PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/19/13 EST. NO.09 TIME 12:47 PM R.E. NAME: SEALEY, HERMAN 04-2E2304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 2,500.00 E.W. @ F.A.(+) 031313 N 7001 0 0002 2,500.00 031413 N 913319 0003 2,500.00 031513 N 913320 007 0001 45,209.45 A.C. @ L.S.(+) 032213 Y 007001 52,709.45 TOTAL THIS ESTIMATE 54,580.00 TOTAL PREVIOUS ESTIMATE 107,289.45 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/19/13 EST. NO.09 TIME 12:47 PM R.E. NAME: SEALEY, HERMAN 04-2E2304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/19/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2E2304 TIME 12:47 PM ESTIMATE NO. 09 BID OPENING 08/08/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/13 R.E. NAME: SEALEY, HERMAN DATE OF THIS ESTIMATE 09/19/13 LOCATION PROGRESS ESTIMATE 04-CC-4-R20.1/R45.6 ----------------- 04-CC-24-R2.3/R4.9 PACIFIC STATES ENVIRONMENTAL IN CONTRA COSTA COUNTY AT VARIOUS 04-CC-80-4.2/8.5 CONTRACTORS, INC. LOCATIONS 11555 DUBLIN BLVD DUBLIN, CA 94568 FED. AID NO. ACBR-X013-E(24) ,NH- ( ) REPLACE APPROACH SLABS AND JOINT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 1,000.0000 1,000.00 0.620 620.00 0.982 982 002 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750 PROGRAM 003 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 3,000.0000 3,000.00 0.078 234.00 0.980 2,940 004 CONSTRUCTION AREA SIGNS LS 22,000.0000 22,000.00 0.700 15,400 005 TRAFFIC CONTROL SYSTEM LS 210,000.0000 210,000.00 0.048 10,080.00 0.980 205,800 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 16,000.0000 16,000.00 0.048 768.00 0.980 15,680 007 NOISE MONITORING LS 3,000.0000 3,000.00 0.737 2,211 008 REMOVE ASPHALT CONCRETE SURFACING SQFT 2.0000 28,182.00 0.000 0 009 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 25.0000 11,500.00 0.000 0 010 REMOVE UNSOUND CONCRETE CF 35.0000 34,195.00 -695.530 -24,343.55 37.220 1,302 011 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2000 52,743.40 227,828.000 45,565 (F) 012 ACCESS OPENING, SOFFIT EA 6,000.0000 12,000.00 2.000 12,000 013 BRIDGE REMOVAL (PORTION), LOCATION A LS 4,500.0000 4,500.00 1.000 4,500 014 BRIDGE REMOVAL (PORTION), LOCATION B LS 4,500.0000 4,500.00 1.000 4,500 015 EMBANKMENT CY 450.0000 7,650.00 0.000 0 016 AGGREGATE BASE (APPROACH SLAB) CY 230.0000 9,660.00 163.000 37,490 017 HOT MIX ASPHALT (TYPE A) TON 380.0000 30,400.00 0.000 0 018 STRUCTURAL CONCRETE, BRIDGE CY 10,000.0000 10,000.00 1.630 16,300 019 STRUCTURAL CONCRETE, APPROACH SLAB CY 925.0000 384,800.00 493.000 456,025 (TYPE R) 020 PAVING NOTCH EXTENSION CF 225.0000 33,525.00 149.000 33,525 021 CLEAN EXPANSION JOINT LF 10.0000 29,990.00 710.000 7,100.00 2,514.000 25,140 022 RAPID SETTING CONCRETE PATCH CF 30.0000 29,310.00 -695.530 -20,865.90 37.220 1,116 PROGRAM CAS145 PAGE 2 DATE 09/19/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2E2304 TIME 12:47 PM ESTIMATE NO. 09 BID OPENING 08/08/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/13 R.E. NAME: SEALEY, HERMAN DATE OF THIS ESTIMATE 09/19/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FURNISH POLYESTER CONCRETE OVERLAY CF 65.0000 183,170.00 0.000 0 024 PLACE POLYESTER CONCRETE OVERLAY SQFT 3.0000 42,273.00 0.000 0 (F) 025 PUBLIC SAFETY PLAN LS 4,000.0000 4,000.00 1.000 4,000 026 JOINT SEAL (MR 1/2") LF 35.0000 23,660.00 430.000 15,050 027 JOINT SEAL (MR 1") LF 35.0000 7,980.00 228.000 7,980 028 JOINT SEAL (MR 1 1/2") LF 55.0000 87,560.00 650.000 35,750.00 1,384.000 76,120 029 JOINT SEAL (MR 2") LF 85.0000 23,035.00 60.000 5,100.00 240.000 20,400 030 BONDED JOINT SEAL (MR=1") LF 75.0000 18,150.00 249.000 18,675.00 249.000 18,675 031 WBA NEOPRENE STRIP GLAND MR=1 1/2" LF 35.0000 11,480.00 328.000 11,480 032 BAR REINFORCING STEEL (BRIDGE) LB 100.0000 3,300.00 49.000 4,900 (F) 033 TREAT BRIDGE DECK SQFT 0.4000 99,850.40 227,828.000 91,131 (F) 034 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 50.0000 138,750.00 2,965.000 148,250 035 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.2000 11,436.00 6,549.000 7,858 036 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.2500 2,655.00 1,013.000 2,279 037 THERMOPLASTIC PAVEMENT MARKING SQFT 5.5000 3,960.00 644.000 3,542 038 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5500 9,790.00 7,592.000 4,175 (BROKEN 35-13) 039 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 150.00 0.000 0 (BROKEN 17-7) 040 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.2500 3,330.00 805.000 1,811 041 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.6000 2,800.00 364.000 2,038 042 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,050.0000 1,050.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 09/19/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2E2304 TIME 12:47 PM ESTIMATE NO. 09 BID OPENING 08/08/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/13 R.E. NAME: SEALEY, HERMAN DATE OF THIS ESTIMATE 09/19/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 33,117.55 1,300,919.40 ADJUSTMENT OF COMPENSATION 45,209.45 88,209.45 EXTRA WORK 7,500.00 19,080.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 85,827.00 1,408,208.85 043 MOBILIZATION LS 175,000.0000 175,000.00 1.000 175,000 ORIGINAL CONTRACT AMOUNT 1,792,334.80 TOTAL WORK COMPLETED 85,827.00 1,583,208.85 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 85,827.00 1,583,208.85 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/04/12 110 10/19/12 10/19/12 09/30/13 104 125 0 0 94% 95% PROGRESS IS SATISFACTORY SEALEY, HERMAN RESIDENT ENGINEER PROGRAM CAS145 DATE 09/19/13