PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/20/01 EST. NO.04 TIME 12:22 PM R.E. NAME: SULEIMAN MOHAMMED 04-265904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/20/01 EST. NO.04 TIME 12:22 PM R.E. NAME: SULEIMAN MOHAMMED 04-265904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/20/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-265904 TIME 12:22 PM ESTIMATE NO. 04 BID OPENING 06/28/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/01 R.E. NAME: SULEIMAN MOHAMMED DATE OF THIS ESTIMATE 04/20/01 LOCATION PROGRESS ESTIMATE 04-ALA-185-9.5/10.6 ----------------- GRANITE CONSTRUCTION IN ALAMEDA COUNTY IN OAKLAND AT P.O. BOX 50085 VARIOUS LOCATIONS WATSONVILLE, CA 95077 FED. AID NO. ACST-P185(3)E ,P-P185(3)E ROADWAY REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.700 10,500.00 (S) 002 TRAFFIC CONTROL SYSTEM LS 25,000.0000 25,000.00 0.050 1,250.00 0.130 3,250.00 (S) 003 PORTABLE CHANGEABLE MESSAGE SIGN LS 4,500.0000 4,500.00 0.000 0.00 (S) 004 REMOVE STEEL CURB GUARD M 30.0000 8,700.00 6.100 183.00 6.100 183.00 005 ADJUST VALVE COVER TO GRADE EA 675.0000 29,025.00 0.000 0.00 006 ADJUST SURVEY MONUMENT FRAME AND EA 675.0000 2,700.00 0.000 0.00 COVER TO GRADE 007 REPLACE INLET GRATE EA 1,000.0000 5,000.00 0.000 0.00 008 ADJUST MANHOLE TO GRADE EA 750.0000 29,250.00 0.000 0.00 009 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 3.0000 5,880.00 0.000 0.00 (S) (60 MM MAXIMUM) 010 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 5.7500 112,125.00 0.000 0.00 (S) (105 MM MAXIMUM) 011 REMOVE CONCRETE M3 130.0000 14,300.00 53.160 6,910.80 53.160 6,910.80 012 CLASS 3 AGGREGATE BASE M3 125.0000 20,000.00 0.000 0.00 013 SEAL RANDOM CRACKS LNKM 2,000.0000 8,000.00 0.000 0.00 014 REPLACE ASPHALT CONCRETE SURFACING M3 190.0000 108,300.00 0.000 0.00 015 ASPHALT CONCRETE (TYPE A) TONN 40.0000 244,800.00 0.000 0.00 016 ASPHALTIC EMULSION (PAINT BINDER) TONN 850.0000 8,500.00 0.000 0.00 017 PAINT CURB (2-COAT) M 4.0000 1,760.00 0.000 0.00 018 MINOR CONCRETE (MISCELLANEOUS M3 500.0000 85,000.00 45.380 22,690.00 45.380 22,690.00 CONSTRUCTION) 019 MINOR CONCRETE (STAMPED CONCRETE) M2 125.0000 16,250.00 0.000 0.00 020 THERMOPLASTIC PAVEMENT MARKING M2 34.0000 11,560.00 0.000 0.00 (S) 021 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.8500 1,853.00 0.000 0.00 (S) 022 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.4000 864.00 0.000 0.00 (S) PROGRAM CAS145 PAGE 2 DATE 04/20/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-265904 TIME 12:22 PM ESTIMATE NO. 04 BID OPENING 06/28/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/01 R.E. NAME: SULEIMAN MOHAMMED DATE OF THIS ESTIMATE 04/20/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.8500 348.50 0.000 0.00 (S) (BROKEN 10.98 M - 3.66 M) 024 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.8500 1,164.50 0.000 0.00 (S) (BROKEN 5.18 M - 2.14 M) 025 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 2,250.00 0.000 0.00 (S) 026 SIGNAL AND LIGHTING LS 11,000.0000 11,000.00 0.045 495.00 0.045 495.00 (S) (CITY STREET LOCATION 1) 027 SIGNAL AND LIGHTING LS 38,000.0000 38,000.00 0.000 0.00 (S) (CITY STREET LOCATION 2) 028 SIGNAL AND LIGHTING LS 71,000.0000 71,000.00 0.112 7,952.00 0.322 22,862.00 (S) (CITY STREET LOCATION 3) 029 SIGNAL AND LIGHTING LS 45,000.0000 45,000.00 0.138 6,210.00 0.458 20,610.00 (S) (CITY STREET LOCATION 4) 030 SIGNAL AND LIGHTING LS 191,500.0000 191,500.00 0.081 15,511.50 0.496 94,984.00 (S) (CITY STREET LOCATION 5) 031 FLASHING BEACON LS 41,000.0000 41,000.00 0.117 4,797.00 0.441 18,081.00 (S) 032 SIGNAL INTERCONNECT LS 93,500.0000 93,500.00 0.180 16,830.00 0.884 82,654.00 (S) 033 FIRE ALARM SYSTEM LS 2,000.0000 2,000.00 0.440 880.00 0.750 1,500.00 (S) 034 9600 BAUD MODEM EA 3,500.0000 10,500.00 0.000 0.00 (S) PROGRAM CAS145 PAGE 3 DATE 04/20/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-265904 TIME 12:22 PM ESTIMATE NO. 04 BID OPENING 06/28/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/01 R.E. NAME: SULEIMAN MOHAMMED DATE OF THIS ESTIMATE 04/20/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 83,709.30 284,719.80 ADJUSTMENT OF COMPENSATION 0.00 12,531.75 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 83,709.30 297,251.55 ORIGINAL CONTRACT AMOUNT 1,265,630.00 TOTAL WORK COMPLETED 83,709.30 297,251.55 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 83,709.30 297,251.55 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/09/00 120 01/02/01 00/00/00 07/11/01 66 10 0 0 23% 55% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU UTILITIES RELOCATION SULEIMAN MOHAMMED RESIDENT ENGINEER PROGRAM CAS145 PAGE 5 DATE 04/20/01