PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/23/05 EST. NO.05 TIME 01:14 PM R.E. NAME: FAROKH MONEMZADEH 04-249714 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 005 0007 921.05 E.W. @ F.A.(+) 041505 N 0032.0 006 0004 206.35 E.W. @ F.A.(+) 031005 N 0029.0 0005 337.70 042205 N 0035.0 007 0010 492.95 E.W. @ F.A.(+) 031505 N 0030.0 0011 377.24 042505 N 0034.0 009 0001 680.04 E.W. @ F.A.(+) 033005 N 0021.0 0002 674.28 040105 N 0022.0 0004 783.38 033105 N 0027.0 0005 950.76 041405 N 0031.0 0006 1,222.00 042905 N 0033.0 0007 6,864.26 042705 N 0036.0 0008 674.28 041105 N 0025.0 0009 5,131.24 042205 N 0037.0 0010 4,176.34 042005 N 0038.0 0011 4,898.15 041905 N 0039.0 28,390.02 TOTAL THIS ESTIMATE 27,643.78 TOTAL PREVIOUS ESTIMATE 56,033.80 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/23/05 EST. NO.05 TIME 01:14 PM R.E. NAME: FAROKH MONEMZADEH 04-249714 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/23/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-249714 TIME 01:14 PM ESTIMATE NO. 05 BID OPENING 09/14/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: FAROKH MONEMZADEH DATE OF THIS ESTIMATE 05/23/05 LOCATION PROGRESS ESTIMATE 04-ALA-123-0.0/5.2 ----------------- GHILOTTI CONSTRUCTION COMPANY IN ALAMEDA COUNTY IN EMERYVILLE, 2301 KERNER BLVD. SUITE E OAKLAND, BERKELEY AND ALBANY FROM SAN RAFAEL CA. 94901 35TH STREET TO CONTRA COSTA COUNTY LINE FED. AID NO. ACST-P123(2)E ,P-P123(2)E REHABILITATE ROADWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 25,000.0000 25,000.00 0.250 6,250.00 02 TIME-RELATED OVERHEAD WDAY 1,700.0000 476,000.00 18.000 30,600.00 71.000 120,700.00 03 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 1.000 1,500.00 PROGRAM 04 WATER POLLUTION CONTROL LS 4,000.0000 4,000.00 0.070 280.00 0.320 1,280.00 05 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,400.0000 1,400.00 0.700 980.00 06 TEMPORARY DRAINAGE INLET PROTECTION LS 22,900.0000 22,900.00 0.070 1,603.00 0.310 7,099.00 07 CONSTRUCTION AREA SIGNS LS 50,500.0000 50,500.00 0.800 40,400.00 S) 08 TRAFFIC CONTROL SYSTEM LS 100,000.0000 100,000.00 0.064 6,400.00 0.257 25,700.00 S) 09 PORTABLE CHANGEABLE MESSAGE SIGN EA 4,500.0000 27,000.00 0.000 0.00 S) 10 ABANDON CULVERT EA 525.0000 525.00 0.000 0.00 11 REMOVE PIPE M 1,850.0000 1,850.00 0.000 0.00 12 REMOVE INLET EA 600.0000 1,200.00 0.000 0.00 13 REMOVE MANHOLE EA 1,000.0000 1,000.00 0.000 0.00 14 RESET ROADSIDE SIGN (ONE POST) EA 195.0000 975.00 0.000 0.00 15 ADJUST SURVEY MONUMENT FRAME AND EA 585.0000 19,305.00 11.000 6,435.00 11.000 6,435.00 COVER TO GRADE 16 ADJUST MANHOLE TO GRADE EA 700.0000 158,200.00 50.000 35,000.00 50.000 35,000.00 17 ADJUST UTILITY COVER TO GRADE EA 335.0000 8,040.00 0.000 0.00 18 ADJUST UTILITY BOX COVER TO GRADE EA 175.0000 30,625.00 20.000 3,500.00 64.000 11,200.00 19 MODIFY INLET EA 1,400.0000 14,000.00 1.000 1,400.00 4.000 5,600.00 20 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 4.5000 733,500.00 7,683.372 34,575.17 7,683.372 34,575.17 21 REMOVE CONCRETE (CURB AND GUTTER) M 47.5000 69,825.00 151.220 7,182.95 488.250 23,191.88 22 REMOVE CONCRETE (MISCELLANEOUS) M2 36.0000 370,800.00 1,835.180 66,066.48 5,287.120 190,336.32 PROGRAM CAS145 PAGE 2 DATE 05/23/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-249714 TIME 01:14 PM ESTIMATE NO. 05 BID OPENING 09/14/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: FAROKH MONEMZADEH DATE OF THIS ESTIMATE 05/23/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 CLEARING AND GRUBBING LS 15,000.0000 15,000.00 0.250 3,750.00 24 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 0.500 2,500.00 25 SAND BACKFILL M3 650.0000 3,250.00 0.000 0.00 26 CLASS 3 AGGREGATE BASE M3 230.0000 266,800.00 77.400 17,802.00 317.130 72,939.90 27 REPLACE ASPHALT CONCRETE SURFACING M3 1,245.0000 43,575.00 0.000 0.00 28 ASPHALT CONCRETE (TYPE A) TONN 57.5000 2,357,500.00 1,090.182 62,685.47 1,090.182 62,685.47 29 ASPHALTIC EMULSION (PAINT BINDER) TONN 360.0000 43,200.00 3.000 1,080.00 3.000 1,080.00 30 REPLACE PAVEMENT M3 780.0000 881,400.00 0.000 0.00 (RAPID STRENGTH CONCRETE) 31 GROOVE EXISTING CONCRETE DRIVEWAY M2 195.0000 44,850.00 0.000 0.00 32 MINOR CONCRETE (MINOR STRUCTURE) M3 1,700.0000 2,380.00 0.000 0.00 F) 33 300 MM ALTERNATIVE PIPE CULVERT M 1,100.0000 3,300.00 0.000 0.00 34 600 MM ALTERNATIVE PIPE CULVERT M 360.0000 140,400.00 0.000 0.00 35 MINOR CONCRETE (MISCELLANEOUS M3 525.0000 761,250.00 231.952 121,774.80 741.542 389,309.55 CONSTRUCTION) 36 MISCELLANEOUS IRON AND STEEL KG 3.5000 6,160.00 324.000 1,134.00 SF) 37 OBJECT MARKER (TYPE K-1) EA 50.0000 6,000.00 0.000 0.00 38 THERMOPLASTIC PAVEMENT MARKING M2 18.0000 59,400.00 0.000 0.00 S) 39 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.5000 8,450.00 0.000 0.00 S) 40 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 2,340.00 0.000 0.00 S) 41 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 13,700.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 42 PAINT PAVEMENT MARKING (1-COAT) M2 5.0000 1,500.00 0.000 0.00 S) 43 DRAINAGE INLET MARKER EA 55.0000 4,620.00 0.000 0.00 S) 44 INSTALL DETECTABLE WARNING SURFACE EA 235.0000 36,425.00 0.000 0.00 45 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5000 2,345.00 0.000 0.00 S) 46 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 3.5000 5,355.00 0.000 0.00 S) TYPE G) 47 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 3.5000 3,045.00 0.000 0.00 S) TYPE H) 48 MODIFY SIGNAL AND LIGHTING (LOCATION 1) LS 5,500.0000 5,500.00 0.150 825.00 0.590 3,245.00 S) 49 MODIFY SIGNAL AND LIGHTING (LOCATION 2) LS 12,500.0000 12,500.00 0.080 1,000.00 0.250 3,125.00 S) PROGRAM CAS145 PAGE 3 DATE 05/23/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-249714 TIME 01:14 PM ESTIMATE NO. 05 BID OPENING 09/14/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: FAROKH MONEMZADEH DATE OF THIS ESTIMATE 05/23/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 MODIFY SIGNAL AND LIGHTING (LOCATION 3) LS 6,500.0000 6,500.00 0.090 585.00 0.460 2,990.00 S) 51 MODIFY SIGNAL AND LIGHTING (LOCATION 4) LS 1,000.0000 1,000.00 0.330 330.00 S) 52 MODIFY SIGNAL AND LIGHTING (LOCATION 5) LS 1,500.0000 1,500.00 0.800 1,200.00 S) 53 MODIFY SIGNAL AND LIGHTING (LOCATION 6) LS 10,000.0000 10,000.00 0.160 1,600.00 0.430 4,300.00 S) 54 MODIFY SIGNAL AND LIGHTING (LOCATION 7) LS 6,500.0000 6,500.00 0.060 390.00 0.340 2,210.00 S) 55 MODIFY SIGNAL AND LIGHTING (LOCATION 8) LS 11,000.0000 11,000.00 0.090 990.00 0.380 4,180.00 S) 56 MODIFY SIGNAL AND LIGHTING (LOCATION 9) LS 3,250.0000 3,250.00 0.070 227.50 0.720 2,340.00 S) 57 MODIFY SIGNAL AND LIGHTING LS 9,250.0000 9,250.00 0.130 1,202.50 0.310 2,867.50 S) (LOCATION 10) 58 MODIFY SIGNAL AND LIGHTING LS 17,000.0000 17,000.00 0.000 0.00 S) (LOCATION 11) 59 MODIFY SIGNAL AND LIGHTING LS 10,000.0000 10,000.00 0.120 1,200.00 0.500 5,000.00 S) (LOCATION 12) 60 MODIFY SIGNAL AND LIGHTING LS 18,500.0000 18,500.00 0.000 0.00 S) (LOCATION 13) 61 MODIFY SIGNAL AND LIGHTING LS 18,500.0000 18,500.00 0.000 0.00 S) (LOCATON 14) 62 MODIFY SIGNAL AND LIGHTING LS 8,250.0000 8,250.00 0.270 2,227.50 S) (LOCATION 15) 63 MODIFY SIGNAL AND LIGHTING LS 700.0000 700.00 0.060 42.00 0.490 343.00 S) (LOCATION 16) 64 MODIFY SIGNAL AND LIGHTING LS 1,000.0000 1,000.00 0.000 0.00 S) (LOCATION 17) 65 MODIFY SIGNAL AND LIGHTING LS 5,500.0000 5,500.00 0.070 385.00 0.610 3,355.00 S) (LOCATION 18) 66 MODIFY SIGNAL AND LIGHTING LS 6,250.0000 6,250.00 0.160 1,000.00 0.350 2,187.50 S) (LOCATION 19) 67 MODIFY SIGNAL AND LIGHTING LS 6,250.0000 6,250.00 0.030 187.50 0.610 3,812.50 S) (LOCATION 20) 68 MODIFY SIGNAL AND LIGHTING LS 1,000.0000 1,000.00 1.000 1,000.00 S) (LOCATION 21) 69 MODIFY SIGNAL AND LIGHTING LS 7,250.0000 7,250.00 0.440 3,190.00 S) (LOCATION 22) 70 MODIFY SIGNAL AND LIGHTING LS 1,000.0000 1,000.00 1.000 1,000.00 S) (LOCATION 23) 71 MODIFY SIGNAL AND LIGHTING LS 800.0000 800.00 1.000 800.00 S) (LOCATION 24) 72 MODIFY SIGNAL AND LIGHTING LS 800.0000 800.00 0.500 400.00 S) (LOCATION 25) PROGRAM CAS145 PAGE 4 DATE 05/23/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-249714 TIME 01:14 PM ESTIMATE NO. 05 BID OPENING 09/14/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: FAROKH MONEMZADEH DATE OF THIS ESTIMATE 05/23/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 406,019.37 1,093,749.29 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 28,390.02 56,033.80 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 434,409.39 1,149,783.09 73 MOBILIZATION LS 670,000.0000 670,000.00 0.250 167,500.00 0.750 502,500.00 ORIGINAL CONTRACT AMOUNT 7,675,190.00 TOTAL WORK COMPLETED 601,909.39 1,652,283.09 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 601,909.39 1,652,283.09 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/13/04 280 01/04/05 01/04/05 04/30/06 71 26 0 0 21% 25% PROGRESS IS SATISFACTORY FAROKH MONEMZADEH RESIDENT ENGINEER PROGRAM CAS145 PAGE 3 DATE 05/23/05