0.000 0 034 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 6.0000 14,040.00 0.000 0 STRIPE (HAZARDOUS WASTE) 035 WORK AREA MONITORING (BRIDGE) LS 5,000.0000 5,000.00 0.030 150.00 0.030 150 036 TREATED WOOD WASTE LB 0.2500 4,575.00 0.000 0 037 REMOVE CONCRETE (CY) CY 350.0000 171,500.00 0.000 0 038 TEMPORARY HIGH-VISIBILITY FENCE LF 3.0000 28,950.00 6,594.000 19,782.00 6,594.000 19,782 039 TEMPORARY CONSTRUCTION MAT (LS) LS 50,000.0000 50,000.00 0.030 1,500.00 0.030 1,500 040 CLEARING AND GRUBBING (LS) LS 50,000.0000 50,000.00 1.000 50,000.00 1.000 50,000 041 ROADWAY EXCAVATION CY 42.0000 244,020.00 0.000 0 042 CHANNEL EXCAVATION CY 45.0000 168,750.00 0.000 0 043 STRUCTURE EXCAVATION (BRIDGE) CY 100.0000 96,200.00 0.000 0 (F) 044 STRUCTURE EXCAVATION (TYPE D) CY 250.0000 58,750.00 0.000 0 (F) 045 STRUCTURE EXCAVATION (SOIL NAIL WALL) CY 75.0000 41,400.00 0.000 0 (F) 046 STRUCTURE BACKFILL (BRIDGE) CY 100.0000 53,500.00 0.000 0 (F) 047 STRUCTURE BACKFILL (SOIL NAIL WALL) CY 100.0000 6,500.00 0.000 0 (F) 048 IMPORTED BORROW (CY) CY 42.0000 105,000.00 0.000 0 049 EMBANKMENT CONFINEMENT SYSTEM (ECS) CY 500.0000 345,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 03/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-160304 TIME 08:12 AM ESTIMATE NO. 001 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: TUN, YANNAING DATE OF THIS ESTIMATE 03/22/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 ROADSIDE CLEARING LS 10,000.0000 10,000.00 0.000 0 051 CULTIVATION SQYD 0.2500 1,865.00 0.000 0 052 SOIL AMENDMENT CY 50.0000 24,500.00 0.000 0 053 ORGANIC FERTILIZER LB 2.0000 160.00 0.000 0 054 PLANT (GROUP H) EA 10.0000 3,900.00 0.000 0 055 PLANT (GROUP M) EA 25.0000 17,000.00 0.000 0 056 PLANT (GROUP B) EA 20.0000 7,400.00 0.000 0 057 PLANT (GROUP U) EA 35.0000 12,250.00 0.000 0 058 PLANT ESTABLISHMENT WORK LS 65,000.0000 65,000.00 0.000 0 059 WOOD MULCH CY 110.0000 8,140.00 0.000 0 060 FOLIAGE PROTECTOR EA 40.0000 28,800.00 0.000 0 061 2 1/2" WYE STRAINER ASSEMBLY EA 1,400.0000 1,400.00 0.000 0 062 2" GALVANIZED STEEL PIPE LF 75.0000 48,075.00 0.000 0 (F) (SUPPLY LINE ON BRIDGE) 063 RISER SPRINKLER ASSEMBLY EA 20.0000 10,400.00 0.000 0 064 CAM COUPLER ASSEMBLY EA 1,600.0000 1,600.00 0.000 0 065 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 7.0000 45,262.00 0.000 0 (F) LINE) 066 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 8.0000 8,488.00 0.000 0 (F) LINE) 067 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 10.0000 7,420.00 0.000 0 (F) (SUPPLY LINE) 068 2" PLASTIC PIPE (SCHEDULE 40) LF 10.0000 7,340.00 0.000 0 (F) (SUPPLY LINE) 069 2 1/2" PLASTIC PIPE (SCHEDULE 40) LF 15.0000 16,995.00 0.000 0 (F) (SUPPLY LINE) 070 QUICK COUPLING VALVE EA 400.0000 2,400.00 0.000 0 071 CHECK VALVE EA 350.0000 2,100.00 0.000 0 072 BALL VALVE EA 750.0000 7,500.00 0.000 0 073 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 900.0000 5,400.00 1.000 900.00 1.000 900 074 IMPORTED SOIL (BIOFILTRATION SWALE) CY 80.0000 7,200.00 0.000 0 075 DRY SEED (SQFT) SQFT 0.2500 1,625.00 0.000 0 076 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 0.7500 21,750.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 03/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-160304 TIME 08:12 AM ESTIMATE NO. 001 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: TUN, YANNAING DATE OF THIS ESTIMATE 03/22/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 ROLLED EROSION CONTROL PRODUCT (BLANKET) SQFT 0.7500 3,600.00 0.000 0 078 HYDROMULCH SQFT 0.1000 14,800.00 0.000 0 079 FIBER ROLLS LF 3.0000 10,650.00 0.000 0 080 HYDROSEED SQFT 0.1500 22,200.00 0.000 0 081 INCORPORATE MATERIALS SQFT 4.0000 26,000.00 0.000 0 082 CLASS 4 AGGREGATE SUBBASE CY 37.0000 88,430.00 0.000 0 083 CLASS 2 AGGREGATE BASE (CY) CY 54.0000 97,740.00 0.000 0 084 RAPID STRENGTH CONCRETE BASE CY 250.0000 5,000.00 0.000 0 085 PRIME COAT TON 100.0000 490.00 0.000 0 086 HOT MIX ASPHALT (TYPE A) TON 155.0000 347,200.00 0.000 0 087 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 165.0000 189,750.00 0.000 0 088 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 6.0000 2,340.00 0.000 0 089 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 6.0000 3,540.00 0.000 0 090 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 6.0000 1,560.00 0.000 0 091 PLACE HOT MIX ASPHALT SQYD 100.0000 300.00 0.000 0 (MISCELLANEOUS AREA) 092 TACK COAT TON 100.0000 930.00 0.000 0 093 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 10.0000 20,400.00 0.000 0 094 REMOVE BASE AND SURFACING CY 25.0000 59,500.00 0.000 0 095 SOIL NAIL LF 60.0000 442,800.00 0.000 0 096 SOIL NAIL (CORING METHOD) LF 70.0000 186,200.00 0.000 0 097 30" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 250.0000 43,750.00 0.000 0 098 66" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 350.0000 7,700.00 0.000 0 099 30" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 400.0000 324,000.00 0.000 0 (ROCK SOCKET) 100 66" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 1,000.0000 57,000.00 0.000 0 (ROCK SOCKET) 101 120" CAST-IN-DRILLED-HOLE CONCRETE LF 6,500.0000 1,794,000.00 0.000 0 PILING (ROCK SOCKET) 102 PRESTRESSING CAST-IN-PLACE CONCRETE LS 120,000.0000 120,000.00 0.000 0 103 PRECAST CONCRETE BAT HOUSE EA 2,000.0000 8,000.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 03/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-160304 TIME 08:12 AM ESTIMATE NO. 001 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: TUN, YANNAING DATE OF THIS ESTIMATE 03/22/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 900.0000 76,500.00 0.000 0 (F) 105 STRUCTURAL CONCRETE, BRIDGE CY 1,210.0000 1,599,620.00 0.000 0 (F) 106 STRUCTURAL CONCRETE, BRIDGE CY 1,230.0000 1,216,470.00 0.000 0 (F) (POLYMER FIBER) 107 STRUCTURAL CONCRETE, APPROACH SLAB CY 900.0000 83,700.00 0.000 0 (F) (TYPE N) 108 STRUCTURAL CONCRETE, APPROACH SLAB CY 900.0000 25,200.00 0.000 0 (F) (TYPE N MODIFIED) 109 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1,800.0000 70,740.00 0.000 0 (F) 110 MINOR CONCRETE CY 1,000.0000 23,000.00 0.000 0 (F) 111 JOINT SEAL (MR 1") LF 200.0000 4,400.00 0.000 0 112 JOINT SEAL ASSEMBLY (MR 4") LF 250.0000 21,250.00 0.000 0 (MODIFIED) 113 BAR REINFORCING STEEL (BRIDGE) LB 1.0000 1,314,467.00 0.000 0 (F) 114 BAR REINFORCING STEEL (RETAINING WALL) LB 1.0000 25,845.00 0.000 0 (F) 115 BAR REINFORCING STEEL (BRIDGE) LB 6.0000 10,020.00 0.000 0 (F) (STAINLESS) 116 HEADED BAR REINFORCEMENT EA 13.0000 15,678.00 0.000 0 (F) 117 STRUCTURAL SHOTCRETE CY 800.0000 232,000.00 0.000 0 (F) 118 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.5000 13,950.00 0.000 0 119 FURNISH POLYESTER CONCRETE OVERLAY CF 82.0000 190,650.00 0.000 0 120 PLACE POLYESTER CONCRETE OVERLAY SQFT 3.0000 83,700.00 0.000 0 (F) 121 BRIDGE REMOVAL LS 300,000.0000 300,000.00 0.000 0 122 18" ALTERNATIVE PIPE CULVERT LF 175.0000 224,000.00 0.000 0 123 18" SLOTTED CORRUGATED STEEL PIPE LF 310.0000 111,600.00 0.000 0 (.064" THICK) 124 6" PERFORATED PLASTIC PIPE UNDERDRAIN LF 200.0000 80,000.00 0.000 0 (F) 125 CLASS 1 PERMEABLE MATERIAL (BLANKET) CY 200.0000 10,000.00 0.000 0 126 10" WELDED STEEL PIPE CASING (BRIDGE) LF 300.0000 12,000.00 0.000 0 127 24" WELDED STEEL PIPE CASING (BRIDGE) LF 350.0000 14,000.00 0.000 0 128 18" ALTERNATIVE FLARED END SECTION EA 2,200.0000 2,200.00 0.000 0 129 ABANDON CULVERT (LF) LF 50.0000 21,000.00 0.000 0 130 ABANDON INLET EA 2,500.0000 17,500.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 03/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-160304 TIME 08:12 AM ESTIMATE NO. 001 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: TUN, YANNAING DATE OF THIS ESTIMATE 03/22/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 131 REMOVE CULVERT (LF) LF 75.0000 9,000.00 0.000 0 132 REMOVE HEADWALL EA 5,000.0000 5,000.00 0.000 0 133 SAND BACKFILL CY 350.0000 9,800.00 0.000 0 134 REMOVE SLOPE PAVING (SQYD) SQYD 600.0000 56,400.00 0.000 0 135 ROCK SLOPE PROTECTION (FACING, METHOD B) TON 1,500.0000 3,600.00 0.000 0 (TON) 136 CONCRETE (CONCRETE APRON) CY 2,500.0000 750.00 0.000 0 137 SLOPE PAVING (CONCRETE) CY 3,200.0000 28,800.00 0.000 0 138 ROCK SLOPE PROTECTION CY 200.0000 34,000.00 0.000 0 (300 LB, CLASS IV, METHOD B) (CY) 139 ROCK GROUP A, PLACEMENT METHOD A CY 75.0000 16,500.00 0.000 0 140 ROCK GROUP B, PLACEMENT METHOD A CY 75.0000 33,000.00 0.000 0 141 ROCK GROUP C, PLACEMENT METHOD A CY 75.0000 12,750.00 0.000 0 142 ESM-1 (CLASS III RSP), PLACEMENT METHOD CY 60.0000 98,400.00 0.000 0 B 143 ESM-2, JETTING CY 60.0000 43,200.00 0.000 0 144 ROCK SLOPE PROTECTION CY 500.0000 1,000.00 0.000 0 (20 LB, CLASS I, METHOD B) (CY) 145 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 10.0000 210.00 0.000 0 146 MISCELLANEOUS IRON AND STEEL LB 3.0000 17,103.00 0.000 0 (F) 147 ISOLATION CASING LB 12.0000 106,728.00 0.000 0 (F) 148 MISCELLANEOUS METAL (BRIDGE) LB 18.0000 22,284.00 0.000 0 (F) 149 BRIDGE DECK DRAINAGE SYSTEM LB 30.0000 40,830.00 0.000 0 (F) 150 STAIN GALVANIZED SURFACES (LS) LS 20,000.0000 20,000.00 0.000 0 151 STAIN GALVANIZED SURFACES (LF) LF 40.0000 52,360.00 0.000 0 152 REMOVE FENCE LF 20.0000 10,200.00 0.000 0 153 REMOVE GATE EA 500.0000 500.00 0.000 0 154 REMOVE PAVEMENT MARKER EA 6.0000 1,800.00 0.000 0 155 REMOVE DELINEATOR EA 15.0000 1,395.00 0.000 0 156 DELINEATOR (CLASS 1) EA 50.0000 2,600.00 0.000 0 157 GUARD RAILING DELINEATOR EA 35.0000 735.00 0.000 0 PROGRAM CAS145 PAGE 7 DATE 03/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-160304 TIME 08:12 AM ESTIMATE NO. 001 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: TUN, YANNAING DATE OF THIS ESTIMATE 03/22/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 158 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 1,380.00 0.000 0 159 REMOVE MARKER EA 20.0000 600.00 0.000 0 160 REMOVE ROADSIDE SIGN EA 100.0000 1,500.00 0.000 0 161 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 30.0000 1,050.00 0.000 0 (0.063"-UNFRAMED) 162 ROADSIDE SIGN - ONE POST EA 350.0000 1,400.00 0.000 0 163 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 30.0000 45,900.00 0.000 0 164 VEGETATION CONTROL (MINOR CONCRETE) SQYD 100.0000 59,000.00 0.000 0 165 CONCRETE BARRIER MARKER EA 50.0000 250.00 0.000 0 166 TRANSITION RAILING (TYPE WB-31) EA 6,500.0000 19,500.00 0.000 0 167 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,500.0000 9,000.00 0.000 0 168 SEVERE DUTY CRASH CUSHION EA 50,000.0000 100,000.00 0.000 0 169 CONCRETE BARRIER (TYPE 60MC) LF 315.0000 88,200.00 0.000 0 170 CALIFORNIA ST-75 BRIDGE RAIL LF 285.0000 379,620.00 0.000 0 (F) (MODIFIED) 171 CONCRETE BARRIER TRANSITION LF 315.0000 12,600.00 0.000 0 (F) 172 CONCRETE BARRIER (TYPE 60MD MODIFIED) LF 135.0000 47,790.00 0.000 0 173 REMOVE GUARDRAIL LF 12.0000 16,920.00 0.000 0 174 REMOVE CONCRETE BARRIER LF 110.0000 96,800.00 0.000 0 175 REMOVE CONCRETE BARRIER (TYPE K) LF 45.0000 4,500.00 0.000 0 176 THERMOPLASTIC TRAFFIC STRIPE LF 1.7500 18,900.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 177 THERMOPLASTIC PAVEMENT MARKING SQFT 50.0000 600.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 178 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 4,680.00 0.000 0 179 6" RUMBLE STRIP STA 30.0000 1,020.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 180 12" RUMBLE STRIP STA 32.0000 736.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 181 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 182 OBJECT MARKER (TYPE P) EA 50.0000 400.00 0.000 0 PROGRAM CAS145 PAGE 8 DATE 03/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-160304 TIME 08:12 AM ESTIMATE NO. 001 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: TUN, YANNAING DATE OF THIS ESTIMATE 03/22/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 172,162.00 172,162.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 172,162.00 172,162.00 183 MOBILIZATION LS 1,740,000.0000 1,740,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 17,456,236.00 TOTAL WORK COMPLETED 172,162.00 172,162.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 172,162.00 172,162.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/15/20 620 02/08/21 02/08/21 08/24/23 12 16 0 0 1% 2% PROGRESS IS SATISFACTORY TUN, YANNAING RESIDENT ENGINEER PROGRAM CAS145 DATE 03/22/21