PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/20/18 EST. NO. 001 TIME 12:51 PM R.E. NAME: DAVID, JOSE 04-1K6204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/20/18 EST. NO. 001 TIME 12:51 PM R.E. NAME: DAVID, JOSE 04-1K6204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/20/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1K6204 TIME 12:51 PM ESTIMATE NO. 001 BID OPENING 04/18/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/18 R.E. NAME: DAVID, JOSE DATE OF THIS ESTIMATE 08/20/18 LOCATION PROGRESS ESTIMATE 04-SM-1-17.9/17.9 ----------------- 04-SM-101-17.9/17.9 AMERICAN CIVIL CONSTRUCTORS IN SAN MATEO COUNTY AT VARIOUS 04-SM-280-17.9/17.9 WEST COAST LLC LOCATIONS 2990 BAY VISTA COURT, SUITE D BENICIA CA 94510 FED. AID NO. N O N E TREAT BRIDGE DECK WITH METHACRYLATE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000 002 CONSTRUCTION AREA SIGNS LS 12,000.0000 12,000.00 0.000 0 003 TRAFFIC CONTROL SYSTEM LS 125,000.0000 125,000.00 0.000 0 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 15,000.0000 15,000.00 0.000 0 005 JOB SITE MANAGEMENT LS 1,500.0000 1,500.00 0.000 0 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 0.000 0 007 TEMPORARY DRAINAGE INLET PROTECTION EA 50.0000 200.00 0.000 0 008 TEMPORARY CONCRETE WASHOUT LS 2,500.0000 2,500.00 0.000 0 009 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 4.0000 16,200.00 0.000 0 STRIPE (HAZARDOUS WASTE) 010 NOISE MONITORING LS 2,000.0000 2,000.00 0.000 0 011 CLEAN EXPANSION JOINT LF 20.0000 14,420.00 0.000 0 012 JOINT SEAL (MR 1/2") LF 35.0000 6,265.00 0.000 0 013 JOINT SEAL (MR 1") LF 50.0000 27,100.00 0.000 0 014 CLEAN AND PAINT STRUCTURAL STEEL LS 21,717.0000 21,717.00 0.000 0 (EXISTING BRIDGE) 015 PUBLIC SAFETY PLAN LS 13,835.0000 13,835.00 0.000 0 016 RAPID SETTING CONCRETE (PATCH) CF 20.0000 2,220.00 0.000 0 017 REMOVE CONCRETE DECK SURFACE SQFT 2.7500 60,843.75 0.000 0 018 REMOVE UNSOUND CONCRETE CF 90.0000 9,990.00 0.000 0 019 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.3000 44,184.00 0.000 0 020 FURNISH POLYESTER CONCRETE OVERLAY CF 90.0000 124,470.00 0.000 0 021 PLACE POLYESTER CONCRETE OVERLAY SQFT 3.0000 66,375.00 0.000 0 (F) 022 TREAT BRIDGE DECK SQFT 0.3500 43,804.25 0.000 0 (F) PROGRAM CAS145 PAGE 2 DATE 08/20/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1K6204 TIME 12:51 PM ESTIMATE NO. 001 BID OPENING 04/18/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/18 R.E. NAME: DAVID, JOSE DATE OF THIS ESTIMATE 08/20/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 60.0000 83,520.00 0.000 0 024 PAINT BRIDGE IDENTIFICATION EA 400.0000 3,200.00 0.000 0 025 BRIDGE REMOVAL (PORTION), LOCATION A LS 50,000.0000 50,000.00 0.000 0 026 BRIDGE REMOVAL (PORTION), LOCATION B LS 75,206.0000 75,206.00 0.000 0 027 MISCELLANEOUS METAL LB 20.0000 276,520.00 0.000 0 (F) (RESTRAINER - CABLE TYPE) 028 REMOVE PAVEMENT MARKER EA 1.0000 200.00 0.000 0 029 PAVEMENT MARKER (RETROREFLECTIVE) EA 15.0000 3,150.00 0.000 0 030 THERMOPLASTIC PAVEMENT MARKING SQFT 24.0000 960.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 031 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 13,590.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 032 PAINT TRAFFIC STRIPE (2-COAT) LF 1.5000 20,850.00 0.000 0 033 6" THERMOPLASTIC TRAFFIC STRIPE LF 6.0000 50,700.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 034 8" THERMOPLASTIC TRAFFIC STRIPE LF 8.0000 2,000.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 035 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 11,580.00 0.000 0 036 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 10.0000 400.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 08/20/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1K6204 TIME 12:51 PM ESTIMATE NO. 001 BID OPENING 04/18/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/18 R.E. NAME: DAVID, JOSE DATE OF THIS ESTIMATE 08/20/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 5,000.00 5,000.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 5,000.00 5,000.00 037 MOBILIZATION LS 125,000.0000 125,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 1,333,000.00 TOTAL WORK COMPLETED 5,000.00 5,000.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 5,000.00 5,000.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/29/18 100 06/13/18 06/13/18 11/05/18 46 1 0 0 0% 46% PROGRESS IS SATISFACTORY DAVID, JOSE RESIDENT ENGINEER PROGRAM CAS145 DATE 08/20/18