PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/21/14 EST. NO.29 TIME 11:31 AM R.E. NAME: HOLLIS, JOHN 04-2490A4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/21/14 EST. NO.29 TIME 11:31 AM R.E. NAME: HOLLIS, JOHN 04-2490A4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE STORMWATER ANN REPRT -2,000.00 06 WPC -2,000.00 07 RETURN DEDUCTION 4,000.00 08 PESTICIDE REPORTS -2,000.00 11 PETICIDE REPORTS -2,000.00 12 RETURN DEDUCTION 2,000.00 13 RETURN DEDUCTION 2,000.00 15 WPC DEDUCTION -2,000.00 17 SCHEDULES -1,000.00 19 RETURN DEDUCTION 3,000.00 20 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 02/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2490A4 TIME 11:31 AM ESTIMATE NO. 29 BID OPENING 09/29/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/14 R.E. NAME: HOLLIS, JOHN DATE OF THIS ESTIMATE 02/21/14 LOCATION PROGRESS ESTIMATE 04-ALA-238-14.5/16.5 ----------------- 04-ALA-880-20.3/20.8 JJ NGUYEN INC IN ALAMEDA COUNTY IN HAYWARD, SAN 3172 SALEM DRIVE LEANDRO AND ASHLAND ON ROUTE 880 SAN JOSE, CA 95127 AND ON ROUTE 238 FED. AID NO. IM-X001(551)E HIGHWAY PLANTING AND IRRIGATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 1,000.00 1.000 250 002 TEMPORARY FENCE (TYPE ESA) LF 2.5000 3,000.00 1,200.000 3,000 003 CONSTRUCTION SITE MANAGEMENT LS 1,500.0000 1,500.00 1.000 1,500 004 PREPARE STORM WATER POLLUTION LS 2,500.0000 2,500.00 1.000 2,500 PREVENTION PLAN 005 TEMPORARY SILT FENCE LF 2.5000 9,500.00 3,800.000 9,500 006 TEMPORARY CHECK DAM LF 8.0000 2,640.00 330.000 2,640 007 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 13,050.00 69.000 10,350 008 TEMPORARY CONCRETE WASHOUT BIN EA 750.0000 750.00 1.000 750 009 STORM WATER ANNUAL REPORT EA 1,700.0000 1,700.00 1.000 1,700 010 CONSTRUCTION AREA SIGNS LS 6,000.0000 6,000.00 0.750 4,500 011 TRAFFIC CONTROL SYSTEM LS 5,000.0000 5,000.00 1.000 5,000 012 PORTABLE CHANGEABLE MESSAGE SIGN LS 4,000.0000 4,000.00 1.000 4,000 013 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500 014 ROADSIDE CLEARING LS 18,000.0000 18,000.00 1.000 18,000 015 PRUNE EXISTING PLANTS LS 15,000.0000 15,000.00 1.000 15,000 016 SOIL AMENDMENT CY 30.0000 16,500.00 550.000 16,500 017 MULCH CY 22.0000 55,748.00 2,825.000 62,150 018 COMMERCIAL FERTILIZER (PACKET) EA 0.1900 5,282.00 27,800.000 5,282 019 FIBER ROLLS LF 3.0000 66,600.00 22,200.000 66,600 020 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 1.0000 3,000.00 3,000.000 3,000 021 PLANT (GROUP A) EA 9.0000 67,140.00 7,560.000 68,040 022 PLANT (GROUP B) EA 15.0000 17,700.00 1,105.000 16,575 PROGRAM CAS145 PAGE 2 DATE 02/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2490A4 TIME 11:31 AM ESTIMATE NO. 29 BID OPENING 09/29/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/14 R.E. NAME: HOLLIS, JOHN DATE OF THIS ESTIMATE 02/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PLANT (GROUP U) EA 48.0000 112,320.00 2,396.000 115,008 024 PLANT ESTABLISHMENT WORK LS 125,000.0000 125,000.00 0.027 3,375.00 0.459 57,375 025 CONTROL AND NEUTRAL CONDUCTORS LS 40,000.0000 40,000.00 1.000 40,000 026 1" ELECTRIC REMOTE CONTROL VALVE EA 300.0000 14,700.00 49.000 14,700 027 1 1/2" ELECTRIC REMOTE CONTROL VALVE EA 300.0000 11,100.00 37.000 11,100 028 2" ELECTRIC REMOTE CONTROL VALVE EA 360.0000 2,520.00 10.000 3,600 029 1" ELECTRIC REMOTE CONTROL VALVE EA 340.0000 3,400.00 11.000 3,740 (PRESSURE REGULATING) 030 1 1/2" ELECTRIC REMOTE CONTROL VALVE EA 350.0000 5,950.00 15.000 5,250 (PRESSURE REGULATING) 031 2" ELECTRIC REMOTE CONTROL VALVE EA 450.0000 450.00 1.000 450 (PRESSURE REGULATING) 032 8 STATION IRRIGATION CONTROLLER EA 1,000.0000 1,000.00 0.000 0 (WALL MOUNTED) 033 12 STATION IRRIGATION CONTROLLER EA 1,200.0000 3,600.00 4.000 4,800 (WALL MOUNTED) 034 12 STATION IRRIGATION CONTROLLER EA 1,500.0000 1,500.00 1.000 1,500 (SOLAR) 035 24 STATION IRRIGATION CONTROLLER EA 1,300.0000 1,300.00 7.000 9,100 (WALL MOUNTED) 036 28 STATION IRRIGATION CONTROLLER EA 1,450.0000 1,450.00 0.000 0 037 16 STATION IRRIGATION CONTROLLER EA 1,350.0000 5,400.00 0.000 0 (WALL MOUNTED) 038 2 1/2" GALVANIZED STEEL PIPE LF 30.0000 7,200.00 182.000 5,460 (SUPPLY LINE) 039 3/4" PLASTIC PIPE (PR 200) (SUPPLY LINE) LF 1.5000 122,332.50 81,555.000 122,332 (F) 040 1" PLASTIC PIPE (PR 200) (SUPPLY LINE) LF 2.0000 29,154.00 14,577.000 29,154 (F) 041 1 1/4" PLASTIC PIPE (PR 200) LF 2.0000 16,414.00 8,207.000 16,414 (F) (SUPPLY LINE) 042 1 1/2" PLASTIC PIPE (PR 200) LF 2.0000 4,440.00 2,220.000 4,440 (F) (SUPPLY LINE) 043 2" PLASTIC PIPE (PR 200) (SUPPLY LINE) LF 3.0000 6,852.00 2,284.000 6,852 (F) 044 2 1/2" PLASTIC PIPE (PR 200) LF 4.0000 56,260.00 14,065.000 56,260 (F) (SUPPLY LINE) 045 IRRIGATION CONTROLLER ENCLOSURE EA 1,500.0000 16,500.00 12.000 18,000 CABINET 046 WATER METER EA 200,000.0000 200,000.00 0.371 74,200 047 BACKFLOW PREVENTER ASSEMBLY ENCLOSURE EA 2,000.0000 4,000.00 2.000 4,000 048 1 1/2" BACKFLOW PREVENTER ASSEMBLY EA 1,500.0000 3,000.00 2.000 3,000 049 SPRINKLER (TYPE B-2) EA 30.0000 10,800.00 360.000 10,800 PROGRAM CAS145 PAGE 3 DATE 02/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2490A4 TIME 11:31 AM ESTIMATE NO. 29 BID OPENING 09/29/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/14 R.E. NAME: HOLLIS, JOHN DATE OF THIS ESTIMATE 02/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 SPRINKLER (TYPE C-2) EA 9.0000 39,060.00 4,351.000 39,159 051 1" GATE VALVE EA 120.0000 120.00 1.000 120 052 1 1/2" GATE VALVE EA 150.0000 750.00 6.000 900 053 2" GATE VALVE EA 290.0000 2,900.00 10.000 2,900 054 2 1/2" GATE VALVE EA 450.0000 17,550.00 40.000 18,000 055 1" WYE STRAINER EA 160.0000 2,720.00 17.000 2,720 056 1 1/2" WYE STRAINER EA 240.0000 5,280.00 22.000 5,280 057 3/4" QUICK COUPLING VALVE EA 180.0000 7,380.00 41.000 7,380 058 8" WELDED STEEL PIPE CONDUIT LF 120.0000 8,880.00 82.000 9,840 (.250" THICK) 059 CLASS 2 AGGREGATE BASE CY 50.0000 2,450.00 49.000 2,450 060 MINOR CONCRETE (MISCELLANEOUS CY 350.0000 34,300.00 108.500 37,975 CONSTRUCTION) 061 4' CHAIN LINK GATE (TYPE CL-6) EA 1,500.0000 7,500.00 5.000 7,500 062 5' CHAIN LINK GATE (TYPE CL-6) EA 1,500.0000 6,000.00 3.000 4,500 063 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 800.0000 800.00 1.000 800 SYSTEM ELEMENTS DURING CONSTRUCTION 064 ELECTRIC SERVICE (IRRIGATION) LS 40,000.0000 40,000.00 1.000 40,000 PROGRAM CAS145 PAGE 4 DATE 02/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2490A4 TIME 11:31 AM ESTIMATE NO. 29 BID OPENING 09/29/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/14 R.E. NAME: HOLLIS, JOHN DATE OF THIS ESTIMATE 02/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 3,375.00 1,115,396.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 55,725.87 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 3,375.00 1,171,122.37 065 MOBILIZATION LS 90,000.0000 90,000.00 1.000 90,000 ORIGINAL CONTRACT AMOUNT 1,389,442.50 TOTAL WORK COMPLETED 3,375.00 1,261,122.37 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 3,375.00 1,261,122.37 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/15/11 910 04/11/11 04/11/11 04/21/15 693 19 22 0 PLANT ESTABLISHMENT PERI PROGRESS IS SATISFACTORY HOLLIS, JOHN RESIDENT ENGINEER PROGRAM CAS145 DATE 02/21/14