PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/21/14 EST. NO. 004 TIME 02:36 PM R.E. NAME: VALEH, SYD 04-1A2904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 2,175.24 E.W. @ F.A.(+) 080514 N 0023.0 2,175.24 TOTAL THIS ESTIMATE 15,450.58 TOTAL PREVIOUS ESTIMATE 17,625.82 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/21/14 EST. NO. 004 TIME 02:36 PM R.E. NAME: VALEH, SYD 04-1A2904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE NO MOBILIZATION PYMT -280,000.00 001 RELEASING 50% MOB 140,000.00 003 0.00 -140,000.00 TOTAL DEDUCTIONS 0.00 -140,000.00 PROGRAM CAS145 PAGE 1 DATE 11/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1A2904 TIME 02:36 PM ESTIMATE NO. 004 BID OPENING 01/08/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/14 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 11/21/14 LOCATION RERUN PROGRESS ESTIMATE 04-SON-12-9.6/ .0 ----------------------- GHILOTTI CONSTRUCTION COMPANY IN SONOMA COUNTY NEAR SEBASTOPOL ON INC ROUTE 12 AT LAGUNA DE SANTA ROSA SAID NAJAFI BRIDGE NO. 20-0035 230 KERNER BLVD, SUITE E SAN RAFAEL, CA 94901-5567 FED. AID NO. STP-P012(113)E REPLACE BRIDGE FOR SCOUR ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 0.000 0 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,000.0000 3,000.00 0.000 0 003 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 004 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.000 0 005 TRAFFIC CONTROL SYSTEM LS 25,000.0000 25,000.00 0.000 0 006 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 2.5000 217.50 0.000 0 007 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.5000 5,700.00 0.000 0 008 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 4,200.00 0.000 0 009 TEMPORARY PAVEMENT MARKER EA 4.0000 1,000.00 0.000 0 010 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 8,000.0000 16,000.00 0.000 0 011 TEMPORARY RAILING (TYPE K) LF 10.0000 44,200.00 0.000 0 012 TEMPORARY CRASH CUSHION EA 1,200.0000 9,600.00 0.000 0 013 TEMPORARY TRAFFIC SCREEN LF 5.0000 3,000.00 0.000 0 014 JOB SITE MANAGEMENT LS 45,000.0000 45,000.00 0.000 0 015 PREPARE STORM WATER POLLUTION PREVENTION LS 3,000.0000 3,000.00 0.000 0 PLAN 016 RAIN EVENT ACTION PLAN EA 500.0000 32,500.00 0.000 0 017 STORM WATER SAMPLING AND ANALYSIS DAY EA 300.0000 9,600.00 0.000 0 018 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 100.0000 17,000.00 0.000 0 019 WATER QUALITY MONITORING REPORT EA 300.0000 3,000.00 0.000 0 020 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 021 TEMPORARY HYDRAULIC MULCH SQYD 1.0000 9,250.00 0.000 0 (BONDED FIBER MATRIX) 022 TEMPORARY COVER SQYD 1.0000 1,500.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 11/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1A2904 TIME 02:36 PM ESTIMATE NO. 004 BID OPENING 01/08/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/14 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 11/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY CHECK DAM LF 7.0000 840.00 0.000 0 024 TEMPORARY DRAINAGE INLET PROTECTION EA 125.0000 500.00 0.000 0 025 TEMPORARY CREEK DIVERSION SYSTEM LS 60,000.0000 60,000.00 0.000 0 (LOCATION 1) 026 TEMPORARY CREEK DIVERSION SYSTEM LS 60,000.0000 60,000.00 0.000 0 (LOCATION 2) 027 TEMPORARY FIBER ROLL LF 5.0000 10,700.00 0.000 0 028 TEMPORARY GRAVEL BAG BERM LF 12.0000 12,000.00 0.000 0 029 TEMPORARY REINFORCED SILT FENCE LF 5.0000 19,950.00 0.000 0 030 TEMPORARY CONSTRUCTION ENTRANCE EA 2,500.0000 10,000.00 0.000 0 031 TEMPORARY CONSTRUCTION ROADWAY SQYD 10.0000 55,300.00 0.000 0 032 TEMPORARY GROUND PROTECTION MAT SQYD 55.0000 69,300.00 0.000 0 033 STREET SWEEPING LS 1,000.0000 1,000.00 0.000 0 034 TEMPORARY ACTIVE TREATMENT SYSTEM LS 30,000.0000 30,000.00 0.000 0 035 TEMPORARY CONCRETE WASHOUT LS 6,000.0000 6,000.00 0.000 0 036 TEMPORARY FENCE (TYPE ESA) LF 5.0000 6,550.00 0.000 0 037 TREATED WOOD WASTE LB 0.1000 1,030.00 0.000 0 038 REMOVE FENCE LF 10.0000 3,400.00 0.000 0 039 REMOVE METAL BEAM GUARD RAILING LF 13.0000 9,100.00 0.000 0 040 REMOVE PAINTED TRAFFIC STRIPE LF 0.3500 1,610.00 0.000 0 041 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.3500 2,870.00 0.000 0 042 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 116.00 0.000 0 043 REMOVE PAVEMENT MARKER EA 1.0000 290.00 0.000 0 044 REMOVE CURB LF 10.0000 4,800.00 0.000 0 045 REMOVE CULVERT (LF) LF 20.0000 8,800.00 0.000 0 046 REMOVE INLET EA 750.0000 3,000.00 0.000 0 047 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 5.0000 9,850.00 0.000 0 048 CAP INLET EA 1,500.0000 1,500.00 0.000 0 049 BRIDGE REMOVAL LS 120,000.0000 120,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 11/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1A2904 TIME 02:36 PM ESTIMATE NO. 004 BID OPENING 01/08/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/14 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 11/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 CLEARING AND GRUBBING (LS) LS 25,000.0000 25,000.00 0.000 0 051 ROADWAY EXCAVATION CY 60.0000 80,400.00 0.000 0 052 ROADWAY EXCAVATION (TYPE Z-2) CY 230.0000 32,200.00 0.000 0 (AERIALLY DEPOSITED LEAD) 053 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 054 STRUCTURE EXCAVATION (TYPE A) CY 250.0000 162,500.00 0.000 0 (F) 055 STRUCTURE EXCAVATION (TYPE D) CY 50.0000 1,250.00 0.000 0 (F) 056 STRUCTURE EXCAVATION (RETAINING WALL) CY 70.0000 54,880.00 0.000 0 (F) 057 STRUCTURE EXCAVATION CY 250.0000 220,750.00 0.000 0 (F) (RETAINING WALL TYPE A) 058 STRUCTURE BACKFILL (BRIDGE) CY 400.0000 52,000.00 0.000 0 (F) 059 STRUCTURE BACKFILL (RETAINING WALL) CY 80.0000 146,320.00 0.000 0 (F) 060 IMPORTED BORROW (CY) CY 7.0000 4,200.00 0.000 0 061 SOIL AMENDMENT CY 120.0000 1,440.00 0.000 0 062 MULCH CY 80.0000 2,480.00 0.000 0 063 FERTILIZER (PACKET) EA 1.2500 712.50 0.000 0 064 PLANT (GROUP I) EA 15.0000 6,000.00 0.000 0 065 PLANT (GROUP W) EA 20.0000 1,120.00 0.000 0 066 PLANT (GROUP A) EA 15.0000 1,950.00 0.000 0 067 PLANT ESTABLISHMENT WORK LS 48,000.0000 48,000.00 0.000 0 068 FOLIAGE PROTECTOR EA 10.0000 5,200.00 0.000 0 069 CONTROL AND NEUTRAL CONDUCTORS LS 400.0000 400.00 0.000 0 070 1" ELECTRIC REMOTE CONTROL VALVE EA 600.0000 600.00 0.000 0 071 1" VALVE ASSEMBLY UNIT EA 600.0000 2,400.00 0.000 0 072 IRRIGATION CONTROLLER (BATTERY) EA 1,400.0000 4,200.00 0.000 0 073 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 074 3" SUPPLY LINE (BRIDGE) LF 30.0000 9,180.00 0.000 0 (F) 075 WATER METER EA 4,800.0000 4,800.00 0.000 0 076 BACKFLOW PREVENTER ASSEMBLY ENCLOSURE EA 2,000.0000 2,000.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 11/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1A2904 TIME 02:36 PM ESTIMATE NO. 004 BID OPENING 01/08/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/14 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 11/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 1" BACKFLOW PREVENTER ASSEMBLY EA 2,000.0000 2,000.00 0.000 0 078 SPRINKLER (TYPE D-1) EA 8.0000 6,400.00 0.000 0 079 1" GATE VALVE EA 450.0000 1,350.00 0.000 0 080 2" GATE VALVE EA 500.0000 1,500.00 0.000 0 081 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 2.0000 10,300.00 0.000 0 (F) LINE) 082 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 2.0000 4,680.00 0.000 0 (F) LINE) 083 2" PLASTIC PIPE (SCHEDULE 40) LF 3.0000 900.00 0.000 0 (F) (SUPPLY LINE) 084 3/4" COMBINATION AIR RELEASE VALVE EA 100.0000 1,300.00 0.000 0 085 1" COMBINATION AIR RELEASE VALVE EA 100.0000 600.00 0.000 0 086 3/4" QUICK COUPLING VALVE EA 300.0000 1,200.00 0.000 0 087 8" CORRUGATED HIGH DENSITY LF 30.0000 3,900.00 0.000 0 (F) POLYETHYLENE PIPE CONDUIT 088 4" WELDED STEEL PIPE CONDUIT LF 30.0000 1,500.00 0.000 0 (F) (.237" THICK) 089 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,000.0000 8,000.00 0.000 0 090 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 0.5000 13,300.00 0.000 0 091 HYDROMULCH SQFT 0.0200 2,900.00 0.000 0 092 FIBER ROLLS LF 3.0000 19,320.00 0.000 0 093 STRAW SQFT 0.0300 3,090.00 0.000 0 094 HYDROSEED SQFT 0.1000 14,500.00 0.000 0 095 COMPOST SQFT 0.1200 16,560.00 0.000 0 096 INCORPORATE MATERIALS SQFT 0.0500 3,085.00 0.000 0 097 CLASS 2 AGGREGATE BASE (CY) CY 35.0000 55,650.00 0.000 0 098 HOT MIX ASPHALT (TYPE A) TON 85.0000 317,900.00 0.000 0 099 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 14.0000 700.00 0.000 0 100 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 14.0000 3,150.00 0.000 0 101 PLACE HOT MIX ASPHALT SQYD 70.0000 2,030.00 0.000 0 (MISCELLANEOUS AREA) 102 LIQUID ASPHALT (PRIME COAT) TON 500.0000 3,500.00 0.000 0 103 TACK COAT TON 500.0000 2,500.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 11/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1A2904 TIME 02:36 PM ESTIMATE NO. 004 BID OPENING 01/08/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/14 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 11/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 JOINTED PLAIN CONCRETE PAVEMENT CY 550.0000 13,750.00 0.000 0 105 FURNISH PILING (CLASS 90) LF 50.0000 186,450.00 0.000 0 (ALTERNATIVE V) 106 DRIVE PILE (CLASS 90) EA 1,550.0000 145,700.00 0.000 0 (ALTERNATIVE V) 107 FURNISH 48" CAST-IN-STEEL SHELL LF 475.0000 414,200.00 0.000 0 CONCRETE PILING 108 DRIVE 48" CAST-IN-STEEL SHELL CONCRETE EA 19,000.0000 342,000.00 0.000 0 PILE 109 SEAL COURSE CONCRETE CY 200.0000 85,600.00 0.000 0 110 STRUCTURAL CONCRETE, BRIDGE CY 850.0000 867,850.00 0.000 0 (F) 111 STRUCTURAL CONCRETE, RETAINING WALL CY 450.0000 329,850.00 0.000 0 (F) 112 STRUCTURAL CONCRETE, APPROACH SLAB CY 750.0000 96,750.00 0.000 0 (F) (TYPE N) 113 MINOR CONCRETE (MINOR STRUCTURE) CY 1,700.0000 20,400.00 0.000 0 114 MINOR CONCRETE (BACKFILL) CY 175.0000 10,325.00 0.000 0 115 RANDOM ROCK TEXTURE SQFT 20.0000 97,080.00 0.000 0 (F) 116 DRILL AND BOND DOWEL LF 40.0000 3,080.00 0.000 0 117 FURNISH PRECAST PRESTRESSED CONCRETE EA 11,000.0000 264,000.00 0.000 0 GIRDER (70'-80') 118 ERECT PRECAST PRESTRESSED CONCRETE EA 3,200.0000 76,800.00 0.000 0 (F) GIRDER 119 JOINT SEAL (MR 1 1/2") LF 140.0000 15,820.00 0.000 0 120 BAR REINFORCING STEEL (BRIDGE) LB 1.0000 469,429.00 0.000 0 (F) 121 BAR REINFORCING STEEL (RETAINING WALL) LB 1.0000 103,033.00 0.000 0 (F) 122 BAR REINFORCING STEEL (EPOXY COATED) LB 10.0000 2,770.00 0.000 0 (F) 123 PREPARE AND STAIN CONCRETE SQFT 6.0000 59,100.00 0.000 0 124 18" ALTERNATIVE PIPE CULVERT (TYPE A) LF 60.0000 30,600.00 0.000 0 125 CLASS 3 PERMEABLE MATERIAL (BLANKET) CY 40.0000 480.00 0.000 0 126 TEMPORARY ACCESS PAD LS 200,000.0000 200,000.00 0.000 0 127 MINOR CONCRETE (GUTTER) (LF) LF 75.0000 1,200.00 0.000 0 (F) 128 MINOR CONCRETE (CURB AND GUTTER) CY 450.0000 25,650.00 0.000 0 129 MINOR CONCRETE (SIDEWALK) CY 250.0000 12,750.00 0.000 0 130 MISCELLANEOUS IRON AND STEEL LB 2.0000 3,346.00 0.000 0 (F) PROGRAM CAS145 PAGE 6 DATE 11/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1A2904 TIME 02:36 PM ESTIMATE NO. 004 BID OPENING 01/08/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/14 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 11/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 131 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 132 METAL BEAM GUARD RAILING LF 56.0000 8,400.00 0.000 0 133 TUBULAR BICYCLE RAILING LF 105.0000 42,210.00 0.000 0 (F) 134 CONCRETE BARRIER (TYPE 25) LF 400.0000 2,000.00 0.000 0 135 CABLE RAILING (MODIFIED) LF 350.0000 5,600.00 0.000 0 (F) 136 TRANSITION RAILING (TYPE WB) EA 3,750.0000 11,250.00 0.000 0 137 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,175.0000 3,175.00 0.000 0 138 CONCRETE BARRIER (TYPE 80SWA MODIFIED) LF 600.0000 80,400.00 0.000 0 (F) 139 CONCRETE BARRIER (TYPE 80SW MODIFIED) LF 600.0000 372,600.00 0.000 0 (F) 140 CONCRETE BARRIER (TYPE 80A MODIFIED) LF 400.0000 160,800.00 0.000 0 (F) 141 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 2,484.00 0.000 0 142 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 330.00 0.000 0 143 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 950.00 0.000 0 144 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 800.00 0.000 0 145 LIGHTING (CITY STREET) LS 23,000.0000 23,000.00 0.000 0 146 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 147 MODIFY SIGNAL AND LIGHTING LS 8,500.0000 8,500.00 0.000 0 148 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 149 TIME-RELATED OVERHEAD (WDAY) WDAY 300.0000 105,000.00 0.000 0 150 ROADSIDE CLEARING LS 1,500.0000 1,500.00 0.000 0 151 IRRIGATION SLEEVE LF 20.0000 700.00 0.000 0 152 CAM COUPLER ASSEMBLY EA 600.0000 1,200.00 0.000 0 153 PRESSURE REGULATING VALVE EA 600.0000 2,400.00 0.000 0 154 BALL VALVE EA 600.0000 2,400.00 0.000 0 155 MISCELLANEOUS METAL (BRIDGE) LB 3.0000 5,718.00 0.000 0 (F) 156 SPRINKLER CONTROL CONDUIT (BRIDGE) (LS) LS 6,500.0000 6,500.00 0.000 0 PROGRAM CAS145 PAGE 7 DATE 11/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1A2904 TIME 02:36 PM ESTIMATE NO. 004 BID OPENING 01/08/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/14 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 11/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 0.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 2,175.24 17,625.82 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 2,175.24 17,625.82 157 MOBILIZATION LS 560,000.0000 560,000.00 0.500 280,000 ORIGINAL CONTRACT AMOUNT 7,418,001.00 TOTAL WORK COMPLETED 2,175.24 297,625.82 MATERIALS ON HAND ON SITE 440,902.96 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -140,000.00 TOTAL 2,175.24 598,528.78 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/24/14 350 06/15/14 06/15/15 04/21/16 129 129 0 0 4% 37% PROGRESS IS SATISFACTORY *** SUSPENDED ON 06/15/14. VALEH, SYD RESIDENT ENGINEER PROGRAM CAS145 DATE 11/21/14