PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/22/19 EST. NO. 003 TIME 06:01 PM R.E. NAME: BEHNIWAL, NACHHATAR (NEIL) 04-1K3404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/22/19 EST. NO. 003 TIME 06:01 PM R.E. NAME: BEHNIWAL, NACHHATAR (NEIL) 04-1K3404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1K3404 TIME 06:01 PM ESTIMATE NO. 003 BID OPENING 10/09/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: BEHNIWAL, NACHHATAR (NEIL) DATE OF THIS ESTIMATE 07/22/19 LOCATION PROGRESS ESTIMATE 04-ALA-185-3.2/3.8 ----------------- MCGUIRE AND HESTER IN ALAMEDA COUNTY IN AND NEAR SAN 2810 HARBOR BAY PARKWAY LEANDRO, FROM ORA LOMA DITCH TO ALAMEDA CA 94502 HESPERIAN BOULEVARD FED. AID NO. N O N E AC RESURFACING, UPGRADE CURB RAMPS. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 0.200 200.00 1.000 1,000 002 CONSTRUCTION AREA SIGNS LS 12,200.0000 12,200.00 0.500 6,100.00 1.000 12,200 003 TRAFFIC CONTROL SYSTEM LS 8,800.0000 8,800.00 0.200 1,760.00 0.900 7,920 004 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 6.0000 5,580.00 0.000 0 005 TEMPORARY PAVEMENT MARKER EA 1.2500 525.00 0.000 0 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,000.0000 5,000.00 0.200 1,000.00 0.900 4,500 007 JOB SITE MANAGEMENT LS 16,000.0000 16,000.00 0.500 8,000.00 1.000 16,000 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.200 200.00 1.000 1,000 009 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 1,050.00 4.000 600.00 8.000 1,200 010 STREET SWEEPING LS 9,000.0000 9,000.00 1.000 9,000.00 1.000 9,000 011 TEMPORARY CONCRETE WASHOUT LS 1,000.0000 1,000.00 0.200 200.00 1.000 1,000 012 NOISE MONITORING LS 100.0000 100.00 1.000 100.00 1.000 100 013 REMOVE CONCRETE (CY) CY 550.0000 16,500.00 30.000 16,500 014 CRACK TREATMENT LNMI 12,500.0000 31,250.00 1.800 22,500 015 HOT MIX ASPHALT (TYPE A) TON 330.0000 11,220.00 34.000 11,220 016 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 159.0000 419,760.00 50.000 7,950.00 1,750.000 278,250 017 TACK COAT TON 900.0000 10,800.00 7.700 6,930 018 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.3500 85,260.00 14,625.000 63,618 019 REMOVE BASE AND SURFACING CY 400.0000 6,800.00 15.000 6,000 020 DETECTABLE WARNING SURFACE SQFT 38.0000 4,180.00 20.000 760.00 110.000 4,180 021 MINOR CONCRETE (CURB AND CURB RAMP) CY 800.0000 24,000.00 24.000 19,200 022 REMOVE PAVEMENT MARKER EA 1.0000 280.00 140.000 140.00 280.000 280 PROGRAM CAS145 PAGE 2 DATE 07/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1K3404 TIME 06:01 PM ESTIMATE NO. 003 BID OPENING 10/09/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: BEHNIWAL, NACHHATAR (NEIL) DATE OF THIS ESTIMATE 07/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 1,680.00 280.000 1,680.00 280.000 1,680 024 OBJECT MARKER (TYPE K) EA 120.0000 360.00 0.000 0 025 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 11,130.00 3,473.000 10,419.00 3,473.000 10,419 026 8" THERMOPLASTIC TRAFFIC STRIPE LF 3.2000 2,528.00 790.000 2,528.00 790.000 2,528 027 8" THERMOPLASTIC TRAFFIC STRIPE LF 3.2000 1,728.00 0.000 0 (BROKEN 12-3) 028 THERMOPLASTIC PAVEMENT MARKING SQFT 12.0000 54,360.00 4,622.250 55,467.00 4,622.250 55,467 (ENHANCED WET NIGHT VISIBILITY) 029 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 3,120.00 0.000 0 (BROKEN 36-12) 030 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.2000 12,800.00 872.000 2,790.40 872.000 2,790 (BROKEN 17-7) 031 PAINT PAVEMENT MARKING (2-COAT) SQFT 20.0000 180.00 0.000 0 032 MODIFYING EXISTING ELECTRICAL SYSTEM LS 45,000.0000 45,000.00 0.450 20,250.00 0.450 20,250 033 PREPAVING INERTIAL PROFILER LS 6,800.0000 6,800.00 0.200 1,360.00 1.000 6,800 PROGRAM CAS145 PAGE 3 DATE 07/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1K3404 TIME 06:01 PM ESTIMATE NO. 003 BID OPENING 10/09/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: BEHNIWAL, NACHHATAR (NEIL) DATE OF THIS ESTIMATE 07/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 130,504.40 582,533.15 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 130,504.40 582,533.15 ORIGINAL CONTRACT AMOUNT 810,991.00 TOTAL WORK COMPLETED 130,504.40 582,533.15 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 130,504.40 582,533.15 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/17/18 45 04/15/19 04/16/19 08/05/19 35 3 0 0 72% 78% PROGRESS IS SATISFACTORY BEHNIWAL, NACHHATAR (NEIL) RESIDENT ENGINEER PROGRAM CAS145 DATE 07/22/19