PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/24/11 EST. NO.02 TIME 02:03 PM R.E. NAME: ARSHAD, MIAN 04-268704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/24/11 EST. NO.02 TIME 02:03 PM R.E. NAME: ARSHAD, MIAN 04-268704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/24/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-268704 TIME 02:03 PM ESTIMATE NO. 02 BID OPENING 05/18/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: ARSHAD, MIAN DATE OF THIS ESTIMATE 10/24/11 LOCATION PROGRESS ESTIMATE 04-CC-4-R16.8/R17.5 ----------------- LEGG INC. IN CONTRA COSTA COUNTY NEAR CONCORD 2551 2ND STREET FROM WILLOW PASS ROAD UNDERCROSSING LIVERMORE, CA 94550 TO 1.9 MILE EAST OF WILLOW PASS ROAD UNDERCROSSING (EAST BOUND) FED. AID NO. N O N E REPLACE CONCRETE PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 TEMPORARY FENCE (TYPE ESA) LF 3.0000 2,700.00 850.000 2,550.00 002 CONSTRUCTION SITE MANAGEMENT LS 200.0000 200.00 0.500 100.00 003 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 PROGRAM 004 TEMPORARY DRAINAGE INLET PROTECTION EA 490.0000 5,880.00 11.000 5,390.00 005 STREET SWEEPING LS 30,000.0000 30,000.00 0.500 15,000.00 0.650 19,500.00 006 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 300.0000 300.00 0.500 150.00 1.000 300.00 007 CONSTRUCTION AREA SIGNS LS 400.0000 400.00 0.700 280.00 (S) 008 TRAFFIC CONTROL SYSTEM LS 75,000.0000 75,000.00 0.500 37,500.00 0.750 56,250.00 009 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,000.0000 5,000.00 0.400 2,000.00 0.900 4,500.00 (S) 010 REMOVE PAVEMENT MARKER EA 1.0000 290.00 290.000 290.00 011 REMOVE ASPHALT CONCRETE DIKE LF 5.6300 1,970.50 0.000 0.00 012 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.5000 2,790.00 2,904.000 4,356.00 2,904.000 4,356.00 013 ROADWAY EXCAVATION CY 54.0000 21,600.00 0.000 0.00 014 EROSION CONTROL (COMPOST BLANKET) CY 500.0000 2,500.00 0.000 0.00 015 HOT MIX ASPHALT (TYPE A) TON 122.0000 101,260.00 549.620 67,053.64 549.620 67,053.64 016 HOT MIX ASPHALT DIKE LF 16.0000 5,600.00 0.000 0.00 017 LIQUID ASPHALT (PRIME COAT) TON 2,880.0000 2,304.00 0.800 2,304.00 0.800 2,304.00 018 REPLACE CONCRETE PAVEMENT CY 488.0000 483,120.00 490.000 239,120.00 990.000 483,120.00 (RAPID STRENGTH CONCRETE) 019 FURNISH AND INSTALL DRAIN PIPE LF 18.0000 3,060.00 0.000 0.00 (HORIZONTAL DRAIN) 020 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 814.00 0.000 0.00 (S) 021 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.1000 126.00 0.000 0.00 022 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 2,816.00 0.000 0.00 (S) (BROKEN 36-12) PROGRAM CAS145 PAGE 2 DATE 10/24/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-268704 TIME 02:03 PM ESTIMATE NO. 02 BID OPENING 05/18/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: ARSHAD, MIAN DATE OF THIS ESTIMATE 10/24/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 PAVEMENT MARKER (NON-REFLECTIVE) EA 3.3000 792.00 0.000 0.00 024 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 468.00 0.000 0.00 025 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 600.0000 600.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 10/24/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-268704 TIME 02:03 PM ESTIMATE NO. 02 BID OPENING 05/18/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: ARSHAD, MIAN DATE OF THIS ESTIMATE 10/24/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 367,483.64 646,993.64 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 367,483.64 646,993.64 026 MOBILIZATION LS 70,000.0000 70,000.00 0.050 3,500.00 1.000 70,000.00 ORIGINAL CONTRACT AMOUNT 820,590.50 TOTAL WORK COMPLETED 370,983.64 716,993.64 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 370,983.64 716,993.64 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/01/11 80 08/11/11 08/01/11 12/02/11 53 0 0 0 87% 66% PROGRESS IS SATISFACTORY ARSHAD, MIAN RESIDENT ENGINEER PROGRAM CAS145 DATE 10/24/11