PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/13 EST. NO.01 TIME 09:35 AM R.E. NAME: REZAEI, ASGHAR 04-1E82A4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/13 EST. NO.01 TIME 09:35 AM R.E. NAME: REZAEI, ASGHAR 04-1E82A4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1E82A4 TIME 09:35 AM ESTIMATE NO. 01 BID OPENING 06/19/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/13 R.E. NAME: REZAEI, ASGHAR DATE OF THIS ESTIMATE 08/22/13 LOCATION PROGRESS ESTIMATE 04-CC-680-17.5/18.8 ----------------- DIVERSIFIED CONCRETE CUTTING IN CONTRA COSTA COUNTY IN PLEASANT HILL FR 59 CONEY ISLAND WAY OM 0.2 MILE SOUTH OF MONUMENT BOULEVARD UN SPARKS, NEVADA 89431 DERCROSSING TO 0.1 MILE NORTH OF 242/680 S EPARATION. FED. AID NO. N O N E PCC SLAB REPLACE, GRIND, AND GROOVE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 2,500.0000 2,500.00 0.000 0 002 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 0.750 1,125.00 0.750 1,125 PROGRAM 003 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 1,400.00 0.000 0 004 STREET SWEEPING LS 5,000.0000 5,000.00 0.000 0 005 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 0.000 0 006 CONSTRUCTION AREA SIGNS LS 16,000.0000 16,000.00 0.000 0 007 TRAFFIC CONTROL SYSTEM LS 88,150.2500 88,150.25 0.000 0 008 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,500.0000 2,500.00 0.000 0 009 NOISE MONITORING LS 1,500.0000 1,500.00 0.000 0 010 REMOVE PAVEMENT MARKER EA 1.7500 15,225.00 0.000 0 011 ASPHALTIC EMULSION (FOG SEAL COAT) TN 800.0000 6,400.00 0.000 0 012 CRACK TREATMENT LNMI 4,375.0000 37,625.00 0.000 0 013 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 700.0000 287,000.00 0.000 0 014 REPAIR SPALLED JOINTS, SQYD 1,700.0000 42,500.00 0.000 0 POLYESTER GROUT 015 GROOVE EXISTING CONCRETE PAVEMENT SQYD 3.8000 323,000.00 0.000 0 016 GRIND EXISTING CONCRETE SQYD 4.8800 414,800.00 0.000 0 PAVEMENT 017 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 36,000.00 0.000 0 018 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 3,360.00 0.000 0 019 THERMOPLASTIC PAVEMENT MARKING SQFT 3.7500 1,781.25 0.000 0 020 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.5000 15,750.00 0.000 0 PAVEMENT 021 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.7500 9,187.50 0.000 0 022 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,500.0000 2,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 08/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1E82A4 TIME 09:35 AM ESTIMATE NO. 01 BID OPENING 06/19/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/13 R.E. NAME: REZAEI, ASGHAR DATE OF THIS ESTIMATE 08/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 LOOP DETECTOR REPLACEMENT LS 65,000.0000 65,000.00 0.000 0 (TRAFFIC MONITORING STATION) PROGRAM CAS145 PAGE 3 DATE 08/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1E82A4 TIME 09:35 AM ESTIMATE NO. 01 BID OPENING 06/19/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/13 R.E. NAME: REZAEI, ASGHAR DATE OF THIS ESTIMATE 08/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,125.00 1,125.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,125.00 1,125.00 024 MOBILIZATION LS 65,000.0000 65,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 1,444,679.00 TOTAL WORK COMPLETED 1,125.00 1,125.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,125.00 1,125.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/06/13 80 04/15/13 07/01/13 10/24/13 35 1 0 0 0% 44% PROGRESS IS SATISFACTORY REZAEI, ASGHAR RESIDENT ENGINEER PROGRAM CAS145 DATE 08/22/13