PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/09/14 EST. NO.08 TIME 03:57 PM R.E. NAME: MONEMZADEH, FAROKH 04-2640G4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0041 197.98 E.W. @ F.A.(+) 052313 Y 5037.0 0059 110.08 062413 Y 5048.0 308.06 TOTAL THIS ESTIMATE 9,285.24 TOTAL PREVIOUS ESTIMATE 9,593.30 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/09/14 EST. NO.08 TIME 03:57 PM R.E. NAME: MONEMZADEH, FAROKH 04-2640G4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/09/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2640G4 TIME 03:57 PM ESTIMATE NO. 08 BID OPENING 09/14/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/12/13 R.E. NAME: MONEMZADEH, FAROKH DATE OF THIS ESTIMATE 01/09/14 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 04-MRN-101-20.5/20.9 ---------------------------------- GBI IN MARIN COUNTY IN NOVATO FROM 525 JACOBY STREET NOVATO CREEK BRIDGE TO FRANKLIN SAN RAFAEL, CA 94901 AVENUE OVERHEAD FED. AID NO. N O N E WIDEN BRIDGE AND HMA ROADWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 TEMPORARY FENCE (TYPE ESA) LF 3.0000 11,190.00 3,690.000 11,070 002 CONSTRUCTION SITE MANAGEMENT LS 2,500.0000 2,500.00 1.000 2,500 003 PREPARE STORM WATER POLLUTION LS 4,000.0000 4,000.00 1.000 4,000 PREVENTION PLAN 004 TEMPORARY FIBER ROLL LF 8.0000 4,000.00 510.000 4,080 005 TEMPORARY SILT FENCE LF 5.0000 750.00 150.000 750 006 TEMPORARY CONSTRUCTION ENTRANCE EA 2,500.0000 5,000.00 2.000 5,000 007 TEMPORARY COVER SQYD 3.0000 4,500.00 1,300.000 3,900 008 TEMPORARY CHECK DAM LF 6.0000 1,260.00 0.000 0 009 MOVE-IN/MOVE-OUT EA 500.0000 1,500.00 0.000 0 (TEMPORARY EROSION CONTROL) 010 TEMPORARY DRAINAGE INLET PROTECTION EA 100.0000 2,000.00 20.000 2,000 011 TEMPORARY HYDRAULIC MULCH SQYD 5.0000 1,250.00 0.000 0 (BONDED FIBER MATRIX) 012 STREET SWEEPING LS 2,000.0000 2,000.00 1.000 2,000 013 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 6,500.0000 6,500.00 0.900 5,850 014 TEMPORARY SOIL BINDER SQYD 0.1500 1,800.00 0.000 0 015 RAIN EVENT ACTION PLAN EA 500.0000 10,000.00 3.000 1,500 016 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 2.000 4,000 017 STORM WATER SAMPLING AND ANALYSIS DAY WDAY 10.0000 250.00 0.000 0 018 CONSTRUCTION AREA SIGNS LS 6,000.0000 6,000.00 1.000 6,000 019 TRAFFIC CONTROL SYSTEM LS 53,000.0000 53,000.00 1.000 53,000 020 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.3000 1,944.00 6,621.000 1,986 021 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 595.00 17.000 595 022 TEMPORARY PAVEMENT MARKER EA 3.0000 2,730.00 750.000 2,250 PROGRAM CAS145 PAGE 2 DATE 01/09/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2640G4 TIME 03:57 PM ESTIMATE NO. 08 BID OPENING 09/14/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/12/13 R.E. NAME: MONEMZADEH, FAROKH DATE OF THIS ESTIMATE 01/09/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,500.0000 1,500.00 1.000 1,500 024 TEMPORARY RAILING (TYPE K) LF 9.0000 41,220.00 4,560.000 41,040 025 TEMPORARY CRASH CUSHION MODULE EA 175.0000 7,350.00 14.000 2,450 026 ALTERNATIVE TEMPORARY CRASH CUSHION EA 1,000.0000 1,000.00 3.000 3,000 027 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 4,210.00 11,297.000 5,648 028 REMOVE CULVERT (EA) EA 2,500.0000 7,500.00 3.000 7,500 029 REMOVE INLET EA 400.0000 1,600.00 4.000 1,600 030 SALVAGE METAL BRIDGE RAILING LF 18.0000 3,960.00 220.000 3,960 031 SALVAGE METAL BEAM GUARD RAILING LF 7.5000 12,675.00 1,719.000 12,892 032 RELOCATE ROADSIDE SIGN EA 500.0000 1,500.00 3.000 1,500 033 MODIFY INLET EA 1,200.0000 1,200.00 1.000 1,200 034 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 20.0000 4,200.00 407.500 8,150 035 REMOVE CONCRETE BARRIER LF 65.0000 4,745.00 73.000 4,745 036 CAP CORRUGATED STEEL PIPE EA 250.0000 250.00 1.000 250 037 BRIDGE REMOVAL (PORTION) LS 28,000.0000 28,000.00 1.000 28,000 038 CLEARING AND GRUBBING (LS) LS 5,000.0000 5,000.00 1.000 5,000 039 DEVELOP WATER SUPPLY LS 500.0000 500.00 1.000 500 040 ROADWAY EXCAVATION CY 15.0000 71,400.00 5,092.380 76,385 041 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000 042 ROCK EXCAVATION CY 25.0000 3,500.00 399.000 9,975 043 STRUCTURE EXCAVATION (BRIDGE) CY 110.0000 4,400.00 40.000 4,400 (F) 044 STRUCTURE BACKFILL (BRIDGE) CY 450.0000 10,350.00 23.000 10,350 (F) 045 STRUCTURE BACKFILL (SLURRY CEMENT) CY 130.0000 15,496.00 74.600 9,698 (F) 046 DITCH EXCAVATION CY 40.0000 6,000.00 150.000 6,000 047 SOIL CONFINEMENT SYSTEM SQFT 7.0000 15,120.00 2,160.000 15,120 048 IMPORTED BIOFILTRATION SOIL CY 70.0000 8,400.00 120.000 8,400 049 EROSION CONTROL (COMPOST BLANKET) CY 58.0000 6,960.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 01/09/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2640G4 TIME 03:57 PM ESTIMATE NO. 08 BID OPENING 09/14/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/12/13 R.E. NAME: MONEMZADEH, FAROKH DATE OF THIS ESTIMATE 01/09/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 0.1400 5,107.20 0.000 0 051 ROLLED EROSION CONTROL PRODUCT SQFT 0.7300 1,576.80 2,160.000 1,576 (NETTING) 052 FINISHING ROADWAY LS 500.0000 500.00 1.000 500 053 CLASS 4 AGGREGATE SUBBASE CY 22.0000 51,700.00 2,382.000 52,404 054 LEAN CONCRETE BASE CY 130.0000 191,100.00 1,329.000 172,770 055 CRACK TREATMENT LNMI 8,125.0000 13,000.00 1.600 13,000 056 REPLACE ASPHALT CONCRETE SURFACING CY 300.0000 126,000.00 385.500 115,650 057 HOT MIX ASPHALT (TYPE A) TON 98.0000 220,500.00 2,095.040 205,313 058 HOT MIX ASPHALT (OPEN GRADED) TON 159.0000 50,880.00 618.920 98,408 059 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 135.0000 118,800.00 505.550 68,249 060 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 57.0000 1,140.00 83.000 4,731 061 PLACE HOT MIX ASPHALT SQYD 16.0000 2,720.00 210.000 3,360 (MISCELLANEOUS AREA) 062 TACK COAT TON 400.0000 2,800.00 8.237 3,294 063 FURNISH PILE (CLASS 200) LF 65.0000 25,090.00 386.000 25,090 (ALTERNATIVE X) 064 DRIVE PILING (CLASS 200) EA 5,500.0000 33,000.00 6.000 33,000 (ALTERNATIVE X) 065 FURNISH 24" CAST-IN-STEEL SHELL LF 190.0000 174,800.00 920.000 174,800 CONCRETE PILING 066 DRIVE 24" CAST-IN-STEEL SHELL CONCRETE EA 23,500.0000 282,000.00 12.000 282,000 PILE 067 STRUCTURAL CONCRETE, BRIDGE CY 1,250.0000 341,250.00 273.000 341,250 (F) 068 MINOR CONCRETE (MINOR STRUCTURE) CY 1,100.0000 17,820.00 13.100 14,410 (F) 069 MINOR CONCRETE (APRON) CY 1,000.0000 11,600.00 9.300 9,300 (F) 070 DRILL AND BOND DOWEL LF 30.0000 1,530.00 51.000 1,530 071 BAR REINFORCING STEEL (BRIDGE) LB 1.2500 181,837.50 145,470.000 181,837 (F) 072 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 255.00 17.000 255 (0.080"-UNFRAMED) 073 METAL (BARRIER MOUNTED SIGN) LB 15.0000 1,200.00 157.500 2,362 074 18" ALTERNATIVE PIPE CULVERT LF 50.0000 49,500.00 981.500 49,075 075 6" PERFORATED PLASTIC PIPE UNDERDRAIN LF 30.0000 3,900.00 130.000 3,900 076 18" CORRUGATED STEEL PIPE RISER LF 500.0000 2,500.00 5.000 2,500 (.109" THICK) PROGRAM CAS145 PAGE 4 DATE 01/09/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2640G4 TIME 03:57 PM ESTIMATE NO. 08 BID OPENING 09/14/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/12/13 R.E. NAME: MONEMZADEH, FAROKH DATE OF THIS ESTIMATE 01/09/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 ROCK SLOPE PROTECTION (NO. 1, METHOD B) CY 150.0000 8,100.00 54.000 8,100 (CY) 078 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 3.0000 261.00 87.000 261 079 MISCELLANEOUS IRON AND STEEL LB 1.5000 7,165.50 3,527.000 5,290 (F) 080 MARKER (CULVERT, BARRIER MOUNTED) EA 25.0000 350.00 14.000 350 081 CONCRETE BARRIER (TYPE 60A) MODIFIED LF 48.0000 9,216.00 192.000 9,216 (F) 082 CONCRETE BARRIER (TYPE 60C MODIFIED) LF 58.0000 106,140.00 1,824.000 105,792 083 CONCRETE BARRIER (TYPE 60P) LF 316.0000 3,792.00 12.000 3,792 084 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 4,237.50 6,171.000 4,628 085 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.2000 564.00 201.000 241 086 THERMOPLASTIC PAVEMENT MARKING SQFT 7.0000 308.00 44.000 308 087 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 3,392.00 8,904.000 3,561 (BROKEN 36-12) 088 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 120.00 312.000 124 (BROKEN 17-7) 089 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.5000 1,800.00 686.000 1,715 090 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 840.00 296.000 888 091 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 1.000 500 SYSTEM ELEMENTS DURING CONSTRUCTION 092 MODIFY WIRELESS MAGNETOMETER VEHICLE LS 16,967.0000 16,967.00 1.000 16,967 DETECTOR SYSTEM 093 FIBER OPTIC CONDUIT SYSTEM LS 18,000.0000 18,000.00 1.000 18,000 PROGRAM CAS145 PAGE 5 DATE 01/09/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2640G4 TIME 03:57 PM ESTIMATE NO. 08 BID OPENING 09/14/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/12/13 R.E. NAME: MONEMZADEH, FAROKH DATE OF THIS ESTIMATE 01/09/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 2,423,049.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 308.06 9,593.30 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 308.06 2,432,642.70 094 MOBILIZATION LS 269,000.0000 269,000.00 1.000 269,000 ORIGINAL CONTRACT AMOUNT 2,760,664.50 TOTAL WORK COMPLETED 308.06 2,701,642.70 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 308.06 2,701,642.70 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/20/12 76 02/14/13 06/17/13 11/12/13 76 112 0 0 100% 100% MONEMZADEH, FAROKH RESIDENT ENGINEER PROGRAM CAS145 DATE 01/09/14