PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/21/06 EST. NO.08 TIME 10:29 AM R.E. NAME: KAMRAN ABOLFAZLIAN 04-162004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 985.40 E.W. @ F.A.(+) 011806 N 0001.0 0002 736.11 011706 N 0003.0 005 0001 635.08 E.W. @ F.A.(+) 112105 N 0002.0 0003 993.09 111005 N 0010.0 0004 4,489.85 111205 N 0012.0 0005 779.63 111705 N 0013.0 0006 1,480.40 101105 N 11.1 0 0007 845.39 110105 N 8.1 0 0008 552.86 111405 N 4.1 0 0009 930.02 102605 N 9.1 0 0010 2,268.97 112105 N 7.1 0 007 0001 45,092.22 A.C. @ L.S.(+) 031706 N 0001 0 010 0001 6,500.00 E.W. @ L.S.(+) 031706 N 0001 0 011 0001 10,700.00 A.C. @ L.S.(+) 031706 N 0001 0 012 0001 6,200.00 E.W. @ L.S.(+) 031706 N 0001 0 83,189.02 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 83,189.02 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/21/06 EST. NO.08 TIME 10:29 AM R.E. NAME: KAMRAN ABOLFAZLIAN 04-162004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/21/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-162004 TIME 10:29 AM ESTIMATE NO. 08 BID OPENING 05/25/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: KAMRAN ABOLFAZLIAN DATE OF THIS ESTIMATE 03/21/06 LOCATION RERUN PROGRESS ESTIMATE 04-ALA-580-45.8/46.9 ----------------------- R G W CONSTRUCTION INC IN ALAMEDA COUNTY IN OAKLAND FROM 550 GREENVILLE RD 0.3 KM MACARTHUR BOULEVARD ON RAMP LIVERMORE CA 94550-8390 TO DISTRIBUTION STRUCTURE FED. AID NO. ER-1597(4)E CONSTRUCT NEW BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 8,000.0000 8,000.00 0.100 800.00 0.700 5,600.00 02 TIME-RELATED OVERHEAD LS 400,000.0000 400,000.00 0.098 39,200.00 0.746 298,400.00 03 TEMPORARY FENCE M 16.0000 5,200.00 325.000 5,200.00 04 PREPARE STORM WATER POLLUTION LS 2,500.0000 2,500.00 0.900 2,250.00 PREVENTION PLAN 05 WATER POLLUTION CONTROL LS 12,000.0000 12,000.00 0.300 3,600.00 1.000 12,000.00 06 NON-STORM WATER DISCHARGES LS 65,000.0000 65,000.00 0.000 0.00 07 TEMPORARY MULCH M3 10.0000 7,850.00 0.000 0.00 08 TEMPORARY CONCRETE WASHOUT FACILITY EA 2,500.0000 12,500.00 3.000 7,500.00 09 TEMPORARY CONSTRUCTION ENTRANCE EA 3,000.0000 6,000.00 1.000 3,000.00 10 CONSTRUCTION AREA SIGNS LS 5,500.0000 5,500.00 0.700 3,850.00 S) 11 TRAFFIC CONTROL SYSTEM LS 57,000.0000 57,000.00 0.500 28,500.00 S) 12 TYPE III BARRICADE EA 90.0000 180.00 5.000 450.00 S) 13 CHANNELIZER (SURFACE MOUNTED) EA 25.0000 4,300.00 79.000 1,975.00 S) 14 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 15 PORTABLE CHANGEABLE MESSAGE SIGN EA 2,560.0000 10,240.00 2.000 5,120.00 S) 16 TEMPORARY RAILING (TYPE K) M 80.0000 50,720.00 662.000 52,960.00 S) 17 TEMPORARY CRASH CUSHION MODULE EA 2,400.0000 9,600.00 3.000 7,200.00 S) 18 TEMPORARY TRAFFIC SCREEN M 28.0000 13,160.00 457.000 12,796.00 19 REMOVE METAL BEAM GUARD RAILING M 50.0000 4,000.00 77.000 3,850.00 20 REMOVE PAVEMENT MARKING M2 100.0000 1,000.00 5.480 548.00 21 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 2.0000 5,600.00 1,723.580 3,447.16 22 REMOVE ROADSIDE SIGN EA 75.0000 150.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 03/21/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-162004 TIME 10:29 AM ESTIMATE NO. 08 BID OPENING 05/25/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: KAMRAN ABOLFAZLIAN DATE OF THIS ESTIMATE 03/21/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 24 REMOVE INLET EA 1,000.0000 3,000.00 2.000 2,000.00 3.000 3,000.00 25 REMOVE WALL M 270.0000 43,200.00 157.000 42,390.00 26 SALVAGE METAL BRIDGE RAILING M 50.0000 23,650.00 473.000 23,650.00 27 RECONSTRUCT FENCE M 165.0000 24,750.00 75.000 12,375.00 28 RELOCATE ROADSIDE SIGN (METAL POST) EA 120.0000 120.00 0.000 0.00 29 REMOVE GRATE EA 87.0000 261.00 1.000 87.00 30 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 6.0000 9,600.00 1,600.000 9,600.00 S) 31 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 32 BRIDGE REMOVAL (PORTION) LS 100,000.0000 100,000.00 1.000 100,000.00 33 CLEARING AND GRUBBING LS 40,000.0000 40,000.00 1.000 40,000.00 34 ROADWAY EXCAVATION M3 120.0000 7,200.00 565.000 67,800.00 35 ROADWAY EXCAVATION (TYPE R) M3 10.0000 12,500.00 1,250.000 12,500.00 36 STRUCTURE EXCAVATION (TYPE DH) M3 126.0000 190,260.00 1,404.000 176,904.00 F) 37 STRUCTURE BACKFILL (BRIDGE) M3 98.0000 59,290.00 567.500 55,615.00 F) 38 DITCH EXCAVATION M3 110.0000 2,750.00 0.000 0.00 39 IMPORTED BORROW TONN 15.0000 49,950.00 366.000 5,490.00 40 WASTE DISPOSAL (CLASS 1) TONN 75.0000 40,500.00 256.480 19,236.00 256.480 19,236.00 41 HAZARDOUS MATERIALS MANAGEMENT REPORT EA 1,350.0000 1,350.00 0.000 0.00 42 HEALTH, SAFETY AND WORK PLAN LS 4,500.0000 4,500.00 1.000 4,500.00 43 HAZARDOUS MATERIALS MANAGEMENT PLAN LS 1,350.0000 1,350.00 0.800 1,080.00 44 ASBESTOS SURVEY LS 4,260.0000 4,260.00 1.000 4,260.00 45 AIR QUALITY PROGRAM LS 10,395.0000 10,395.00 0.750 7,796.25 46 STRAW (EROSION CONTROL) TONN 715.0000 1,716.00 0.000 0.00 S) 47 FIBER (EROSION CONTROL) KG 2.0000 722.00 0.000 0.00 S) 48 COMPOST (EROSION CONTROL) M3 600.0000 1,380.00 0.000 0.00 S) 49 PURE LIVE SEED (EROSION CONTROL) KG 80.0000 5,120.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 03/21/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-162004 TIME 10:29 AM ESTIMATE NO. 08 BID OPENING 05/25/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: KAMRAN ABOLFAZLIAN DATE OF THIS ESTIMATE 03/21/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 STABILIZING EMULSION (EROSION CONTROL) KG 5.0000 365.00 0.000 0.00 S) 51 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 52 ASPHALT CONCRETE (TYPE A) TONN 80.0000 57,600.00 0.000 0.00 53 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 54 PAVEMENT REINFORCING FABRIC M2 4.0000 6,480.00 0.000 0.00 55 ASPHALTIC EMULSION (PAINT BINDER) TONN 614.0000 1,842.00 0.000 0.00 56 2.1 M CAST-IN-DRILLED-HOLE CONCRETE M 3,200.0000 499,200.00 148.000 473,600.00 S) PILING 57 FURNISH PILING (CLASS 900C) M 60.0000 422,340.00 7,039.000 422,340.00 (ALT "X" MODIFIED) 58 DRIVE PILE (CLASS 900C) EA 1,225.0000 537,775.00 414.000 507,150.00 S) (ALT "X" MODIFIED) 59 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 270.0000 237,600.00 823.000 222,210.00 F) 60 STRUCTURAL CONCRETE, BRIDGE M3 815.0000 1,255,100.00 130.000 105,950.00 866.000 705,790.00 F) 61 MINOR CONCRETE (MINOR STRUCTURE) M3 2,000.0000 24,000.00 0.000 0.00 F) 62 FURNISH PRECAST PRESTRESSED CONCRETE EA 7,600.0000 319,200.00 40.000 304,000.00 GIRDER (15 M - 20 M) 63 FURNISH PRECAST PRESTRESSED CONCRETE EA 11,000.0000 286,000.00 26.000 286,000.00 GIRDER (20 M - 25 M) 64 ERECT PRECAST PRESTRESSED CONCRETE EA 600.0000 40,800.00 66.000 39,600.00 S) GIRDER 65 REFINISH BRIDGE DECK M2 100.0000 28,500.00 0.000 0.00 66 JOINT SEAL (MR 30 MM) M 95.0000 10,450.00 0.000 0.00 S) 67 BAR REINFORCING STEEL (BRIDGE) KG 1.8000 1,036,800.00 40,942.000 73,695.60 432,542.000 778,575.60 SF) 68 ROADSIDE SIGN - ONE POST EA 250.0000 1,250.00 0.000 0.00 69 ROADSIDE SIGN - TWO POST EA 350.0000 350.00 0.000 0.00 70 CONCRETE (DITCH LINING) M3 800.0000 18,400.00 0.000 0.00 71 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 72 MISCELLANEOUS IRON AND STEEL KG 3.0000 1,926.00 0.000 0.00 F) 73 INLET GRATE EA 1,500.0000 4,500.00 0.000 0.00 S) 74 MISCELLANEOUS METAL KG 16.0000 28,800.00 600.000 9,600.00 1,500.000 24,000.00 SF)(RESTRAINER - CABLE TYPE) 75 MISCELLANEOUS METAL (BRIDGE) KG 18.0000 109,800.00 1,500.000 27,000.00 4,500.000 81,000.00 SF) 76 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 PROGRAM CAS145 PAGE 4 DATE 03/21/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-162004 TIME 10:29 AM ESTIMATE NO. 08 BID OPENING 05/25/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: KAMRAN ABOLFAZLIAN DATE OF THIS ESTIMATE 03/21/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 BARRIER DELINEATOR EA 30.0000 1,950.00 0.000 0.00 78 METAL RAILING M 250.0000 25,000.00 0.000 0.00 SF) 79 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 80 CONCRETE BARRIER (TYPE 60) M 350.0000 4,200.00 0.000 0.00 81 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 82 CONCRETE BARRIER (TYPE 60 A MODIFIED) M 350.0000 65,100.00 0.000 0.00 F) 83 CONCRETE BARRIER (TYPE 60C) M 675.0000 28,350.00 0.000 0.00 84 CONCRETE BARRIER (TYPE 732) M 200.0000 92,000.00 0.000 0.00 F) 85 CONCRETE BARRIER (TYPE 732A MODIFIED) M 325.0000 52,000.00 0.000 0.00 F) 86 THERMOPLASTIC PAVEMENT MARKING M2 45.0000 1,035.00 2.800 126.00 S) 87 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 3,400.00 0.000 0.00 S) 88 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 89 200 MM THERMOPLASTIC TRAFFIC STRIPE M 3.0000 2,280.00 0.000 0.00 S) 90 PAVEMENT MARKER (NON-REFLECTIVE TYPE A) EA 5.0000 1,000.00 0.000 0.00 S) 91 PAVEMENT MARKER (REFLECTIVE-SPECIAL EA 7.0000 602.00 0.000 0.00 S) TYPE H) 92 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 7.0000 434.00 0.000 0.00 S) TYPE C) 93 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 7.0000 749.00 0.000 0.00 S) TYPE G) 94 LIGHTING (STAGE CONSTRUCTION) LS 48,000.0000 48,000.00 0.750 36,000.00 S) 95 LIGHTING AND SIGN ILLUMINATION LS 70,000.0000 70,000.00 0.000 0.00 S) 96 TRAFFIC OPERATIONS SYSTEM LS 215,000.0000 215,000.00 0.600 129,000.00 S) 97 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 98 EXTINGUISHABLE MESSAGE SIGN PANEL (LED) EA 45,000.0000 135,000.00 0.000 0.00 S) 99 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 00 REMOVE ASPHALT CONCRETE M3 129.0000 3,354.00 26.000 3,354.00 26.000 3,354.00 01 REMOVE REINFORCED CONCRETE PIPE M 170.0000 3,230.00 18.000 3,060.00 02 MINOR CONCRETE BACKFILL M3 185.0000 370.00 2.000 370.00 03 SHOTCRETE M3 2,000.0000 2,000.00 0.000 0.00 F) PROGRAM CAS145 PAGE 5 DATE 03/21/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-162004 TIME 10:29 AM ESTIMATE NO. 08 BID OPENING 05/25/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: KAMRAN ABOLFAZLIAN DATE OF THIS ESTIMATE 03/21/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 300 MM PLASTIC PIPE M 815.0000 2,445.00 0.000 0.00 05 CHAIN LINK FENCE (TYPE CL-1.8) M 66.0000 24,090.00 0.000 0.00 06 OBJECT MARKER (TYPE P) EA 75.0000 150.00 0.000 0.00 07 OBJECT MARKER (TYPE R) EA 75.0000 75.00 0.000 0.00 08 CRASH CUSHION (ADIEM) EA 44,000.0000 44,000.00 0.000 0.00 09 THERMOPLASTIC TRAFFIC STRIPE M 2.0000 4,600.00 1,018.800 2,037.60 S) (SPRAYABLE) 10 LONG LEAD-IN CABLE LOOP DETECTOR EA 500.0000 500.00 0.000 0.00 S) SENSOR UNIT 11 GENERAL PACKET RADIO SYSTEM EA 10,000.0000 10,000.00 0.000 0.00 S) 12 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 13 CONCRETE BARRIER (TYPE 60A) M 240.0000 31,200.00 0.000 0.00 F) PROGRAM CAS145 PAGE 6 DATE 03/21/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-162004 TIME 10:29 AM ESTIMATE NO. 08 BID OPENING 05/25/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: KAMRAN ABOLFAZLIAN DATE OF THIS ESTIMATE 03/21/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 284,435.60 5,059,142.61 ADJUSTMENT OF COMPENSATION 55,792.22 55,792.22 EXTRA WORK 27,396.80 27,396.80 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 367,624.62 5,142,331.63 14 MOBILIZATION LS 700,000.0000 700,000.00 1.000 700,000.00 ORIGINAL CONTRACT AMOUNT 7,819,516.00 TOTAL WORK COMPLETED 367,624.62 5,842,331.63 MATERIALS ON HAND ON SITE 13,813.13 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 367,624.62 5,856,144.76 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/20/05 205 08/08/05 08/04/05 06/26/06 143 11 0 5 73% 67% PROGRESS IS SATISFACTORY KAMRAN ABOLFAZLIAN RESIDENT ENGINEER PROGRAM CAS145 PAGE 6 DATE 03/21/06