PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/20/24 EST. NO. 001 TIME 01:46 PM R.E. NAME: PAULO, HARLEY 04-1K7504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/20/24 EST. NO. 001 TIME 01:46 PM R.E. NAME: PAULO, HARLEY 04-1K7504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/20/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1K7504 TIME 01:46 PM ESTIMATE NO. 001 BID OPENING 10/05/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/24 R.E. NAME: PAULO, HARLEY DATE OF THIS ESTIMATE 08/20/24 LOCATION PROGRESS ESTIMATE 04-SON-1-41.2/54.6 ----------------- WYLATTI RESOURCE MANAGEMENT, I SONOMA COUNTY AT VARIOUS LOCATIONS FROM NC. 0.2 MILE NORTH OF MILLER CREEK TO 0.1 MILE 23601 CEMETERY LANE NORTH OF VANTAGE ROAD COVELO CA 95428 FED. AID NO. N O N E REMOVE CULVERT, RCP, CORRUGATED STEEL PIPE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,033.3200 3,033.32 0.000 0 002 TIME-RELATED OVERHEAD (WDAY) WDAY 200.0000 35,000.00 42.000 8,400.00 42.000 8,400 003 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 10,000.00 0.000 0 MEETING 004 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 10,560.0000 10,560.00 0.240 2,534.40 0.240 2,534 006 TRAFFIC CONTROL SYSTEM LS 315,434.7700 315,434.77 0.240 75,704.34 0.240 75,704 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 5,533.3400 38,733.38 2.000 11,066.68 2.000 11,066 008 JOB SITE MANAGEMENT LS 265,896.6600 265,896.66 0.240 63,815.20 0.240 63,815 009 PREPARE STORM WATER POLLUTION PREVENTION LS 9,260.0000 9,260.00 0.240 2,222.40 0.240 2,222 PLAN 010 RAIN EVENT ACTION PLAN EA 500.0000 26,500.00 0.000 0 011 STORM WATER SAMPLING AND ANALYSIS DAY EA 210.6700 5,266.75 0.000 0 012 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 0.000 0 013 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 750.00 0.000 0 014 TEMPORARY REINFORCED SILT FENCE LF 10.6900 80,602.60 3,808.000 40,707.52 3,808.000 40,707 015 STREET SWEEPING LS 7,603.7500 7,603.75 0.240 1,824.90 0.240 1,824 016 TEMPORARY CONCRETE WASHOUT LS 9,700.0000 9,700.00 0.240 2,328.00 0.240 2,328 017 TEMPORARY CREEK DIVERSION SYSTEMS LS 57,245.1200 57,245.12 0.000 0 018 TREATED WOOD WASTE LB 4.0000 313.20 0.000 0 019 TEMPORARY HIGH-VISIBILITY FENCE LF 7.0000 8,610.00 0.000 0 020 CLEARING AND GRUBBING (LS) LS 16,754.3600 16,754.36 0.000 0 021 ROADWAY EXCAVATION CY 84.4900 4,984.91 0.000 0 022 SAND BEDDING CY 51.8200 1,502.78 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/20/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1K7504 TIME 01:46 PM ESTIMATE NO. 001 BID OPENING 10/05/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/24 R.E. NAME: PAULO, HARLEY DATE OF THIS ESTIMATE 08/20/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 DITCH EXCAVATION CY 312.2200 7,493.28 2.000 624.44 2.000 624 024 IMPORTED BORROW (CY) CY 55.6600 1,781.12 0.000 0 025 EMBANKMENT CY 119.1300 3,812.16 0.000 0 026 ROADSIDE CLEARING LS 2,824.8500 2,824.85 0.240 677.96 0.240 677 027 PLANT ESTABLISHMENT WORK LS 40,614.2200 40,614.22 0.000 0 028 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 454.3200 6,360.48 0.000 0 029 DRY SEED (SQFT) SQFT 181.5800 3,631.60 0.000 0 030 ROLLED EROSION CONTROL PRODUCT (BLANKET) SQFT 1.6400 1,574.40 0.000 0 031 HYDROMULCH SQFT 1.1500 25,990.00 0.000 0 032 FIBER ROLLS LF 10.5400 46,586.80 0.000 0 033 HYDROSEED SQFT 1.1300 14,916.00 0.000 0 034 COMPOST (CY) CY 331.9700 13,942.74 0.000 0 035 PERMANENT EROSION CONTROL ESTABLISHMENT LS 125,374.4200 125,374.42 0.000 0 WORK 036 CLASS 3 AGGREGATE BASE (CY) CY 74.6500 2,090.20 0.000 0 037 BASE BOND BREAKER SQYD 16.2900 7,656.30 89.000 1,449.81 89.000 1,449 038 HOT MIX ASPHALT (TYPE A) TON 212.6800 25,521.60 35.050 7,454.43 35.050 7,454 039 TACK COAT TON 19,000.0000 3,800.00 0.010 190.00 0.010 190 040 STRUCTURAL CONCRETE, DRAINAGE INLET CY 3,455.0600 79,466.38 0.000 0 (F) 041 BAR REINFORCING STEEL LB 4.1800 3,176.80 360.720 1,507.81 360.720 1,507 (F) 042 CONCRETE BACKFILL (PIPE TRENCH) (RSC) CY 637.9900 433,833.20 79.000 50,401.21 79.000 50,401 043 24" REINFORCED CONCRETE PIPE LF 567.0500 96,398.50 48.000 27,218.40 48.000 27,218 044 18" CORRUGATED STEEL PIPE (.109" THICK) LF 667.8600 64,114.56 0.000 0 045 24" CORRUGATED STEEL PIPE (.109" THICK) LF 606.9900 91,048.50 41.000 24,886.59 41.000 24,886 046 30" CORRUGATED STEEL PIPE (.109" THICK) LF 543.3200 21,732.80 40.000 21,732.80 40.000 21,732 047 36" CORRUGATED STEEL PIPE (.109" THICK) LF 563.5600 84,534.00 0.000 0 048 48" CORRUGATED STEEL PIPE (.109" THICK) LF 566.3000 32,279.10 0.000 0 049 21" X 15" CORRUGATED STEEL PIPE ARCH LF 497.5900 59,710.80 114.000 56,725.26 114.000 56,725 (.109" THICK) PROGRAM CAS145 PAGE 3 DATE 08/20/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1K7504 TIME 01:46 PM ESTIMATE NO. 001 BID OPENING 10/05/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/24 R.E. NAME: PAULO, HARLEY DATE OF THIS ESTIMATE 08/20/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 28" X 20" CORRUGATED STEEL PIPE ARCH LF 483.8800 125,808.80 40.000 19,355.20 40.000 19,355 (.109" THICK) 051 35" X 24" CORRUGATED STEEL PIPE ARCH LF 446.6400 41,537.52 0.000 0 (.109" THICK) 052 49" X 33" CORRUGATED STEEL PIPE ARCH LF 814.8200 36,666.90 0.000 0 (.109" THICK) 053 36" STEEL FLARED END SECTION EA 1,522.8400 1,522.84 0.000 0 054 24" CONCRETE FLARED END SECTION EA 4,797.9600 4,797.96 0.000 0 055 28" X 20" STEEL FLARED END PIPE ARCH EA 622.6300 622.63 0.000 0 SECTION 056 35" X 24" STEEL FLARED END PIPE ARCH EA 1,327.4300 1,327.43 0.000 0 SECTION 057 ABANDON CULVERT (EA) EA 1,764.5600 3,529.12 1.000 1,764.56 1.000 1,764 058 REMOVE CULVERT (EA) EA 978.8500 25,450.10 8.000 7,830.80 8.000 7,830 059 REMOVE HEADWALL EA 1,500.0000 1,500.00 0.000 0 060 ROCK SLOPE PROTECTION (1/4 T, CLASS V, CY 520.0600 9,881.14 0.000 0 METHOD A) (CY) 061 ROCK SLOPE PROTECTION (300 LB, CLASS IV, CY 347.4700 3,822.17 0.000 0 METHOD B) (CY) 062 ROCK SLOPE PROTECTION (150 LB, CLASS CY 306.5200 4,904.32 0.000 0 III, METHOD B) (CY) 063 ROCK SLOPE PROTECTION (60 LB, CLASS II, CY 366.5700 7,697.97 0.000 0 METHOD B) (CY) 064 ROCK SLOPE PROTECTION (20 LB, CLASS I, CY 562.5400 12,938.42 0.000 0 METHOD B) (CY) 065 MISCELLANEOUS IRON AND STEEL LB 4.6900 8,967.28 0.000 0 (F) 066 PREPARE AND STAIN CONCRETE SQFT 3.7400 1,645.60 0.000 0 067 STAIN GALVANIZED SURFACES (LS) LS 30,559.3800 30,559.38 0.240 7,334.25 0.240 7,334 068 ROCK STAIN SQFT 3.3700 2,797.10 0.000 0 069 RECONSTRUCT WOOD FENCE LF 214.4800 72,923.20 0.000 0 070 PAVEMENT MARKER (RETROREFLECTIVE) EA 166.6700 2,666.72 0.000 0 071 MILEPOST MARKER EA 93.3400 373.36 0.000 0 072 REMOVE ROADSIDE SIGN (WOOD POST) EA 223.0000 223.00 0.000 0 073 RESET MILEPOST MARKER EA 25.0000 1,250.00 0.000 0 074 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 28.2506 211.88 0.000 0 (0.063"-UNFRAMED) 075 ROADSIDE SIGN - ONE POST EA 406.0500 406.05 0.000 0 076 6" THERMOPLASTIC TRAFFIC STRIPE LF 33.3400 20,004.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 4 DATE 08/20/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-1K7504 TIME 01:46 PM ESTIMATE NO. 001 BID OPENING 10/05/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/24 R.E. NAME: PAULO, HARLEY DATE OF THIS ESTIMATE 08/20/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 437,756.96 437,756.96 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 437,756.96 437,756.96 077 MOBILIZATION LS 124,819.9200 124,819.92 0.750 93,614.94 0.750 93,614 ORIGINAL CONTRACT AMOUNT 2,762,871.22 TOTAL WORK COMPLETED 531,371.90 531,371.90 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 531,371.90 531,371.90 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/09/23 425 06/17/24 01/03/24 11/01/24 42 3 0 0 19% 10% PROGRESS IS SATISFACTORY *** SUSPENDED ON 01/03/24. PAULO, HARLEY RESIDENT ENGINEER