PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/24/12 EST. NO.06 TIME 03:01 PM R.E. NAME: LUGO, SERGIO 04-1E6604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 3,003.70 E.W. @ F.A.(+) 102411 Y 0002.1 0002 4,968.18 102411 Y 0004.0 003 0003 1,919.37 E.W. @ F.A.(+) 110111 Y 0003.2 0004 5,351.59 102611 Y 0005.1 0005 1,534.75 122811 Y 0007.0 16,777.59 TOTAL THIS ESTIMATE 50,260.81 TOTAL PREVIOUS ESTIMATE 67,038.40 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/24/12 EST. NO.06 TIME 03:01 PM R.E. NAME: LUGO, SERGIO 04-1E6604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/24/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1E6604 TIME 03:01 PM ESTIMATE NO. 06 BID OPENING 02/16/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/12 R.E. NAME: LUGO, SERGIO DATE OF THIS ESTIMATE 01/24/12 LOCATION RERUN PROGRESS ESTIMATE 04-SCL-101-R25.3/R25.3 ----------------------- 04-SM-101-R20.4/R20.4 AMERICAN CIVIL CONTRUCTORS IN SOLANO, SAN MATEO, SANTA CLARA 04-SOL-780-6.7/6.7 WEST COAST, INC. COUNTIES AT VARIOUS LOCATIONS 3701 MALLARD DRIVE BENICIA, CA 94510 FED. AID NO. N O N E REPLACE REINFORCED CONCRETE RAILING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 250.0000 250.00 0.500 125.00 002 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 PROGRAM 003 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 3,000.0000 3,000.00 0.330 990.00 004 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.750 7,500.00 005 TRAFFIC CONTROL SYSTEM LS 93,000.0000 93,000.00 0.050 4,650.00 0.650 60,450.00 006 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,500.0000 2,500.00 0.050 125.00 0.750 1,875.00 007 NOISE MONITORING LS 1,000.0000 1,000.00 0.350 350.00 008 BRIDGE REMOVAL (PORTION), LOCATION A LS 70,000.0000 70,000.00 0.500 35,000.00 009 BRIDGE REMOVAL (PORTION), LOCATION B LS 60,000.0000 60,000.00 1.000 60,000.00 1.000 60,000.00 010 BRIDGE REMOVAL (PORTION), LOCATION C LS 39,000.0000 39,000.00 1.000 39,000.00 (F) 011 MODIFY WIRE MESH LF 55.0000 4,235.00 70.000 3,850.00 (F) 012 CLEAN EXPANSION JOINT LF 15.0000 1,005.00 0.000 0.00 013 REFINISH BRIDGE DECK SQFT 5.0000 7,510.00 127.000 635.00 014 REPAIR SPALLED SURFACE AREA SQFT 75.0000 6,525.00 32.000 2,400.00 (F) 015 JOINT SEAL (MR 1") LF 25.0000 1,675.00 0.000 0.00 016 PREPARE AND PAINT CONCRETE SQFT 7.0000 35,000.00 4,960.000 34,720.00 017 CHAIN LINK RAILING (TYPE 3) LF 180.0000 75,060.00 371.500 66,870.00 (F) 018 CHAIN LINK RAILING (TYPE 7) LF 55.0000 95,975.00 0.000 0.00 (F) 019 CONCRETE BARRIER (TYPE 25R MODIFIED) LF 80.0000 22,600.00 0.000 0.00 (F) 020 CONCRETE BARRIER (TYPE 26R MODIFIED) LF 125.0000 182,812.50 0.000 0.00 (F) 021 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 600.0000 600.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION 022 MODIFY LIGHTING LS 55,000.0000 55,000.00 0.100 5,500.00 PROGRAM CAS145 PAGE 2 DATE 01/24/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1E6604 TIME 03:01 PM ESTIMATE NO. 06 BID OPENING 02/16/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/12 R.E. NAME: LUGO, SERGIO DATE OF THIS ESTIMATE 01/24/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 64,775.00 320,265.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 16,777.59 67,038.40 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 81,552.59 387,303.40 023 MOBILIZATION LS 85,000.0000 85,000.00 0.950 80,750.00 ORIGINAL CONTRACT AMOUNT 852,747.50 TOTAL WORK COMPLETED 81,552.59 468,053.40 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 81,552.59 468,053.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/28/11 105 07/28/11 07/28/11 02/10/12 105 88 15 1 40% 87% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU CCO DAYS PENDING LUGO, SERGIO RESIDENT ENGINEER PROGRAM CAS145 DATE 01/24/12