PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/18/15 EST. NO. 001 TIME 02:11 PM R.E. NAME: ABDI, ABDOLREZA 04-1637N4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/18/15 EST. NO. 001 TIME 02:11 PM R.E. NAME: ABDI, ABDOLREZA 04-1637N4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/18/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1637N4 TIME 02:11 PM ESTIMATE NO. 001 BID OPENING 03/12/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/15 R.E. NAME: ABDI, ABDOLREZA DATE OF THIS ESTIMATE 06/18/15 LOCATION RERUN PROGRESS ESTIMATE 04-SF-101-9.0/ .0 ----------------------- POWER ENGINEERING CONSTRUCTION IN THE CITY AND COUNTY OF SAN COMPANY FRANCISCO AT CRISSY FIELD 1501 VIKING STEET SUITE 200 ALAMEDA CA 94501 FED. AID NO. NHP-X075(45)N MODIFY & EXTEND STORM DRAIN OUTFALL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,000.0000 3,000.00 0.800 2,400.00 0.800 2,400 002 TEMPORARY TIMBER CONSTRUCTION MAT SQYD 0.0100 74.00 0.000 0 003 CONSTRUCTION AREA SIGNS LS 5,500.0000 5,500.00 0.900 4,950.00 0.900 4,950 004 TRAFFIC CONTROL SYSTEM LS 39,000.0000 39,000.00 0.400 15,600.00 0.400 15,600 005 JOB SITE MANAGEMENT LS 356,000.0000 356,000.00 0.400 142,400.00 0.400 142,400 006 PREPARE STORM WATER POLLUTION PREVENTION LS 3,100.0000 3,100.00 1.000 3,100.00 1.000 3,100 PLAN 007 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 008 TEMPORARY COVER SQYD 3.6800 18,400.00 0.500 1.84 0.500 1 009 TEMPORARY DRAINAGE INLET PROTECTION EA 925.0000 3,700.00 0.900 832.50 0.900 832 010 TURBIDITY CONTROL LS 31,000.0000 31,000.00 0.400 12,400.00 0.400 12,400 011 TEMPORARY SILT FENCE LF 0.0100 10.00 0.000 0 012 TEMPORARY CONSTRUCTION ENTRANCE EA 0.0100 0.02 0.000 0 013 STREET SWEEPING LS 10,750.0000 10,750.00 0.400 4,300.00 0.400 4,300 014 TEMPORARY DIVERSION SYSTEM EA 31,000.0000 62,000.00 0.000 0 015 TEMPORARY FENCE (TYPE ESA) LF 0.0100 28.00 0.000 0 016 AIR BUBBLE CURTAIN SYSTEM LS 42,000.0000 42,000.00 0.500 21,000.00 0.500 21,000 017 REMOVE IRRIGATION FACILITY LS 0.0100 0.01 0.000 0 018 REMOVE PIPE (LF) LF 120.5900 20,500.30 125.000 15,073.75 125.000 15,073 019 SALVAGE IRRIGATION FACILITY LS 0.0100 0.01 0.000 0 020 ADJUST VALVE BOX FRAME AND COVER TO EA 0.0100 0.08 0.000 0 GRADE 021 MODIFY MANHOLE EA 10,000.0000 10,000.00 0.950 9,500.00 0.950 9,500 022 MARINE DREDGING LS 1,184,532.4400 1,184,532.44 0.650 769,946.09 0.650 769,946 PROGRAM CAS145 PAGE 2 DATE 06/18/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1637N4 TIME 02:11 PM ESTIMATE NO. 001 BID OPENING 03/12/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/15 R.E. NAME: ABDI, ABDOLREZA DATE OF THIS ESTIMATE 06/18/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ROADSIDE CLEARING LS 12,000.0000 12,000.00 0.500 6,000.00 0.500 6,000 024 CULTIVATION SQYD 0.0100 58.10 0.000 0 025 ORGANIC FERTILIZER LB 0.0100 3.20 0.000 0 026 SOD SQYD 0.0100 58.10 0.000 0 027 PLANT ESTABLISHMENT WORK LS 0.0100 0.01 0.000 0 028 CHECK AND TEST EXISTING IRRIGATION LS 0.0100 0.01 0.000 0 FACILITIES 029 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 0.0100 0.18 0.000 0 030 REPLACE VALVE BOX COVER EA 0.0100 0.08 0.000 0 031 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 0.0100 20.00 0.000 0 LINE) 032 3" PLASTIC PIPE (CLASS 315) LF 0.0100 0.70 0.000 0 (SUPPLY LINE) 033 IMPORTED TOPSOIL (CY) CY 0.0100 5.10 0.000 0 034 COMPOST SQFT 0.0100 523.00 0.000 0 035 DRIVE 13" HDPE PILING EA 4,350.0000 104,400.00 12.000 52,200.00 12.000 52,200 036 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 35.7500 1,144.00 0.000 0 (0.125"-UNFRAMED) 037 INSTALL UNFRAMED SIGN PANEL EA 3,975.0000 7,950.00 0.000 0 038 INSTALL 54" SOLID WALL HDPE PIPE LF 735.0000 338,100.00 175.000 128,625.00 175.000 128,625 039 MISCELLANEOUS IRON AND STEEL LB 2.5900 1,126.65 435.000 1,126.65 435.000 1,126 (F) 040 TEMPORARY FENCE (TYPE CL-6) LF 0.0100 16.30 0.000 0 041 TEMPORARY 16' CHAIN LINK GATE EA 0.0100 0.01 0.000 0 (TYPE CL-6) PROGRAM CAS145 PAGE 3 DATE 06/18/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1637N4 TIME 02:11 PM ESTIMATE NO. 001 BID OPENING 03/12/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/15 R.E. NAME: ABDI, ABDOLREZA DATE OF THIS ESTIMATE 06/18/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,189,455.83 1,189,455.83 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,189,455.83 1,189,455.83 042 MOBILIZATION LS 160,000.0000 160,000.00 1.000 160,000.00 1.000 160,000 ORIGINAL CONTRACT AMOUNT 2,417,000.30 TOTAL WORK COMPLETED 1,349,455.83 1,349,455.83 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,349,455.83 1,349,455.83 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/02/15 220 04/06/15 05/15/15 11/20/15 23 0 0 0 56% 10% PROGRESS IS SATISFACTORY ABDI, ABDOLREZA RESIDENT ENGINEER PROGRAM CAS145 DATE 06/18/15