PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/20/21 EST. NO. 005 TIME 12:44 PM R.E. NAME: DIKE EDDIE 04-2A3324 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0002 1,213.53 E.W. @ F.A.(+) 062121 N 0011.0 005 0001 2,496.59 E.W. @ F.A.(+) 052621 N 0006.0 0002 4,546.19 052721 N 0007.0 8,256.31 TOTAL THIS ESTIMATE 3,363.55 TOTAL PREVIOUS ESTIMATE 11,619.86 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/20/21 EST. NO. 005 TIME 12:44 PM R.E. NAME: DIKE EDDIE 04-2A3324 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2A3324 TIME 12:44 PM ESTIMATE NO. 005 BID OPENING 02/04/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/21 R.E. NAME: DIKE EDDIE DATE OF THIS ESTIMATE 09/20/21 LOCATION PROGRESS ESTIMATE 04-ALA-84-13.6/18.0 ----------------- BAY CITIES PAVING & GRADING, IN FREMONT, FROM ROUTE 238 (MISSION INC. BOULEVARD) TO ROUTE 680. 1450 CIVIC CT,BUILDING B #400 CONCORD, CA 94524-6227 FED. AID NO. HSNH-P084(55)E WIDEN SHOULDERS, INSTALL TRAFFIC ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,700.0000 2,700.00 1.000 2,700 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,849.2000 5,849.20 0.050 292.46 0.450 2,632 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,250.0000 500,000.00 20.000 25,000.00 95.000 118,750 004 DISPUTE RESOLUTION BOARD ON-SITE EA 6,000.0000 54,000.00 1.000 6,000.00 2.000 12,000 MEETING 005 HOURLY OFF-SITE HR 200.0000 8,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 11,607.1400 11,607.14 0.050 580.36 0.400 4,642 007 CONSTRUCTION AREA SIGNS LS 14,250.0000 14,250.00 0.500 7,125 008 TRAFFIC CONTROL SYSTEM LS 839,800.0000 839,800.00 0.050 41,990.00 0.450 377,910 009 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.7000 15,050.00 24,381.000 17,066 010 CHANNELIZER (SURFACE MOUNTED) EA 45.0000 2,340.00 16.000 720.00 44.000 1,980 011 CHANNELIZER (SURFACE MOUNTED) EA 45.0000 900.00 10.000 450.00 10.000 450 (LEFT IN PLACE) 012 PORTABLE RADAR SPEED FEEDBACK SIGN EA 111.6300 22,326.00 50.000 5,581.50 50.000 5,581 SYSTEM DAY 013 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 24,666.3900 24,666.39 0.050 1,233.32 0.550 13,566 014 TEMPORARY RAILING (TYPE K) LF 24.1400 267,954.00 580.000 14,001.20 9,280.000 224,019 015 TEMPORARY ALTERNATIVE CRASH CUSHION EA 3,500.0000 105,000.00 2.000 7,000.00 22.000 77,000 016 JOB SITE MANAGEMENT LS 53,880.2600 53,880.26 0.050 2,694.01 0.300 16,164 017 PREPARE STORM WATER POLLUTION PREVENTION LS 44,500.0000 44,500.00 0.750 33,375 PLAN 018 RAIN EVENT ACTION PLAN EA 500.0000 31,500.00 0.000 0 019 STORM WATER SAMPLING AND ANALYSIS DAY EA 180.0000 8,640.00 0.000 0 020 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 021 TEMPORARY COVER SQYD 2.5000 500.00 0.000 0 022 TEMPORARY DRAINAGE INLET PROTECTION EA 175.0000 1,925.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 09/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2A3324 TIME 12:44 PM ESTIMATE NO. 005 BID OPENING 02/04/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/21 R.E. NAME: DIKE EDDIE DATE OF THIS ESTIMATE 09/20/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY FIBER ROLL LF 2.8500 41,610.00 200.000 570.00 9,803.000 27,938 024 TEMPORARY REINFORCED SILT FENCE LF 4.7000 14,617.00 0.000 0 025 TEMPORARY SILT FENCE LF 2.9600 6,778.40 2,992.000 8,856 026 STREET SWEEPING LS 17,456.1600 17,456.16 0.050 872.81 0.350 6,109 027 TEMPORARY ACTIVE TREATMENT SYSTEM LS 47,326.2500 47,326.25 0.000 0 028 TEMPORARY CONCRETE WASHOUT LS 6,811.0200 6,811.02 0.010 68 029 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 240.0000 43,200.00 0.000 0 030 TEMPORARY CREEK DIVERSION SYSTEMS LS 165,500.0000 165,500.00 0.050 8,275.00 0.900 148,950 031 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 0.8000 6,960.00 0.000 0 (HAZARDOUS WASTE) 032 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.8000 9,120.00 7,736.000 6,188 STRIPE (HAZARDOUS WASTE) 033 WORK AREA MONITORING (BRIDGE) LS 30,136.0000 30,136.00 0.000 0 034 TREATED WOOD WASTE LB 0.4000 33,000.00 0.000 0 035 NOISE MONITORING LS 2,114.0900 2,114.09 0.000 0 036 REMOVE CONCRETE (SQYD) SQYD 34.3400 3,296.64 0.000 0 037 TEMPORARY HIGH-VISIBILITY FENCE LF 2.6500 3,233.00 0.000 0 038 CLEARING AND GRUBBING (LS) LS 157,000.0000 157,000.00 0.200 31,400.00 1.000 157,000 039 ROADWAY EXCAVATION CY 57.2600 381,924.20 1,108.000 63,444.08 6,291.370 360,243 040 ROADWAY EXCAVATION (TYPE Z-2) CY 170.8900 290,513.00 1,700.000 290,513 (AERIALLY DEPOSITED LEAD) 041 CHANNEL EXCAVATION CY 84.6600 118,524.00 700.000 59,262.00 700.000 59,262 042 STRUCTURE EXCAVATION (BRIDGE) CY 200.0000 72,000.00 180.000 36,000.00 360.000 72,000 (F) 043 STRUCTURE BACKFILL (BRIDGE) CY 380.0000 46,740.00 60.000 22,800.00 60.000 22,800 (F) 044 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 045 ROADSIDE CLEARING LS 10,000.0000 10,000.00 0.200 2,000.00 0.600 6,000 046 SOIL AMENDMENT CY 96.0000 153.60 0.000 0 047 PACKET FERTILIZER EA 0.8000 72.00 0.000 0 048 PLANT (GROUP H) EA 50.0000 750.00 0.000 0 049 PLANT (GROUP B) EA 38.0000 266.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 09/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2A3324 TIME 12:44 PM ESTIMATE NO. 005 BID OPENING 02/04/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/21 R.E. NAME: DIKE EDDIE DATE OF THIS ESTIMATE 09/20/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 PLANT (GROUP U) EA 103.0000 2,369.00 0.000 0 051 PLANT ESTABLISHMENT WORK LS 5,200.0000 5,200.00 0.000 0 052 WOOD MULCH CY 78.4000 290.08 0.000 0 053 FOLIAGE PROTECTOR EA 96.0000 4,320.00 0.000 0 054 1" WYE STRAINER ASSEMBLY EA 226.0000 678.00 0.000 0 055 RISER SPRINKLER ASSEMBLY EA 43.0000 1,935.00 0.000 0 056 CAM COUPLER ASSEMBLY EA 1,150.0000 3,450.00 0.000 0 057 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 2.3500 1,884.70 0.000 0 (F) LINE) 058 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 2.5000 425.00 0.000 0 (F) LINE) 059 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 2.8100 379.35 0.000 0 (F) (SUPPLY LINE) 060 2" PLASTIC PIPE (SCHEDULE 40) LF 15.5000 1,193.50 0.000 0 (F) (SUPPLY LINE) 061 BALL VALVE EA 165.0000 1,155.00 0.000 0 062 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 450.0000 2,700.00 0.000 0 063 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 1.4000 3,640.00 0.000 0 064 HYDROMULCH SQFT 0.0500 9,000.00 0.000 0 065 FIBER ROLLS LF 2.8500 22,087.50 0.000 0 066 COMPOST SOCK LF 38.0000 2,850.00 0.000 0 067 HYDROSEED SQFT 0.1700 30,600.00 0.000 0 068 COMPOST (CY) CY 58.0000 15,080.00 0.000 0 069 INCORPORATE MATERIALS SQFT 0.0400 3,260.00 0.000 0 070 CLASS 3 AGGREGATE SUBBASE CY 72.1500 84,415.50 1,018.410 73,478 071 CLASS 2 AGGREGATE BASE (CY) CY 98.6400 230,817.60 150.000 14,796.00 2,186.810 215,706 072 HOT MIX ASPHALT (TYPE A) TON 131.4200 662,356.80 452.700 59,493.83 4,301.630 565,320 073 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 135.0000 207,900.00 1,009.890 136,335 074 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 12.8200 961.50 0.000 0 075 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 13.5800 9,506.00 0.000 0 076 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 12.5300 4,009.60 0.000 0 PROGRAM CAS145 PAGE 4 DATE 09/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2A3324 TIME 12:44 PM ESTIMATE NO. 005 BID OPENING 02/04/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/21 R.E. NAME: DIKE EDDIE DATE OF THIS ESTIMATE 09/20/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 PLACE HOT MIX ASPHALT SQYD 54.0300 8,104.50 0.000 0 (MISCELLANEOUS AREA) 078 TACK COAT TON 867.0800 36,417.36 10.440 9,052 079 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 123.2600 2,341.94 0.000 0 080 REMOVE ASPHALT CONCRETE DIKE LF 7.3900 3,103.80 150.000 1,108 081 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 12.6200 63,731.00 1,613.000 20,356 082 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 505.0000 277,750.00 224.000 113,120.00 300.000 151,500 083 30" CAST-IN-DRILLED-HOLE CONCRETE LF 1,000.0000 160,000.00 0.000 0 PILE (SIGN FOUNDATION) 084 48" CAST-IN-DRILLED-HOLE CONCRETE LF 2,500.0000 90,000.00 0.000 0 PILE (SIGN FOUNDATION) 085 STRUCTURAL CONCRETE, BRIDGE CY 1,100.0000 206,800.00 100.000 110,000.00 100.000 110,000 (F) 086 STRUCTURAL CONCRETE, BRIDGE CY 950.0000 267,900.00 150.000 142,500.00 150.000 142,500 (F) (POLYMER FIBER) 087 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 2,000.0000 554,000.00 0.000 0 (F) 088 CONCRETE SURFACE TEXTURE (ROCK) CY 45.0000 15,525.00 172.500 7,762.50 172.500 7,762 (F) 089 STRUCTURAL CONCRETE, BARRIER SLAB CY 825.0000 53,625.00 0.000 0 (F) 090 AGGREGATE BASE (APPROACH SLAB) CY 1,500.0000 3,000.00 0.000 0 091 STRUCTURAL CONCRETE, APPROACH SLAB CY 3,600.0000 86,400.00 0.000 0 (TYPE R) 092 STRUCTURAL CONCRETE, HEADWALL CY 980.0000 9,212.00 0.000 0 (F) 093 STRUCTURAL CONCRETE, DRAINAGE INLET CY 3,906.8667 3,516.18 0.000 0 (F) 094 MINOR CONCRETE (MINOR STRUCTURE) CY 1,650.0000 32,010.00 0.000 0 (F) 095 PAVING NOTCH EXTENSION CF 2,000.0000 9,000.00 0.000 0 096 DRILL AND BOND DOWEL LF 54.0000 52,164.00 0.000 0 097 CLEAN EXPANSION JOINT LF 40.0000 3,360.00 0.000 0 098 JOINT SEAL (MR 1/2") LF 85.0000 4,930.00 0.000 0 099 JOINT SEAL (MR 1") LF 120.0000 10,440.00 0.000 0 100 BAR REINFORCING STEEL LB 2.8000 20,543.60 0.000 0 (F) 101 BAR REINFORCING STEEL (BRIDGE) LB 1.3400 155,110.36 50,000.000 67,000.00 50,000.000 67,000 (F) 102 HEADED BAR REINFORCEMENT EA 5.8000 962.80 95.000 551.00 95.000 551 (F) 103 REMOVE ASPHALT CONCRETE SURFACING SQFT 1.7000 43,860.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 09/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2A3324 TIME 12:44 PM ESTIMATE NO. 005 BID OPENING 02/04/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/21 R.E. NAME: DIKE EDDIE DATE OF THIS ESTIMATE 09/20/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 1.0000 27,800.00 0.000 0 105 FURNISH POLYESTER CONCRETE OVERLAY CF 80.0000 185,600.00 0.000 0 106 PLACE POLYESTER CONCRETE OVERLAY SQFT 1.0000 27,750.00 0.000 0 (F) 107 BRIDGE REMOVAL LS 70,000.0000 70,000.00 0.500 35,000.00 1.000 70,000 108 BRIDGE REMOVAL (PORTION) LS 1,370,000.0000 1,370,000.00 0.000 0 109 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 110 18" ALTERNATIVE PIPE CULVERT LF 525.0100 29,400.56 20.000 10,500.20 20.000 10,500 111 24" ALTERNATIVE PIPE CULVERT LF 534.4300 42,754.40 0.000 0 112 CONCRETE BACKFILL (PIPE TRENCH) CY 1,066.0500 114,387.17 9.000 9,594.45 9.000 9,594 (F) 113 PERMEABLE CLASS II CY 214.7100 51,959.82 0.000 0 (F) 114 DRAINAGE INLET MARKER EA 40.0000 360.00 0.000 0 115 REMOVE CULVERT (LF) LF 44.0300 5,723.90 0.000 0 116 REMOVE INLET EA 970.0200 970.02 0.000 0 117 REMOVE HEADWALL EA 2,908.5800 2,908.58 0.000 0 118 ADJUST INLET EA 6,811.0200 54,488.16 0.000 0 119 CONCRETE (DITCH LINING) CY 1,816.2700 99,894.85 0.000 0 120 CLASS VI ROCK SLOPE PROTECTION CY 241.9400 51,291.28 0.000 0 121 CLASS VIII ROCK SLOPE PROTECTION CY 264.0300 181,388.61 0.000 0 122 ROCK GROUP A, PLACEMENT METHOD A CY 255.1800 5,358.78 0.000 0 123 ROCK GROUP B, PLACEMENT METHOD A CY 277.5300 4,995.54 0.000 0 124 ENGINEERED STREAMBED MATERIAL-1, CY 212.2500 46,907.25 0.000 0 PLACEMENT METHOD B 125 ENGINEERED STREAMBED MATERIAL-2, CY 530.6200 192,615.06 0.000 0 PONDING 126 CABLE NET DRAPERY SYSTEM SQFT 9.7100 310,720.00 32,000.000 310,720 127 MISCELLANEOUS IRON AND STEEL LB 1.5000 489.00 0.000 0 (F) 128 MISCELLANEOUS METAL (BRIDGE) LB 10.0000 4,920.00 0.000 0 (F) 129 PREPARE AND STAIN CONCRETE SQFT 11.0000 5,049.00 0.000 0 130 STAIN GALVANIZED SURFACES (LS) LS 245,000.0000 245,000.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 09/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2A3324 TIME 12:44 PM ESTIMATE NO. 005 BID OPENING 02/04/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/21 R.E. NAME: DIKE EDDIE DATE OF THIS ESTIMATE 09/20/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 131 FENCE (TYPE WM AND BW) LF 12.5000 4,125.00 0.000 0 132 CHAIN LINK FENCE (TYPE CL-8) LF 75.0000 2,175.00 0.000 0 133 12' CHAIN LINK GATE (TYPE CL-8) EA 4,000.0000 4,000.00 0.000 0 134 REMOVE FENCE LF 5.0000 1,650.00 0.000 0 135 REMOVE GATE EA 500.0000 500.00 0.000 0 136 REMOVE PAVEMENT MARKER EA 1.0000 1,680.00 1,546.000 1,546 137 GUARD RAILING DELINEATOR EA 25.0000 12,250.00 0.000 0 138 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 8,800.00 591.000 2,955 139 OBJECT MARKER (TYPE P) EA 75.0000 825.00 0.000 0 140 OBJECT MARKER (TYPE L-2) EA 50.0000 600.00 0.000 0 141 REMOVE ROADSIDE SIGN EA 80.0000 3,760.00 0.000 0 142 REMOVE METAL POST EA 100.0000 800.00 0.000 0 143 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 22.0000 5,940.00 0.000 0 (0.063"-UNFRAMED) 144 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 22.0000 792.00 0.000 0 (0.080"-UNFRAMED) 145 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 28.0000 1,484.00 0.000 0 (0.063"-FRAMED) 146 ROADSIDE SIGN - ONE POST EA 250.0000 10,000.00 0.000 0 147 ROADSIDE SIGN - TWO POST EA 450.0000 1,800.00 0.000 0 148 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 27.5000 251,350.00 0.000 0 149 VEGETATION CONTROL (MINOR CONCRETE) SQYD 53.0000 272,420.00 0.000 0 150 CHAIN LINK RAILING (VINYL-CLAD MODIFIED) LF 55.0000 23,100.00 0.000 0 (F) 151 CONCRETE BARRIER (TYPE K) LF 55.3500 61,438.50 1,120.000 61,992 152 TRANSITION RAILING (TYPE WB-31) EA 4,500.0000 63,000.00 0.000 0 153 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,300.0000 2,600.00 0.000 0 154 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,375.0000 151,875.00 0.000 0 155 REUSABLE CRASH CUSHION EA 34,000.0000 102,000.00 0.000 0 156 CONCRETE BARRIER (TYPE 60M) LF 225.0000 110,250.00 0.000 0 157 CALIFORNIA ST-75 BRIDGE RAIL LF 495.0000 924,660.00 110.000 54,450.00 110.000 54,450 (F) PROGRAM CAS145 PAGE 7 DATE 09/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2A3324 TIME 12:44 PM ESTIMATE NO. 005 BID OPENING 02/04/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/21 R.E. NAME: DIKE EDDIE DATE OF THIS ESTIMATE 09/20/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 158 CALIFORNIA ST-75 BRIDGE RAIL (MODIFIED) LF 360.0000 151,200.00 0.000 0 (F) 159 REMOVE GUARDRAIL LF 4.2500 27,030.00 650.000 2,762 160 REMOVE CONCRETE BARRIER (TYPE K) LF 10.1700 5,796.90 570.000 5,796 161 THERMOPLASTIC TRAFFIC STRIPE LF 4.0000 116,000.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 162 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 6.0000 11,580.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 163 REMOVE PAINTED TRAFFIC STRIPE LF 0.5000 5,750.00 0.000 0 164 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 8,200.00 9,468.000 4,734 165 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 4,360.00 46.000 184 166 12" RUMBLE STRIP STA 60.8100 9,121.50 0.000 0 (ASPHALT CONCRETE PAVEMENT) 167 CONTRAST STRIPE THERMOPLASTIC LF 0.3000 5,070.00 0.000 0 168 SIGNAL AND LIGHTING SYSTEM (LOCATION 1) LS 200,000.0000 200,000.00 0.049 9,800.00 0.334 66,800 169 SIGNAL AND LIGHTING SYSTEM (LOCATION 2) LS 275,000.0000 275,000.00 0.131 36,025 170 LIGHTING SYSTEM LS 195,000.0000 195,000.00 0.010 1,950.00 0.301 58,695 171 FLASHING BEACON SYSTEM LS 195,000.0000 195,000.00 0.038 7,410.00 0.038 7,410 172 DYNAMIC ACTIVE WARNING SYSTEM LS 297,000.0000 297,000.00 0.451 133,947.00 0.922 273,834 173 RADAR SPEED FEEDBACK SIGN SYSTEMS LS 485,000.0000 485,000.00 0.238 115,430.00 0.703 340,955 174 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 175 1 1/2" CONDUIT (BRIDGE) LF 40.0000 39,640.00 0.000 0 PROGRAM CAS145 PAGE 8 DATE 09/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2A3324 TIME 12:44 PM ESTIMATE NO. 005 BID OPENING 02/04/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/21 R.E. NAME: DIKE EDDIE DATE OF THIS ESTIMATE 09/20/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,223,471.72 4,900,518.29 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 8,256.31 11,619.86 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,231,728.03 4,912,138.15 176 MOBILIZATION LS 1,578,235.1000 1,578,235.10 0.950 1,499,323 ORIGINAL CONTRACT AMOUNT 15,782,351.00 TOTAL WORK COMPLETED 1,231,728.03 6,411,461.50 MATERIALS ON HAND ON SITE -855.00 40,000.00 DEDUCTIONS 0.00 0.00 TOTAL 1,230,873.03 6,451,461.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/11/21 650 05/05/21 05/05/21 12/27/22 83 12 0 0 40% 13% PROGRESS IS SATISFACTORY DIKE EDDIE RESIDENT ENGINEER PROGRAM CAS145 DATE 09/20/21