PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/20/07 EST. NO.02 TIME 09:16 AM R.E. NAME: BAGHERLL,AZITA 04-269604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/20/07 EST. NO.02 TIME 09:16 AM R.E. NAME: BAGHERLL,AZITA 04-269604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/20/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-269604 TIME 09:16 AM ESTIMATE NO. 02 BID OPENING 03/07/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: BAGHERLL,AZITA DATE OF THIS ESTIMATE 06/20/07 LOCATION RERUN PROGRESS ESTIMATE 04-CC-24-R0.1/R8.3 ----------------------- BAY CITIES PAVING & GRADING, IN CONTRA COSTA COUNTY IN LAFAYETTE INC AND ORINDA FROM THE CALDECOTT 55 SANTA CLARA AVE. SUITE 145 TUNNEL TO EL CURTOLA ROAD OAKLAND, CA 94520 OVERCROSSING FED. AID NO. ACNH-P024(29)E ROADWAY REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 22,500.0000 22,500.00 0.100 2,250.00 0.200 4,500.00 02 TIME-RELATED OVERHEAD LS 927,000.0000 927,000.00 0.060 55,620.00 0.100 92,700.00 03 PREPARE STORM WATER POLLUTION LS 1,989.0000 1,989.00 0.700 1,392.30 PREVENTION PLAN 04 WATER POLLUTION CONTROL LS 54,000.0000 54,000.00 0.150 8,100.00 0.200 10,800.00 05 TEMPORARY COVER M2 12.0000 1,200.00 0.000 0.00 06 STREET SWEEPING LS 110,000.0000 110,000.00 0.100 11,000.00 0.100 11,000.00 07 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 30,600.0000 30,600.00 0.050 1,530.00 0.200 6,120.00 08 CONSTRUCTION AREA SIGNS LS 41,108.0000 41,108.00 0.250 10,277.00 0.650 26,720.20 S) 09 TRAFFIC CONTROL SYSTEM LS 848,000.0000 848,000.00 0.060 50,880.00 0.100 84,800.00 S) 10 CHANNELIZER (SURFACE MOUNTED) EA 25.5000 3,570.00 43.000 1,096.50 93.000 2,371.50 S) 11 PORTABLE CHANGEABLE MESSAGE SIGN EA 5,400.0000 27,000.00 1.500 8,100.00 S) 12 TEMPORARY RAILING (TYPE K) M 19.5000 150,930.00 1,679.500 32,750.25 4,101.500 79,979.25 13 TEMPORARY CRASH CUSHION MODULE EA 178.5000 24,990.00 49.000 8,746.50 68.600 12,245.10 S) 14 REMOVE METAL BEAM GUARD RAILING M 22.4500 59,492.50 0.000 0.00 S) 15 REMOVE DOUBLE METAL BEAM GUARD RAILING M 33.0000 1,881.00 0.000 0.00 S) 16 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 5.1000 181,050.00 0.000 0.00 S) STRIPE 17 REMOVE YELLOW THERMOPLASTIC PAVEMENT M2 102.0000 510.00 0.000 0.00 S) MARKING 18 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 0.5100 27,540.00 0.000 0.00 S) 19 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 26.0000 18,200.00 0.000 0.00 S) 20 REMOVE PAVEMENT MARKER EA 2.5000 87,500.00 0.000 0.00 S) 21 REMOVE ASPHALT CONCRETE DITCH M 11.9500 6,094.50 0.000 0.00 22 REMOVE ASPHALT CONCRETE DIKE M 4.6500 34,875.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 06/20/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-269604 TIME 09:16 AM ESTIMATE NO. 02 BID OPENING 03/07/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: BAGHERLL,AZITA DATE OF THIS ESTIMATE 06/20/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE EDGE DRAIN M 8.3000 230,740.00 8,000.000 66,400.00 8,000.000 66,400.00 24 SALVAGE DOUBLE THRIE BEAM BARRIER M 34.0000 10,200.00 156.500 5,321.00 S) 25 ADJUST INLET EA 1,530.0000 321,300.00 0.000 0.00 26 ADJUST MANHOLE COVER TO GRADE EA 475.0000 2,850.00 0.000 0.00 27 ADJUST UTILITY COVER TO GRADE EA 300.0000 1,500.00 0.000 0.00 28 ADJUST METAL BEAM GUARD RAILING M 45.0000 2,070.00 0.000 0.00 29 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 3.0000 378,000.00 0.000 0.00 S) 30 REMOVE CONCRETE CURB M 21.1500 88,830.00 713.000 15,079.95 713.000 15,079.95 31 REMOVE CONCRETE BARRIER M 36.5000 64,240.00 1,757.000 64,130.50 1,757.000 64,130.50 32 REMOVE CRASH CUSHION (SAND FILLED) EA 186.0000 372.00 0.000 0.00 S) 33 CLEARING AND GRUBBING LS 44,000.0000 44,000.00 0.000 0.00 34 ROADWAY EXCAVATION M3 62.9500 115,198.50 0.000 0.00 35 ROADWAY EXCAVATION (TYPE Z-2) M3 202.0000 101,000.00 0.000 0.00 (AERIALLY DEPOSITED LEAD) 36 LEAD COMPLIANCE PLAN LS 2,244.0000 2,244.00 0.250 561.00 0.750 1,683.00 37 IMPORTED MATERIAL (SHOULDER BACKING) TONN 36.9000 114,759.00 0.000 0.00 38 EMBANKMENT M3 40.0000 3,000.00 0.000 0.00 39 ROADSIDE CLEARING LS 13,500.0000 13,500.00 0.000 0.00 40 FIBER ROLLS M 10.4000 10,608.00 0.000 0.00 41 IRRIGATION SYSTEM LS 11,379.0000 11,379.00 0.000 0.00 42 WATER METER EA 150,000.0000 150,000.00 0.000 0.00 43 200 MM WELDED STEEL PIPE CONDUIT M 912.8500 456,425.00 0.000 0.00 (6.35 MM THICK) 44 CLASS 4 AGGREGATE SUBBASE M3 141.0000 1,692.00 0.000 0.00 45 AGGREGATE BASE (APPROACH SLAB) M3 311.0000 30,478.00 50.370 15,665.07 50.370 15,665.07 46 CLASS 3 AGGREGATE BASE M3 158.5000 133,140.00 250.000 39,625.00 250.000 39,625.00 47 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 1,100.0000 2,200.00 0.000 0.00 48 SEAL RANDOM CRACKS LNKM 875.0000 96,250.00 0.000 0.00 49 REPLACE ASPHALT CONCRETE SURFACING M3 277.4000 202,502.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 06/20/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-269604 TIME 09:16 AM ESTIMATE NO. 02 BID OPENING 03/07/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: BAGHERLL,AZITA DATE OF THIS ESTIMATE 06/20/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 ASPHALT CONCRETE (TYPE A) TONN 73.1500 5,449,675.00 200.000 14,630.00 200.000 14,630.00 51 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 105.0000 7,140,000.00 0.000 0.00 52 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 53 PAVING ASPHALT (BINDER-PAVEMENT TONN 1.0000 600.00 0.000 0.00 REINFORCING FABRIC) 54 PAVEMENT REINFORCING FABRIC M2 1.1900 358,190.00 0.000 0.00 55 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 28.7500 155,250.00 1,168.000 33,580.00 1,168.000 33,580.00 AREA) 56 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 4.2500 5,057.50 0.000 0.00 57 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 3.6000 1,476.00 0.000 0.00 58 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 4.1000 18,450.00 0.000 0.00 59 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 3.7500 6,262.50 0.000 0.00 60 ASPHALTIC EMULSION (PAINT BINDER) TONN 885.0000 442,500.00 0.000 0.00 61 REPLACE CONCRETE PAVEMENT M3 714.0000 2,713,200.00 919.370 656,430.18 1,491.760 1,065,116.64 (RAPID STRENGTH CONCRETE) 62 CRACK EXISTING CONCRETE PAVEMENT M2 0.9500 152,000.00 0.000 0.00 63 GRIND EXISTING CONCRETE M2 9.1500 283,650.00 0.000 0.00 S) PAVEMENT 64 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,275.0000 1,189,575.00 212.760 271,269.00 212.760 271,269.00 (TYPE R) 65 MINOR CONCRETE (BACKFILL) M3 209.0000 392,920.00 0.000 0.00 66 PAVING NOTCH EXTENSION M3 8,160.0000 191,760.00 5.980 48,796.80 5.980 48,796.80 67 CLEAN EXPANSION JOINT M 128.0000 88,064.00 0.000 0.00 68 JOINT SEAL (MR 30 MM) M 235.0000 13,865.00 0.000 0.00 S) 69 JOINT SEAL (MR 15 MM) M 184.0000 53,728.00 0.000 0.00 S) 70 JOINT SEAL (MR 40 MM) M 204.0000 68,952.00 0.000 0.00 S) 71 450 MM SLOTTED CORRUGATED STEEL PIPE M 256.5000 16,672.50 0.000 0.00 (2.01 MM THICK) 72 DRAINAGE INLET MARKER EA 72.0000 3,744.00 0.000 0.00 73 MINOR CONCRETE (CURB) M3 1,172.0000 597,720.00 0.000 0.00 74 MINOR CONCRETE (WEED BARRIER) M3 6,400.0000 1,088,000.00 0.000 0.00 75 MINOR CONCRETE (PAVING) M3 1,041.0000 333,120.00 0.000 0.00 76 1.2 M CHAIN LINK GATE (TYPE CL-1.8) EA 2,550.0000 5,100.00 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 06/20/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-269604 TIME 09:16 AM ESTIMATE NO. 02 BID OPENING 03/07/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: BAGHERLL,AZITA DATE OF THIS ESTIMATE 06/20/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 CONCRETE BARRIER MARKER EA 16.0000 2,080.00 0.000 0.00 78 DELINEATOR (CLASS 1) EA 29.0000 22,040.00 0.000 0.00 79 HIGHWAY POST MARKER EA 43.0000 817.00 0.000 0.00 80 GUARD RAILING DELINEATOR EA 21.0000 5,880.00 0.000 0.00 81 OBJECT MARKER (TYPE K-1) EA 46.0000 1,794.00 0.000 0.00 82 OBJECT MARKER (TYPE L-1) EA 41.0000 4,100.00 0.000 0.00 83 METAL BEAM GUARD RAILING (STEEL POST) M 128.0000 202,240.00 0.000 0.00 S) 84 DOUBLE METAL BEAM GUARD RAILING M 143.0000 8,151.00 0.000 0.00 S) (STEEL POST) 85 SINGLE THRIE BEAM BARRIER (STEEL POST) M 107.0000 37,450.00 0.000 0.00 S) 86 DOUBLE THRIE BEAM BARRIER (STEEL POST) M 439.0000 4,390.00 0.000 0.00 S) 87 END CAP EA 102.0000 204.00 0.000 0.00 S) 88 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,122.0000 33,660.00 0.000 0.00 S) 89 END ANCHOR ASSEMBLY (TYPE CA) EA 1,700.0000 3,400.00 0.000 0.00 S) 90 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,550.0000 84,150.00 0.000 0.00 S) 91 CRASH CUSHION (REACT 9SCBS) EA 54,570.0000 218,280.00 0.000 0.00 S) 92 CONCRETE BARRIER (TYPE 60) M 210.0000 182,700.00 0.000 0.00 93 CONCRETE BARRIER (TYPE 60C) M 220.0000 162,800.00 0.000 0.00 94 CONCRETE BARRIER (TYPE 60E) M 592.0000 183,520.00 0.000 0.00 95 THERMOPLASTIC PAVEMENT MARKING M2 51.0000 35,700.00 0.000 0.00 S) 96 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0500 75,495.00 0.000 0.00 S) 97 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0500 18,450.00 0.000 0.00 S) 98 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0500 3,321.00 0.000 0.00 S) (BROKEN 3.66 M - 0.92 M) 99 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0500 2,730.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 00 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.0500 50,225.00 0.000 0.00 S) 01 PAVEMENT MARKER (REFLECTIVE) EA 4.1000 45,920.00 0.000 0.00 S) 02 MODIFY SIGNAL LS 15,300.0000 15,300.00 0.000 0.00 S) 03 MODIFY LIGHTING LS 13,260.0000 13,260.00 0.000 0.00 S) PROGRAM CAS145 PAGE 5 DATE 06/20/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-269604 TIME 09:16 AM ESTIMATE NO. 02 BID OPENING 03/07/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: BAGHERLL,AZITA DATE OF THIS ESTIMATE 06/20/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 TRAFFIC OPERATION SYSTEM LS 649,000.0000 649,000.00 0.000 0.00 S) 05 CAMERA UNIT INCLUDING TESTING EA 7,344.0000 7,344.00 0.000 0.00 S) 06 PAN AND TILT UNIT INCLUDING TEST EA 3,570.0000 3,570.00 0.000 0.00 S) 07 EXTINGUISHABLE MESSAGE SIGN RADIO EA 4,590.0000 4,590.00 0.000 0.00 S) CONTROLLER ASSEMBLY 08 EXTINGUISHABLE MESSAGE SIGN PANELS (LED) EA 9,078.0000 36,312.00 0.000 0.00 S) 09 GENERAL PACKET RADIO SYSTEM WIRELESS EA 2,040.0000 4,080.00 0.000 0.00 S) MODEM ASSEMBLY 10 HIGHWAY ADVISORY RADIO SYSTEM EA 19,380.0000 19,380.00 0.000 0.00 S) 11 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 12 ADJUST MANHOLE TO GRADE EA 385.0000 1,925.00 0.000 0.00 13 ADJUST FRAME AND GRATE TO GRADE EA 1,365.0000 38,220.00 0.000 0.00 14 MODIFY MECHANICAL EQUIPMENT LS 85,000.0000 85,000.00 0.000 0.00 S) 15 MODIFY INLET TO MANHOLE EA 2,500.0000 5,000.00 0.000 0.00 16 ASPHALT CONCRETE (OPEN GRADED) TONN 79.0000 3,523,400.00 0.000 0.00 17 ASPHALT CONCRETE (LEVELING) TONN 101.0000 82,820.00 0.000 0.00 18 MODIFY POP-UP CONTROL ELECTRICAL SYSTEM LS 33,660.0000 33,660.00 0.000 0.00 S) PROGRAM CAS145 PAGE 6 DATE 06/20/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-269604 TIME 09:16 AM ESTIMATE NO. 02 BID OPENING 03/07/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: BAGHERLL,AZITA DATE OF THIS ESTIMATE 06/20/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,408,417.75 1,982,025.31 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,408,417.75 1,982,025.31 19 MOBILIZATION LS 2700,000.0000 2,700,000.00 0.500 1,350,000.00 0.500 1,350,000.00 ORIGINAL CONTRACT AMOUNT 34,630,397.00 TOTAL WORK COMPLETED 2,758,417.75 3,332,025.31 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 2,758,417.75 3,332,025.31 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/12/07 320 04/30/07 04/30/07 08/15/08 32 2 0 0 10% 10% PROGRESS IS SATISFACTORY BAGHERLL,AZITA RESIDENT ENGINEER PROGRAM CAS145 DATE 06/20/07